CONSTRUCTION ESTIMATE CALCULATOR

(BY: )

CONCRETE

CONCRETE PROPORTIONS
CEMENT IN BAG
MIXTURE CLASS PROPORTION SAND GRAVEL
40 Kg 50 Kg
AA 1 : 1 1/2 : 3 12.00 9.50 0.50 1.00
A 0.04 9.00 7.00 0.50 1.00
B 1 : 2 1/2 : 5 7.50 6.00 0.50 1.00
C 0.04 6.00 5.00 0.50 1.00

FOOTING

FOOTING 1
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = L * W * t
Length,L(m) m CEMENT 0.00 Bags
Width,W(m) m SAND 0.00 cu.m
Thickness,t(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m
# of Footings

FOOTING 2
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = L * W * t
Length,L(m) m CEMENT 0.00 Bags

Width,W(m) m SAND 0.00 cu.m

CONCRETE WORKS
Thickness,t(m) m GRAVEL 0.00 cu.m

Volume,V 0.00 cu.m


# of Footings

COLUMN
*For Circular Columns, Enter the Cross-Sectional Area in Length and (1) at Width*

COLUMN 1
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = L * W * h
Length,L(m) m CEMENT 0.00 Bags
Width,W(m) m SAND 0.00 cu.m
Height,h(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m
# of Columns

COLUMN 2
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = L * W * h
Length,L(m) m CEMENT 0.00 Bags
Width,W(m) m SAND 0.00 cu.m
Height,h(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m
# of Columns

CONCRETE WORKS
BEAM

FLOOR BEAM
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = L * W * t
Length,L(m) m CEMENT 0.00 Bags
Width,W(m) m SAND 0.00 cu.m
Thickness,t(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m

ROOF BEAM
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = L * W * t
Length,L(m) m CEMENT 0.00 Bags
Width,W(m) m SAND 0.00 cu.m
Thickness,t(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m

Note: The dimension of the beam used was 150mm x 250mm

SLAB

SLAB 1
CONCRETE MIX PROPORTION: B
FORMULA:VOLUME = L * W * t

CONCRETE WORKS
Total Area m
Thickness,t(m) m CEMENT 0.00 Bags
Volume,V 0.00 cu.m SAND 0.00 cu.m
GRAVEL 0.00 cu.m

SLAB 2
CONCRETE MIX PROPORTION: B
FORMULA:VOLUME = Total Area * thickness
CEMENT 0.00 Bags
Total Area m SAND 0.00 cu.m
Thickness,t(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m

STAIRS

CONCRETE

STAIR 1
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = [(RH * TR/2) * SW](n) + [(RH^2 + TR^2)^0.5](SW)(ts)
Riser Height,RH(m) m CEMENT 0 Bags
Thread Run,TR(m) m SAND 0 cu.m
Stair Width,SW(m) m GRAVEL 0 cu.m
# of Steps, n(step/s) step/s
Stringer Thickness,ts(m) m
Volume, V 0.00 cu.m
Quantity

LANDING 1
CONCRETE MIX PROPORTION: A
FORMULA:VOLUME = A * t

CONCRETE WORKS
Area, A(m^2) m^2 CEMENT 0 Bags
Thickness,t(m) m SAND 0 cu.m
Volume, V 0 cu.m GRAVEL 0 cu.m
Quantity

CONCRETE WORKS
ESTIMATED VALUES
TYPE CEMENT(BAGS) SAND(CU.M) GRAVEL(CU.M)
FOOTING 0 0 0
COLUMN 0 0 0
BEAM 0 0 0
STAIRS 0 0 0
SLAB 0 0 0

MATERIAL PRICES
MATERIAL MARKET PRICE UNIT
Cement ₱ 243.000 ₱ / bag (40 kg)
Sand ₱ 400.000 ₱ / cu. Meter
Gravel ₱ 700.00 ₱ / cu. Meter

ESTIMATED PRICES PER TYPE


TYPE CEMENT(₱) SAND(₱) GRAVEL(₱)
FOOTING ₱ - ₱ - ₱ -
COLUMN ₱ - ₱ - ₱ -
BEAM ₱ - ₱ - ₱ -
SLAB ₱ - ₱ - ₱ -
STAIRS ₱ - ₱ - ₱ -
TOTAL COST PER MATERIAL ₱ - ₱ - ₱ -

