Harkpur-Okhaldhunga Road Soil Tests

The document reports the results of Atterberg limits tests conducted on soil samples from an existing subgrade for the Harkpur-Okhaldhunga Road in Nepal as part of the Sub-Regional Transport Enhancement Project. Soil samples were taken from locations 17+500, 18+900, and 18+350 along the road and tested to determine their liquid limits, plastic limits, and plasticity indexes. The liquid limits for the three samples ranged from 17.7% to 17.9%, the plastic limits were all 0%, and the plasticity indexes were all 17.7% to 17.9%.

Uploaded by

sakar shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views14 pages

Harkpur-Okhaldhunga Road Soil Tests

The document reports the results of Atterberg limits tests conducted on soil samples from an existing subgrade for the Harkpur-Okhaldhunga Road in Nepal as part of the Sub-Regional Transport Enhancement Project. Soil samples were taken from locations 17+500, 18+900, and 18+350 along the road and tested to determine their liquid limits, plastic limits, and plasticity indexes. The liquid limits for the three samples ranged from 17.7% to 17.9%, the plastic limits were all 0%, and the plasticity indexes were all 17.7% to 17.9%.

Uploaded by

sakar shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Sub-Regional Transport Enhancement Project STEP

ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 17+500
Ref/Test No. : 434/14 Source: At Site
Date of Sampling : 24-Aug-13 Sampled by: Jointly
Date of Testing : 29-Sep-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. T-15 B-16 D-1 P-2
2 No. of blows 11 16 22 36
3 Wt. of Container + Wet Soil gms 21 23.7 20.7 20 0 0 C 0
4 STI
Wt. of Container + Dry Soil gms 19.1 21.4 18.9 18.4 0 A 0 0
PL
5 Wt. of Water gms 1.9 2.3 1.8 1.6 0 N 0 0
NO
6 Wt. of Empty Container gms 9.7 9.3 8.9 8.9 11 9.4 9.3
7 Wt. of Dry Soil gms 9.4 12.1 10 9.5 -11 -9.4 -9.3
8 Moisture Content % 20.21 19.01 18.00 16.84 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0 25
1 No. of 10
Blows 100

Result
Liquid Limit (%) 17.70 Plastic Limit (%) 0.00 Plasticity Index (%) 17.70

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Construction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contract Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 18+900
Ref/Test No. : 437/13 Source: At Site
Date of Sampling : 24-Aug-13 Sampled by: Jointly
Date of Testing : 21-Sep-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. N-30 B-5 B-14 B-9
2 No. of blows 13 19 29 40
3 Wt. of Container + Wet Soil gms 27.7 19.3 21.3 26.1 0 0 C 0
4 STI
Wt. of Container + Dry Soil gms 24.6 17.7 19.6 23.8 0 A 0 0
PL
5 Wt. of Water gms 3.1 1.6 1.7 2.3 0 N 0 0
NO
6 Wt. of Empty Container gms 8.9 9.2 9.8 9.6 11 9.4 9.3
7 Wt. of Dry Soil gms 15.7 8.5 9.8 14.2 -11 -9.4 -9.3
8 Moisture Content % 19.75 18.82 17.35 16.20 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0 25
1 No. of 10
Blows 100

Result
Liquid Limit (%) 17.90 Plastic Limit (%) 0.00 Plasticity Index (%) 17.90

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Construction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contract Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 18+350
Ref/Test No. : 436/12 Source: At Site
Date of Sampling : 24-Aug-13 Sampled by: Jointly
Date of Testing : 21-Sep-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. B-7 B-3 T-54 B-21
2 No. of blows 10 15 26 40
3 Wt. of Container + Wet Soil gms 21.4 20.6 19 18.8 0 0 C 0
4 STI
Wt. of Container + Dry Soil gms 19.4 18.7 17.4 17.4 0 A 0 0
PL
5 Wt. of Water gms 2 1.9 1.6 1.4 0 N 0 0
NO
6 Wt. of Empty Container gms 9.6 8.9 8.6 8.9 11 9.4 9.3
7 Wt. of Dry Soil gms 9.8 9.8 8.8 8.5 -11 -9.4 -9.3
8 Moisture Content % 20.41 19.39 18.18 16.47 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0 25
1 No. of 10
Blows 100

