You are on page 1of 13

Diwancheruvu to Siddhantham section (from km 901+500 to 950+542) of NH-05 in state of Andhra Format No

Pradesh. QAM/QCF/09

Client : National Highways Authority of India


Independent Engineer : Aarvee Associates
Concessionaire : Diwantham Siddhantham Tollway Private Limited
EPC Contratcor : Ashoka Buildcon Ltd
SUMMARY SHEET OF SOIL TEST RESULT
Source of Soil Sample : Minor junction OGL Soil Location / Chainage: 957+330BHS Date of Sampling 28.03.2019
959+870 RHS
Gravel Sand Silt & Free Swell Atterbergs limits Proctor Test CBR
as per Content Clay as Index of IS : 2720 - Part 5 IS : 2720 - Part 8 IS : 2720
Sample
LOCATION SIDE IS : 2720 IS : 2720 Per Soil LL PL PI MDD OMC Part - 16 Remarks
NO
Part 4 Part 4 IS : 2720 IS : 2720 (%) (%) (%) (gm/cc) (%) Heavy
Part 4 Part 40 Comp
1 957+330 RHS 11.75 57.10 31.15 20.00 33.00 19.64 13.36 1.933 8.60 14.92
2 957+330 LHS 12.40 56.25 31.35 19.05 32.00 18.31 13.69 1.920 10.40 15.6
3 959+870 RHS 13.70 55.65 30.65 18.18 31.00 18.53 12.47 1.910 10.60 15.72

Remarks :
EPC Representative Concessionaire Representative IE/CLIENT Representative
Diwancheruvu to Siddhantham section (from km 901+500 to 950+542) of NH-05 in state of Andhra Format No
Pradesh. QAM/QCF/09

Client : National Highways Authority of India


Independent Engineer : Aarvee Associates
Concessionaire : Siddhantham Gunduglolanu Tollway Private Limited
EPC Contratcor : Ashoka Buildcon Ltd
SUMMARY SHEET OF SOIL TEST RESULT
960+580 - 961+480 BHS
967+800 - 968+200 BHS
Source of Soil Sample : Service Road OGL Soil Location / Chainage: Date of Sampling 28.03.2019
974+640 - 975+480 LHS
1000+560 - 1000+780 RHS
Gravel Sand Silt & Free Swell Atterbergs limits Proctor Test CBR
as per Content Clay as Index of IS : 2720 - Part 5 IS : 2720 - Part 8 IS : 2720
Sample
LOCATION SIDE IS : 2720 IS : 2720 Per Soil LL PL PI MDD OMC Part - 16 Remarks
NO
Part 4 Part 4 IS : 2720 IS : 2720 (%) (%) (%) (gm/cc) (%) Heavy
Part 4 Part 40 Comp
1 960+600 LHS 11.80 56.40 31.80 19.05 31.40 17.61 13.79 1.842 10.50
2 960+700 RHS 8.50 58.80 32.70 23.81 32.30 18.11 14.19 1.890 8.40
3 960+900 LHS 13.00 56.50 30.50 18.18 32.00 18.33 13.67 1.825 10.43
4 961+000 RHS 7.80 60.70 31.50 19.05 31.30 16.22 15.08 1.872 10.30
5 961+250 RHS 9.60 57.30 33.10 23.81 32.00 16.27 15.73 1.840 10.00
6 967+800 LHS 8.65 57.95 33.40 20.00 34.00 18.77 15.23 1.883 9.00
7 968+000 RHS 10.70 56.50 32.80 23.81 33.00 18.50 14.50 1.840 10.20
8 968+050 LHS 10.50 58.85 30.65 19.05 31.40 17.57 13.83 1.890 9.40
9 974+650 LHS 8.65 57.55 33.80 25.00 35.00 20.15 14.85 1.870 10.20
10 974+900 LHS 11.90 53.55 34.55 19.05 36.00 21.09 14.91 1.880 9.45
11 975+150 LHS 13.30 52.43 34.27 23.81 35.10 20.40 14.70 1.800 10.60
12 1000+650 LHS 14.25 53.30 32.45 20.00 33.00 19.64 13.36 1.892 8.60

Remarks :
EPC Representative Concessionaire Representative IE/CLIENT Representative
Diwancheruvu to Siddhantham section (from km 901+500 to 950+542) of NH-05 in state of Andhra Format No
Pradesh. QAM/QCF/09