TOTAL CONCRETE COST


CEMENT ₱ -
SAND ₱ -
GRAVEL ₱ -

GRAND TOTAL ₱ -

CONCRETE WORKS
Construction Estimate Calculator
(By: )

MASONRY

QUANTITY OF CEMENT AND SAND SAND FOR CHB MORTAR PER SQ. METER

SIZE OF NUMBER BAGS CEMENT MIXTURE


per sq. SAND
m A B C D
CHB (cm)
10x20x40 12.50 0.79 0.52 0.39 0.33 0.04
15x20x40 12.50 1.53 1.02 0.76 0.63 0.08
20x20x40 12.50 2.26 1.50 1.13 0.94 0.13

EXTERIOR WALLS
FIRST FLOOR

SIZE OF CHB (A,B,C) 15x20x40 CEMENT MULTIPLIER 1.53


CEMENT CLASS(A,B,C,D) A SAND MULTIPLIER 0.08

AREA (m^2) CHB (pcs.) CEMENT (bags) SAND (cu. M)

0.00 0.00 0.00

SECOND FLOOR

SIZE OF CHB (A,B,C) 15x20x40 CEMENT MULTIPLIER 1.53


CEMENT CLASS(A,B,C,D) A SAND MULTIPLIER 0.08

AREA (m^2) CHB (pcs.) CEMENT (bags) SAND (cu. M)

0.00 0.00 0.00

TOTAL (EXTERIOR)

CEMENT 0.00 BAGS

SAND 0.00 CU. M


CHB
0.00 PCS.
15x20x40

MASONRY WORKS
INTERIOR WALLS
FIRST FLOOR

SIZE OF CHB (A,B,C) 10x20x40 CEMENT MULTIPLIER 0.79


CEMENT CLASS(A,B,C,D) A SAND MULTIPLIER 0.04

AREA (m^2) CHB (pcs.) CEMENT (bags) SAND (cu. M)

0.00 0.00 0.00

SECOND FLOOR

SIZE OF CHB (A,B,C) 10x20x40 CEMENT MULTIPLIER 0.79


CEMENT CLASS(A,B,C,D) A SAND MULTIPLIER 0.04

AREA (m^2) CHB (pcs.) CEMENT (bags) SAND (cu. M)

0.00 0.00 0.00

TOTAL (INTERIOR)

CEMENT 0.00 BAGS

SAND 0.00 CU. M


CHB
0.00 PCS.
10x20x40

MASONRY WORKS
QUANTITY OF CEMENT AND SAND SAND FOR CHB PLASTER PER SQ. METER

THICKNESS OF BAGS CEMENT MIXTURE


SAND
PLASTER (mm) A B C D
8 mm 0.14 0.10 0.07 0.06 0.01
12 mm 0.22 0.14 0.11 0.09 0.01
16 mm 0.29 0.19 0.14 0.12 0.02
20 mm 0.36 0.24 0.18 0.15 0.02
25 mm 0.45 0.30 0.26 0.19 0.03

EXTERIOR WALLS

FIRST FLOOR

PLASTER THICKNESS 16 mm CEMENT MULTIPLIER 0.29


CEMENT CLASS(A,B,C,D) A SAND MULTIPLIER 0.02

AREA (m^2) CEMENT (bags) SAND (cu. M)

0.00 0.00

SECOND FLOOR

SIZE OF CHB (A,B,C) 16 mm CEMENT MULTIPLIER 0.29


CEMENT CLASS(A,B,C,D) A SAND MULTIPLIER 0.02

AREA (m^2) CEMENT (bags) SAND (cu. M)

0.00 0.00

TOTAL (EXTERIOR)

CEMENT 0.00 BAGS

SAND 0.00 CU. M

MASONRY WORKS
INTERIOR WALLS

FIRST FLOOR

PLASTER THICKNESS 16 mm CEMENT MULTIPLIER 0.19


CEMENT CLASS(A,B,C,D) B SAND MULTIPLIER 0.02

AREA (m^2) CEMENT (bags) SAND (cu. M)