Result
Liquid Limit (%) 18.30 Plastic Limit (%) 0.00 Plasticity Index (%) 18.30

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Construction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contract Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 18+000
Ref/Test No. : 435/11 Source: At Site
Date of Sampling : 24-Aug-13 Sampled by: Jointly
Date of Testing : 15-Sep-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. T-36 P-2 T-54 D-1
2 No. of blows 12 19 29 40
3 Wt. of Container + Wet Soil gms 22.8 24.5 20.1 20.2 0 0 C 0
4 STI
Wt. of Container + Dry Soil gms 20.6 22.1 18.5 18.8 0 A 0 0
PL
5 Wt. of Water gms 2.2 2.4 1.6 1.4 0 N 0 0
NO
6 Wt. of Empty Container gms 9.6 8.9 8.6 8.9 11 9.4 9.3
7 Wt. of Dry Soil gms 11 13.2 9.9 9.9 -11 -9.4 -9.3
8 Moisture Content % 20.00 18.18 16.16 14.14 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0 25
1 No. of 10
Blows 100

Result
Liquid Limit (%) 17.00 Plastic Limit (%) 0.00 Plasticity Index (%) 17.00

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Construction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contract Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 16+800
Ref/Test No. : 433/10 Source: At Site
Date of Sampling : 24-Aug-13 Sampled by: Jointly
Date of Testing : 6-Sep-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. B-3 B-14 T-22 T-54
2 No. of blows 10 16 24 39
3 Wt. of Container + Wet Soil gms 18.1 17.8 16.6 19.6 0 0 C 0
4 STI
Wt. of Container + Dry Soil gms 16.9 16.7 15.5 18.2 0 A 0 0
PL
5 Wt. of Water gms 1.2 1.1 1.1 1.4 0 N 0 0
NO
6 Wt. of Empty Container gms 9.7 9.8 8.4 8.6 11 9.4 9.3
7 Wt. of Dry Soil gms 7.2 6.9 7.1 9.6 -11 -9.4 -9.3
8 Moisture Content % 16.67 15.94 15.49 14.58 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0 25
1 No. of 10
Blows 100

Result
Liquid Limit (%) 15.40 Plastic Limit (%) 0.00 Plasticity Index (%) 15.40

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Construction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contract Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 16+200
Ref/Test No. : 432/9 Source: At Site
Date of Sampling : 24-Aug-13 Sampled by: Jointly
Date of Testing : 1-Sep-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. D-1 B-16 N-30 H-50
2 No. of blows 10 18 26 40
3 Wt. of Container + Wet Soil gms 23.5 21.6 23.1 21 0 0 C 0
4 STI
Wt. of Container + Dry Soil gms 21.1 19.7 21 19.5 0 A 0 0
PL
5 Wt. of Water gms 2.4 1.9 2.1 1.5 0 N 0 0
NO
6 Wt. of Empty Container gms 8.9 9.3 9 10.1 11 9.4 9.3
7 Wt. of Dry Soil gms 12.2 10.4 12 9.4 -11 -9.4 -9.3
8 Moisture Content % 19.67 18.27 17.50 15.96 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0 25
1 No. of 10
Blows 100

Result
Liquid Limit (%) 17.50 Plastic Limit (%) 0.00 Plasticity Index (%) 17.50

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Construction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contract Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 15+500
Ref/Test No. : 431/8 Source: At Site
Date of Sampling : 24-Aug-13 Sampled by: Jointly
Date of Testing : 1-Sep-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. M-50 T-36 P-2 B-4
2 No. of blows 13 20 28 34
3 Wt. of Container + Wet Soil gms 22.7 19.5 20.7 19.7 0 0 C 0
4 STI
Wt. of Container + Dry Soil gms 20.3 17.9 18.9 18.2 0 A 0 0
PL
5 Wt. of Water gms 2.4 1.6 1.8 1.5 0 N 0 0
NO
6 Wt. of Empty Container gms 8.9 9.6 8.9 9.4 11 9.4 9.3
7 Wt. of Dry Soil gms 11.4 8.3 10 8.8 -11 -9.4 -9.3
8 Moisture Content % 21.05 19.28 18.00 17.05 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0 25
1 No. of 10
Blows 100

Result
Liquid Limit (%) 18.50 Plastic Limit (%) 0.00 Plasticity Index (%) 18.50

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Construction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contract Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 13+550
Ref/Test No. : 278/7 Source: At Site
Date of Sampling : 17-May-13 Sampled by: Contractor
Date of Testing : 4-Jun-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. 4 8 3 3
2 No. of blows 11 18 32 34
3 Wt. of Container + Wet Soil gms 61.6 82.4 50.1 49.8 0 0 0
IC
4 Wt. of Container + Dry Soil gms 60 80.9 49.6 49.3 0
AST 0 0
5 Wt. of Water gms 1.6 1.5 0.5 0.5 0 PL 0 0
ON
N11
6 Wt. of Empty Container gms 50 70.4 45.4 45.4 9.4 9.3
7 Wt. of Dry Soil gms 10 10.5 4.2 3.9 -11 -9.4 -9.3
8 Moisture Content % 16.00 14.29 11.90 12.82 0.00 0.00 0.00
9 Average Moisture Content 0.00
Liquid Limit %

