WALL FOOTING
T
L = LENGTH
W
FORMULA: VOLUME = L * W * T
CLASS A CONCRETE MIX
Enter Length LT (M) 32.00 M
Enter Width W (M) 0.30 M
Enter Thickness T (M) 0.15 M
TOTAL VOLUME OF CONCRETE: 1.44 CU.M.
# OF CEMENT BAGS 13.00 BAGS
W
2
FORMULA: VOLUME = LT * W * D
CLASS A CONCRETE MIX
LT EnterTotal Length LT (M) 5.00 M
Enter Width W (M) 0.20 M
BEAM DIMENSIONS: Enter Depth D (M) 0.30 M
D TOTAL VOLUME OF CONCRETE: 0.30 CU.M.
# OF CEMENT BAGS 3.00 BAGS
VOL. OF SAND CU.M. 0.20 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 0.30 CU.M.
W
CONCRETE STAIRS
RIPRAPING WORKS
W1 L
Enter Height H (M) 2.00 M
₱14,409.00
₱9,606.00 ₱24,015.00
₱0.00
₱2,881.80
₱26,896.80
₱24,015.00
₱783.71
₱699.74
₱419.84
FOOTING MATTING
Enter Footing Length L (M) 0.60 M
Enter Footing Width W (M) 0.60 M
Enter # of Bars along L # 4.00 Pcs
Enter Number of Bars along W # 4.00 Pcs
L Enter Number of Footing # 10.00 Units
Clear
Cover
Tie Bars
Spacing
D1
H
Clear
Cover for
D2 columns
= 0.40m
1 0.2
Use End Hook: 0.200 M
Total length of each bars should be more than or equal to: 4.20 M
Total Number of Vertical Bars @ 6M: 48.00 LHS
6 Circular Stirrups
Cut Length of each stirrups: 0.90 M
Number of Stirrups per Column: 28.50 M
Total Number of Bars required for stirrups @ 6M : 35.00 LHS
#16 TIE WIRE required: 7.80 Kgs
BEAM REINFORCEMENT (BEAM TO BEAM = LESS THAN 6.0 METERS) ONE BAY
L = Span
L/4
0.15
L
Colum
n
Width TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 3.00 PCS
# of 6m Length Deformed Bars required as Non-Continuous Bars - PCS
WEB BARS
# of 6m Length Deformed Bars required as Web Bars - PCS
BOTTOM BARS
# of 6m Length Deformed Bars required as Continuous Bars 2.00 PCS
# of 6m Length Deformed Bars required as Non-Continuous Bars - PCS
L/4 L/4
0.15
L 0.15 L
CONCRETE STAIRS
Enter Riser Height RH (M) 0.20 M
T Enter Tread Run TR (M) 0.30 M
W R Enter Stair Width W (M) 1.00 M
Enter # of Steps N 10.00 Steps
R
H Enter Stringer Thickness TS (M) 0.15 M
0.30 0.36 0.66
0.30
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.30 12
Enter Stringer Lateral Bar diameter (mm)
T
16 S
0.30
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.30 12
Enter Stringer Horizontal Bar diameter (mm)
12
Number of 12 mm Lateral Bars required @ StepsPCS @ 6M 5.00 PCS
Number of 12 mm Horizontal Bars required @ StepsPCS @ 6M 5.00 PCS
Number of 16 mm Lateral Bars required @ StringerPCS @ 6M 4.00 PCS
Number of 12 mm Horizontal Bars required @ StringerPCS @ 6M 2.00 PCS
# OF #16 TIE WIRE USED KGS 1.00 KGS
NOTES: DOWELS FOR LATERAL BARS ARE ALREADY INCLUDED IN THE ESTIMATES
FOR STAIRS LANDINGS YOU MAY USE THE SLAB REINFORCEMENT CALCULATOR
CONCRETE CANAL
TOP
OPENING
WIDTH Stiffener
G
H
H
A
A
C
T
T
T
L
G
I
Enter Canal Flooring Thickness (M) 0.15 M
WIDTH
W2
W1
W1
NUMBER OF BOARD FOOT OF STUDS & NAILING JOIST PER SQUARE METER
SPACING IN CENTIMETER (CENTER TO CENTER)
Lumber size
in inches 30 x 30 30 x 60 40 x 40 40 x 60 60 x 60
1x2 4.103 3.147 3.189 2.686 2.268
2x2 8.198 6.293 6.379 5.373 4.594
2x3 12.284 9.440 9.569 8.060 6.898
2x4 16.414 12.592 12.758 10.746 9.195
₱8,147.50
₱5,431.67 ₱13,579.17
₱0.00
₱1,629.50
₱15,208.67
₱13,579.17
₱512.08
₱457.21
₱274.33 ₱548.65
LEGEND:
NOTE: RESULTS ARE ONLY ESTIMATED AND MAY VARY IN ACTUAL USAGE. USE CONTENGENCIES IF NECESSARY.