0.00 0.00

SECOND FLOOR

SIZE OF CHB (A,B,C) 16 mm CEMENT MULTIPLIER 0.19


CEMENT CLASS(A,B,C,D) B SAND MULTIPLIER 0.02

AREA (m^2) CEMENT (bags) SAND (cu. M)

0.00 0.00

TOTAL (INTERIOR)

CEMENT 0.00 BAGS

SAND 0.00 CU. M

WALL FOOTING

MASONRY WORKS
WALL FOOTING 1
CMP: A
FORMULA:VOLUME = L * W * t
L(m) m CEMENT 0.00 Bags
W(m) m SAND 0.00 cu.m
t(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m

WALL FOOTING 2
CMP: A
FORMULA:VOLUME = L * W * t
L(m) m CEMENT 0.00 Bags
W(m) m SAND 0.00 cu.m
t(m) m GRAVEL 0.00 cu.m
Volume,V 0.00 cu.m

TOTAL

CEMENT 0.00 BAGS

SAND 0.00 CU. M

GRAVEL 0.00 CU. M

ESTIMATED VALUES

MASONRY WORKS
CEMENT 0.00 BAGS

SAND 0.00 CU. M

GRAVEL 0.00 CU. M


CONCRETE HOLLOW BLOCKS
0.00 PCS.
15x20x40
CONCRETE HOLLOW BLOCKS
0.00 PCS.
10x20x40

MATERIAL PRICES
MATERIAL MARKET PRICE UNIT
Cement ₱ 243.000 ₱ / bag (40 kg)
Sand ₱ 400.000 ₱ / cu. meter
Gravel ₱ 700.000 ₱ / cu. meter
CONCRETE HOLLOW BLOCKS ₱ 13.000 ₱ / piece
CONCRETE HOLLOW BLOCKS ₱ 11.000 ₱ / piece

TOTAL MASONRY COST

CEMENT ₱ -

SAND ₱ -

GRAVEL ₱ -

CONCRETE HOLLOW BLOCKS ₱ -

GRAND TOTAL ₱ -

MASONRY WORKS
CONSTRUCTION ESTIMATE CALCULATOR
BY:

METAL

A. CONCRETE HOLLOW BLOCKS


LENGTH OF REINFORCING BARS FOR CHB IN METERS
Vertical Reinforcement
Spacing Spacing Horizontal Reinforcement
Length of bars in meter
cm per block per sq. m. layer per block per sq. m.
40.00 0.24 2.93 2.00 0.26 3.30
60.00 0.17 2.13 3.00 0.17 2.15
80.00 0.13 1.60 4.00 0.14 1.72

FIRST FLOOR SECOND FLOOR


Area (m²) Vertical Horizontal Area (m²) Vertical Horizontal
0.00 0.00 0.00 0.00
TOTAL 0.00 m
NO OF REBARS(10mm bars) 0.00 pcs

NO 16 G.I. WIRE FOR CHB REINFORCEMENT PER SQ. M.


Vertical Horizontal Kilograms per sq.m.
Spacing Spacing 25 cm tie 30 cm tie 40 cm tie
40.00 2.00 0.05 0.07 0.09
40.00 3.00 0.04 0.05 0.06
40.00 4.00 0.02 0.03 0.04
60.00 2.00 0.04 0.04 0.06
60.00 3.00 0.03 0.03 0.04
60.00 4.00 0.02 0.02 0.03
80.00 2.00 0.03 0.03 0.04
80.00 3.00 0.02 0.02 0.03
80.00 4.00 0.02 0.02 0.02

TIE WIRE: 0.00 Kgs

B. MAJOR FOOTING
Length Net Length: -0.15 m

Concrete Cover 0.08 No. of cut bars: 0.00 pcs

No. of bars per length of Total no. of cut


0.00 pcs
footing bars:
No. of footings Cuts obtained: -40.00 pcs
Commercial length of
6.00 No. of bars (12mm): 0.00 pcs
rebars

METAL REINFORCEMENT
Commercial length of
6.00 No. of bars (12mm): 0.00 pcs
rebars
Total ties: 0.00 ties
Length of ties 0.30
Total length of ties: 0.00 meters