Client : National Highways Authority of India


Independent Engineer : Aarvee Associates
Concessionaire : Diwantham Siddhantham Tollway Private Limited
EPC Contratcor : Ashoka Buildcon Ltd
SUMMARY SHEET OF SOIL TEST RESULT
KM 907+830 TO 910+100 LHS
Source of Soil Sample : Service Road OGL Soil Location / Chainage: Date of Sampling 28.03.2019
KM 911+400 TO 912+270 LHS
Gravel Sand Silt & Free Swell Atterbergs limits Proctor Test CBR
as per Content Clay as Index of IS : 2720 - Part 5 IS : 2720 - Part 8 IS : 2720
Sample
LOCATION SIDE IS : 2720 IS : 2720 Per Soil LL PL PI MDD OMC Part - 16 Remarks
NO
Part 4 Part 4 IS : 2720 IS : 2720 (%) (%) (%) (gm/cc) (%) Heavy
Part 4 Part 40 Comp
1 907+850 LHS 14.15 57.50 28.35 18.18 33.00 18.01 14.99 1.887 9.60 14.92
2 908+050 LHS 0.00 73.50 26.50 14.29 27.00 NP - 1.891 8.70 15.14
3 908+300 LHS 3.40 77.20 19.40 14.29 25.30 NP - 1.880 8.60 14.35
4 908+600 LHS 4.05 74.85 21.10 15.00 26.00 NP - 1.861 9.40 14.12
5 908+900 LHS 10.80 59.90 29.30 15.00 30.00 17.66 12.34 1.928 8.30 15.71
6 909+150 LHS 6.45 73.05 20.50 19.05 24.00 NP - 1.931 8.30 16.06
7 909+400 LHS 7.30 62.80 29.90 18.18 29.50 17.14 12.36 1.922 9.10 15.60
8 909+650 LHS 13.15 58.65 28.20 20.00 31.00 18.15 12.85 1.861 10.50 14.92
9 909+900 LHS 9.30 64.35 26.35 19.05 29.00 16.35 12.65 1.872 10.40 14.01
10 910+150 LHS 10.20 59.67 30.13 20.00 32.00 17.47 14.53 1.890 9.80 14.80
11 911+500 LHS 10.55 66.85 22.60 15.00 28.50 16.10 12.40 1.889 9.00 14.23
12 911+850 LHS 14.20 56.15 29.65 19.05 30.80 17.65 13.15 1.880 9.40 14.80
13 912+200 LHS 13.60 63.60 22.80 13.64 29.20 17.46 11.74 1.920 9.60 15.26

Remarks :

EPC Representative Concessionaire Representative IE/CLIENT Representative


Siddhantham to Gundugolanu section (from km 950+542 to 1022+494) of NH-05 in sta
Pradesh.

Client : National Highways Authority of India


Independent Engineer : Aarvee Associates
Concessionaire : Siddhantham Gunduglolanu Tollway Private Limited
EPC Contratcor : Ashoka Buildcon Ltd
SUMMARY SHEET OF SOIL TEST RESULT OF MINOR JUNCTIONS (CH: 950+542 T
Source of Soil Sample : Minor junction OGL soil
Free Swell Gravel Sand Silt & Atterbergs limits
Index of as per Content Clay as IS : 2720 - Part 5
Sample
LOCATION SIDE Soil IS : 2720 IS : 2720 Per LL PL PI
NO
IS : 2720 Part 4 Part 4 IS : 2720 (%) (%) (%)
Part 40 Part 4
1 951+350 LHS 19.05 13.65 54.65 31.70 31.50 18.62 12.88