CHB WALLS
CONCRETE HOLLOW BLOCKS
USE:
Total number of CHB 429.00
USE:
DRYWALL PARTITION
BOARD AND ACCESSORIES
Wall Dimensions
Height of Wall 3.30 m
Length of Wall 9.00 m
Area of Wall 29.70 sq.m. Perimeter 9.00
USE:
Screw 873
USE:
Costing
Material Unit Qty
CHB 6" PCS 429.00
Cement BAGS 49.00
0.20 m Sand CU.M 3.00
0.40 m Rebar 10mm PCS 32.00
0.15 m Tie Wire kg 2.00
0.08 sq.m.
Material Cost
Labor
0.08 mm Markup
0.05 mm VAT 12%
0.20 mm Total Cost
4.00 Total Direct Cost
0.003 cu.m. Total Unit Cost
Total Direct Unit Cost
Total Material Unit Cost
pcs
bags
cu.m.
pcs
kgs
kgs
Costing Interior
Material Unit Qty
pcs Hardieflex Board 4x8 PCS 21.00
Screw PCS 873.20
pcs Tape (250') ROLLS 10.00
Jointing Compound BAGS 1.00
rolls Studs 35mmX76mmX3.0M, T=0.80mm PCS 27.00
Tracks 35mmX76mmX3.0M, T=0.80mm PCS 6.00
bags Blind Rivets BOX 1.00
Material Cost
Labor
Markup
VAT 12%
Total Cost
Total Direct Cost
pcs Total Unit Cost
Total Direct Unit Cost
pcs Total Material Unit Cost
pcs
pcs
pcs
pcs
Unit Cost Total Cost
₱18.00 ₱7,722.00
₱205.00 ₱10,045.00 1 2
₱650.00 ₱1,950.00 CEMENT FACTOR PER CUBIC METER OF MORTAR
₱126.00 ₱4,032.00 A. B. C. D.
₱100.00 ₱200.00 18 12 9 7.5
₱23,949.00
₱15,966.00 ₱39,915.00
₱0.00
₱4,789.80
₱44,704.80
₱39,915.00
₱1,302.59
₱1,163.02
₱697.81
12 13.5
6 7.5 9 10.5
BY: ENGR. RONALD JOHN R. CAJILLA
ROOFING WORKS
Effec
tive W
i dth
Side 1
lappi
ng Length
eet
Side Lapping 2 1/2 1 1/2
oo f Sh
R
Effective Width 0.60 0.70
2
gth
Len - 30 cm
End Lappingheet25cm g
o f S l a ppin
Ro End
Ls
Span
Projection
(Bulada)
Pitch
12
Note: Must multiply by two if the other side of the roof is similar
h
t
f
i Roof Width
ROOF ACCESSORIES
TILING WORKS
Enter Wall or Floor Area 4.00 SQ.M.
Enter Breakage Allowance (5 - 10%) 5.00 %
Labor (35-45%) 40.00 %
Markup - %
Price
₱4,002.00
₱2,668.00 ₱6,670.00
₱0.00
₱800.40
₱7,470.40
₱6,670.00
1867.6
1667.5
1000.5
Primer for
3. Red Oxide ferrous and Paint 3 Hours 35 to 40
Primer non-ferrous Thinner sq.m.
materials
Rust
preventive
4. Red Lead Paint 30 to 40
primer for 3 Hours
Primer Thinner sq.m.
ferrous
surfaces
Exterior &
1. Acrylic Interior 1/2 lts/ 4 lts 30 minutes 30 to 40
Latex Paint masonry water allow 6 hrs sq.m.
surfaces b4 recoat
Exterior &
30 minutes
3. Acrylic Interior Water allow 6 hrs 30 to 40
Gloss Latex masonry b4 recoat sq.m.
surfaces
For
furniture,
cabinets,
doors, 1 Hour.