Tie wire (#16): 0.00 Kgs

C. COLUMN

MAIN BAR
Bend @ Base Footing Total length 0.00 m
Length from footing to groundflo No. of main
#DIV/0! pcs
Height of backfill bars
Thickness of floor slab
Height of ground line to beam Total no. of
main bars #DIV/0! pcs
Depth of tie beam (12mm)
No. of bars
Commercial length of rebars
No. of column

LATERAL TIES

Spacing Total length 0.00 m


No. of lateral ties Pcs. of lateral ties
#DIV/0! pcs
Length per C.L.
Use commercial length 6.00 No. of lateral ties #DIV/0! pcs

Spacing Total length 0.00 m


No. of lateral ties Pcs. of lateral ties
#DIV/0! pcs
Length per C.L.
Use commercial length 6.00 No. of lateral ties #DIV/0! pcs

Spacing Total length 0.00 m


No. of lateral ties Pcs. of lateral ties
#DIV/0! pcs
Length per C.L.
Use commercial length 6.00 No. of lateral ties #DIV/0! pcs

Spacing Pcs. of lateral ties


#DIV/0! pcs
Length per C.L.
Use commercial length Total no. of ties 0.00 pcs
No. of lateral ties No. of lateral ties #DIV/0! pcs

OVER ALL TOTAL OF TIES(10mm): #DIV/0! pcs

METAL REINFORCEMENT
TIE WIRE
Total ties: 0.00 ties
Length of ties
Total length of ties: 0.00 m

TOTAL NO. OF TIE WIRE (#16): 0.00 Kgs

D. SLAB
Length No. of bars
Width Horizontal: #DIV/0! pcs
Spacing Vertical: #DIV/0! pcs
Total length: #DIV/0! m
Total no. of bars (10mm): #DIV/0! pcs

TIE WIRE
Total ties: #DIV/0! ties
Length of ties Total length
#DIV/0! m
of ties:
TOTAL NO. OF TIE WIRE (#16): #DIV/0! Kgs

E. WALL FOOTING
Length of wall Total length of continuous bars: 0.00 m
Bar space Total length temperature bars: #DIV/0! m
No. of continuous bars Total no. of bars (10mm): #DIV/0! pcs

TIE WIRE
Total ties: #DIV/0! ties
Length of ties
Total length
#DIV/0! m
of ties:
TOTAL NO. OF TIE WIRE (#16): #DIV/0! Kgs

F. BEAM
Total length of main
Total length of beam 0.00 m
bars:
Stirrups' spacing Length of stirrups: 0.00 m
Total no. of
No. of main bar #DIV/0! m
stirrups:
Effective cover
Total no. of main
0.00 pcs
bars (16mm):

METAL REINFORCEMENT
Total no. of main
0.00 pcs
bars (16mm):
Hook

Depth
Total no. of stirrups
#DIV/0! pcs
(10mm):
Width

TIE WIRE
Total ties: #DIV/0! ties
Length of ties
Total length
#DIV/0! m
of ties:
TOTAL NO. OF TIE WIRE (#16): #DIV/0! Kgs

G. ROOF BEAM
Total length of main
Total length of beam 0.00 m
bars:
Stirrups' spacing Length of stirrups: 0.00 m
Total no. of
No. of main bar #DIV/0! m
stirrups:

Effective cover Total no. of main


0.00 pcs
bars (16mm):
Hook
Depth Total no. of stirrups
#DIV/0! pcs
Width (10mm):

TIE WIRE
Total ties: #DIV/0! ties
Length of ties Total length
#DIV/0! m
of ties:
TOTAL NO. OF TIE WIRE (#16): #DIV/0! Kgs

METAL REINFORCEMENT
SUMMARY
QUANTITY UNIT COST AMOUNT
TOTAL NO. OF 10 mm Ø bars,pcs. #DIV/0! ₱120.00 #DIV/0!
TOTAL NO. OF 12 mm Ø bars,pcs. #DIV/0! ₱173.00 #DIV/0!
TOTAL NO. OF 16 mm Ø bars,pcs. 12 ₱307.00 ₱3,684.00
# OF 16 TIE WIRE USED, kgs. #DIV/0! ₱60.00 #DIV/0!
#DIV/0!

METAL REINFORCEMENT