2 953+485 RHS 20.00 9.75 58.15 32.10 32.50 19.12 13.38

3 954+250 RHS 20.00 9.10 59.05 31.85 33.00 19.44 13.56

4 954+250 LHS 23.81 10.80 58.30 30.90 31.50 18.13 13.37

5 957+330 RHS 20.00 10.35 57.60 32.05 33.40 20.81 12.59

6 957+330 LHS 19.50 5.35 64.75 29.90 34.50 20.59 13.91

7 959+045 RHS 19.05 11.70 55.60 32.70 31.00 18.39 12.61

8 959+800 RHS 15.00 7.30 62.95 29.75 30.50 18.37 12.13

9 959+870 LHS 20.00 13.80 54.60 31.60 32.50 19.87 12.63

10 962+460 RHS 19.05 10.20 59.15 30.65 32.10 18.52 13.58

11 968+140 RHS 20.00 8.73 58.87 32.40 32.50 19.19 13.31

12 968+140 LHS 18.18 11.51 56.89 31.60 31.60 18.42 13.18

13 968+510 RHS 23.81 10.43 56.12 33.45 33.10 19.21 13.89

14 968+510 LHS 20.00 9.85 59.30 30.85 32.80 19.08 13.72

15 969+880 RHS 20.00 8.95 60.80 30.25 34.00 19.77 14.23

16 971+560 RHS 19.05 10.90 55.80 33.30 33.00 20.36 12.64

17 972+330 RHS 23.81 10.65 59.08 30.27 33.50 20.36 13.14

18 972+480 RHS 18.18 11.25 59.38 29.37 31.70 17.46 14.24

19 972+480 LHS 19.05 7.86 60.68 31.46 32.60 20.48 12.12

20 974+620 RHS 22.73 10.27 60.16 29.57 32.50 19.20 13.30

21 974+620 LHS 19.05 16.84 51.80 31.36 30.80 17.84 12.96

22 975+460 RHS 15.00 11.30 56.02 32.68 34.00 19.97 14.03

23 975+460 LHS 20.00 7.83 61.76 30.41 33.00 19.00 14.00

24 975+870 LHS 15.00 13.20 55.97 30.83 31.00 17.45 13.55

25 975+930 RHS 19.05 11.50 56.10 32.40 32.10 18.40 13.70

26 976+820 LHS 14.29 13.55 55.50 30.95 32.20 17.56 14.64

27 980+360 RHS 20.00 9.63 57.52 32.85 33.10 19.51 13.59

28 983+730 RHS 18.18 10.85 56.05 33.10 32.00 18.51 13.49


29 987+620 RHS 19.05 9.86 57.44 32.70 33.40 20.26 13.14

30 993+810 RHS 23.81 10.86 59.00 30.14 31.00 17.39 13.61

31 994+070 RHS 18.18 8.70 57.87 33.43 34.00 19.20 14.80

32 994+070 LHS 15.00 10.75 57.88 31.37 32.00 18.30 13.70

33 998+940 RHS 19.05 12.10 57.25 30.65 34.00 20.03 13.97

34 998+940 LHS 20.00 8.70 59.30 32.00 32.50 19.72 12.78

35 1002+230 BHS 14.29 7.25 61.05 31.70 31.00 17.39 13.61

36 1003+290 LHS 25.00 10.25 58.95 30.80 33.80 19.35 14.45

37 1009+540 RHS 19.05 10.65 60.05 29.30 33.50 20.00 13.50

38 1010+780 RHS 18.18 7.35 61.85 30.80 32.00 19.24 12.76

39 1011+070 LHS 25.00 6.80 63.00 30.20 34.50 20.62 13.88

40 1011+730 RHS 18.18 9.85 60.20 29.95 30.50 18.25 12.25

41 1019+840 RHS 23.81 9.00 62.40 28.60 34.00 19.59 14.41

42 1020+005 LHS 20.00 7.25 60.65 32.10 31.00 19.26 11.74

Remarks :

EPC Representative Concessionaire Representative


m 950+542 to 1022+494) of NH-05 in state of Andhra Format No
adesh. QAM/QCF/09

MINOR JUNCTIONS (CH: 950+542 TO 1022+494 BHS)

Proctor Test CBR


IS : 2720 - Part 8 IS : 2720
MDD OMC Part - 16 Remarks
(gm/cc) (%) Heavy
Comp
1.937 9.40 16.05

1.892 9.55 15.26

1.887 9.20 14.92

1.900 8.80 15.37

1.884 10.60 15.60

1.868 10.65 14.58

1.880 10.00 14.80

1.877 10.20 14.80

1.910 8.80 15.03

1.892 10.80 14.23

1.873 10.71 16.28

1.914 10.35 16.74

1.856 10.75 14.46

1.874 10.80 15.37

1.856 11.00

1.874 10.70 15.94

1.856 11.20 14.12

1.913 8.60 16.97

1.892 10.45 14.80

1.860 11.35 14.69

1.870 10.30 14.58

1.914 8.60 16.17

1.876 10.40 15.94

1.894 8.60 16.85

1.877 10.52 15.37

1.912 8.70 16.74

1.894 10.90 16.85

1.911 8.70 16.97


1.876 10.25 15.48

1.872 10.85 15.26

1.954 9.00 16.40

1.956 8.60 16.85

1.883 8.45 16.05

1.915 8.50 15.94

1.872 10.85 15.26

1.860 10.50 15.26

1.855 8.50 15.49

1.890 8.70 15.71

1.845 10.50 14.23

1.874 9.30 15.14

1.870 10.30 16.51

1.910 9.40 15.94

IE/CLIENT Representative
Diwancheruvu to Siddhantham section (from km 901+500 to 950+542) of NH-05 in stat
Pradesh.