4. Latex Hi- windows, Allow 4 hrs 30 to 40
Gloss Usse as is
tools, toys, before sq.m.
Enamel
wrought recoating
iron, &
primed
metals
5. Tinting Acrylic
water
Colors colors
ROOF PAINT
KIND OF PAINT USES THINING DRYING TIMECOVERAGE/Gal
G.I. roofs
and other 6 hrs. allow
2. Davies Paint overnight 30 to 40
Roof paint asmetal such Thinner before sq.m.
aluminum
recoating
and steel
for exterior
1. Quick & interior 5 hrs. allow
Drying wood and Paint 8 hrs. before 30 to 40
Enamel metal Thinner recoating sq.m.
surface
3 hrs. allow
for interior
3. Flat wall wall & Paint overnight 40 to 50
Enamel ceilings Thinner before sq.m.
recoating
for exterrior
wood and 6 hrs. allow
4. Exterior properly Paint 48 hrs. 30 to 35
Gloss paint primed Thinner before sq.m.
metal recoating
surfaces
VARNISHING
KIND OF PAINT USES THINING DRYING TIMECOVERAGE/Gal
for floors,
sidings
1. Valspar or Paint 40 to 50
Spar Varnish furnitures,
24 hours
deck of Thinner sq.m.
boats
for interior
10 minutes.
2. Hi-solid new wood Allow 30
furnitures Lacquer 40 to 50
sanding and fixtures, Thinner minutes sq.m.
sealer before
cabinet, recoat
doors, etc.
for interior
3. Hi-solid new wood Allow 30
furnitures, Lacquer minutes 30 to 40
clear gloss door Thinner before sq.m.
Lacquer
panelling recoat
and trim.
for interior
4. Hi-solid new wood Allow 30
furnitures, Lacquer minutes 30 to 40
Semi-gloss
cabinets, Thinner before sq.m.
Lacquer
doors, recoat
shelves, etc
for
furnitures, Allow 30
6. Water
cabinets, Lacquer minutes 30 to 40
white gloss doors, panel Thinner before sq.m.
Lacquer
and interior recoat
walls
PAINTING WORKS
EXTERIOR PAINT
USE:
Skimcoat 20
Topcoat 13
Solvent 1
INTERIOR PAINT
USE:
Skimcoat 77
Topcoat 51
Solvent 4
USE:
Sealer Coat 80
Full Putty 80
Elastomeric Putty 64
Additive 14
Costing Exterior 2 coat
Material Unit Qty Unit Cost
Skimcoat gal 5.00 ₱380.00
Concrete Primer and Sealer gal 2.00 ₱750.00
Elastomeric Putty (Full Putty) ltrs 8.00 ₱147.00
Topcoat gal 8.00 ₱759.00
ltrs Solvent gal 2.00 ₱545.00
ltrs
ltrs
₱11,738.00
₱7,825.33 ₱19,563.33
₱0.00
₱2,347.60
₱21,910.93
₱19,563.33
₱438.22
₱391.27
₱234.76
Total Cost
₱7,600.00
₱6,000.00
₱4,557.00
₱19,734.00
₱1,090.00
₱38,981.00
₱25,987.33 ₱64,968.33
₱0.00
₱7,796.20
₱72,764.53
₱64,968.33
₱1,455.29
₱1,299.37
₱202.25
Total Cost
₱2,600.00
₱6,240.00
₱8,840.00
₱3,536.00 ₱8,840.00
₱0.00
₱1,485.12
₱13,861.12
₱12,376.00
₱277.22
₱247.52
₱176.80
BY: ENGR. RONALD JOHN R. CAJILLA
FORMS
DETERMINING THE TOTAL MATERIALS USED FOR SQUARES & RECTANGULAR COLUMN FORMS
ei
H
C
DETERMINING THE TOTAL MATERIALS USED FOR BEAMS & GIRDER FORMS
COLUMN BEAM
nter Column Height M 3.00 Enter Beam Length M 3.50
Enter # of Columns Units 10.00 Enter # of Beams Units 6.00
otal Column Height: 30.00 M. Ht. Total Beam Length: 21.00 M. Ht.
FLOORING
Enter Floor Area SQ.M. 80.00