Client : National Highways Authority of India


Independent Engineer : Aarvee Associates
Concessionaire : Diwancheruvu Siddhnatham Tollway Private Limited
EPC Contratcor : Ashoka Buildcon Ltd
SUMMARY SHEET OF SOIL TEST RESULT OF MINOR JUNCTIONS (CH: 901+500 TO

Source of Soil Sample : Minor junction OGL soil

Free Swell Gravel Sand Silt & Atterbergs limits


Index of as per Content Clay as IS : 2720 - Part 5
Sample
LOCATION SIDE Soil IS : 2720 IS : 2720 Per LL PL PI
NO
IS : 2720 Part 4 Part 4 IS : 2720 (%) (%) (%)
Part 40 Part 4
1 904+410 RHS 20.00 8.65 61.55 29.80 33.00 19.08 13.92

2 906+345 RHS 19.05 9.80 58.40 31.80 31.50 18.72 12.78

5 914+790 LHS 20.00 5.65 63.85 30.50 34.00 20.28 13.72

6 915+420 RHS 23.81 10.30 60.00 29.70 32.50 20.95 11.55

9 920+515 LHS 19.05 7.20 61.20 31.60 30.50 19.22 11.28

10 921+500 LHS 18.18 9.15 58.65 32.20 34.50 20.70 13.80

11 922+150 LHS 19.05 10.50 60.20 29.30 32.00 20.34 11.66

12 924+040 LHS 20.00 6.85 61.80 31.35 34.00 20.31 13.69

13 926+440 LHS 20.00 5.65 63.95 30.40 31.50 18.74 12.76

14 927+090 LHS 18.18 9.60 60.45 29.95 33.50 19.45 14.05

15 927+950 LHS 22.73 8.35 60.00 31.65 30.50 18.77 11.73

18 929+610 LHS 20.00 10.40 60.70 28.90 34.00 19.92 14.08

20 930+330 LHS 19.05 7.95 60.00 32.05 31.00 18.64 12.36

21 931+370 LHS 19.05 12.05 56.45 31.50 32.00 19.44 12.56

22 931+900 RHS 18.18 10.30 60.15 29.55 34.50 20.50 14.00

23 931+900 LHS 22.73 9.65 59.45 30.90 31.00 17.76 13.24

24 932+740 LHS 20.00 6.80 63.35 29.85 33.50 20.25 13.25

26 933+165 BHS 19.05 10.75 57.75 31.50 29.50 17.69 11.81

27 934+945 RHS 20.00 5.70 62.50 31.80 34.00 19.75 14.25

29 940+260 RHS 20.00 11.25 59.45 29.30 30.50 18.08 12.42

34 943+970 LHS 19.05 7.60 61.35 31.05 34.00 20.45 13.55

35 943+970 RHS 19.05 5.55 64.30 30.15 32.50 20.30 12.20

36 945+150 LHS 23.81 10.50 57.45 32.05 33.00 18.84 14.16

37 945+150 RHS 20.00 7.90 62.00 30.10 29.50 18.03 11.47

38 947+560 LHS 18.18 9.85 60.60 29.55 34.50 20.24 14.26

39 947+560 RHS 19.05 11.75 56.65 31.60 30.00 17.82 12.18


40 948+315 LHS 20.00 6.20 62.60 31.20 33.50 20.49 13.01

Remarks :

EPC Representative Concessionaire Representative


om km 901+500 to 950+542) of NH-05 in state of Andhra Format No
Pradesh. QAM/QCF/09

ed

F MINOR JUNCTIONS (CH: 901+500 TO 950+542 BHS)

Proctor Test CBR


IS : 2720 - Part 8 IS : 2720
MDD OMC Part - 16 Remarks
(gm/cc) (%) Heavy
Comp
1.92 10.50 16.97

1.880 8.30 14.57

1.855 8.70 15.15

1.900 9.00 14.80

1.890 9.50 17.08

1.927 8.40 15.83

1.880 8.30 14.80

1.920 9.50 15.49

1.895 8.30 14.92

1.875 8.60 14.23

1.925 8.20 15.83

1.930 9.00 16.85

1.855 8.30 14.01

1.950 8.50 16.05

1.860 8.50 14.46

1.895 9.00 15.03

1.890 7.90 16.05

1.955 8.80 17.08

1.870 7.90 15.60

1.908 8.15 15.37

1.880 8.95 14.46

1.880 9.05 15.48

1.930 8.60 15.71

1.900 8.30 15.49

1.930 8.70 16.42

1.870 9.30 14.46


1.895 8.40 14.69

IE/CLIENT Representative

You might also like