35.0

30.0

25.0

20.0

15.0

10.0
25
1
No. of Blows 10 100

Result
Liquid Limit (%) 13.00 Plastic Limit (%) 0.00 Plasticity Index (%) 13.00

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Contruction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contact Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 12+200
Ref/Test No. : 277/6 Source: At Site
Date of Sampling : 17-May-13 Sampled by: Contractor
Date of Testing : 4-Jun-13
Date of Test : ###
S.No. Specimen no Liquid Limit Plastic Limit
1 Container No. 15 18 16 3
2 No. of blows 38 22 11 34
3 Wt. of Container + Wet Soil gms 56.1 80.2 72.6 49.8 0 0 0
4 Wt. of Container + Dry Soil gms 54.7 79.1 71.2 49.3 0 0 TY 0
ICI
5 Wt. of Water gms T0
AS
1.4 1.1 1.4 0.5 0 0
6 Wt. of Empty Container gms 42.1 72.5 65.2 45.4 11 PL 9.4 9.3
ON
N-11
7 Wt. of Dry Soil gms 12.6 6.6 6 3.9 -9.4 -9.3
8 Moisture Content % 11.11 16.67 23.33 12.82 0.00 0.00 0.00
9 Average Moisture Content 0.00
Liquid Limit %

35.0

30.0

25.0

20.0

15.0

10.0 25
1 No. of Blows 10 100

Result
Liquid Limit (%) 15.30 Plastic Limit (%) 0.00 Plasticity Index (%) 15.30

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Contruction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contact Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 11+120
Ref/Test No. : 262/5 Source: At Site
Date of Sampling : 8-May-13 Sampled by: Contractor
Date of Testing : 28-May-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. 26 28 29 3
2 No. of blows 37 24 11 34
3 Wt. of Container + Wet Soil gms 58.6 78.7 55.6 49.8 0 0 0
4 Wt. of Container + Dry Soil gms 56.9 77.2 53.6 49.3 0 0 ITY 0
I C
5 Wt. of Water gms 1.7 1.5 2 0.5 0
A ST 0 0
6 Wt. of Empty Container gms 44.8 68.2 44.2 45.4 11 PL 9.4 9.3
ON
N-11
7 Wt. of Dry Soil gms 12.1 9 9.4 3.9 -9.4 -9.3
8 Moisture Content % 14.05 16.67 21.28 12.82 0.00 0.00 0.00
9 Average Moisture Content 0.00
Liquid Limit %

35.0

30.0

25.0

20.0

15.0

10.0 25
1 No. of Blows 10 100

Result
Liquid Limit (%) 16.40 Plastic Limit (%) 0.00 Plasticity Index (%) 16.40

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Contruction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contact Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 10+450
Ref/Test No. : 261/4 Source: At Site
Date of Sampling : 8-May-13 Sampled by: Contractor
Date of Testing : 28-May-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. 4 8 3 3
2 No. of blows 12 18 30 34
3 Wt. of Container + Wet Soil gms 60.4 82.4 49.8 49.8 0 0 0
4 Wt. of Container + Dry Soil gms 58.4 80.5 49.3 49.3 0 0 ITY 0
I C
5 Wt. of Water gms 2 1.9 0.5 0.5 0
A ST 0 0
6 Wt. of Empty Container gms 50 70.4 45.4 45.4 11 PL 9.4 9.3
ON
N-11
7 Wt. of Dry Soil gms 8.4 10.1 3.9 3.9 -9.4 -9.3
8 Moisture Content % 23.81 18.81 12.82 12.82 0.00 0.00 0.00
9 Average Moisture Content 0.00
Liquid Limit %

35.0

30.0

25.0

20.0

15.0

10.0 25
1 No. of Blows 10 100

Result
Liquid Limit (%) 15.00 Plastic Limit (%) 0.00 Plasticity Index (%) 15.00

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Contruction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contact Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 10+140
Ref/Test No. : 260/3 Source: At Site
Date of Sampling : 8-May-13 Sampled by: Contractor
Date of Testing : 26-May-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. 20 5 2 3
2 No. of blows 11 19 32 34
3 Wt. of Container + Wet Soil gms 96.2 80.5 73.3 49.8 0 0 0
4 Wt. of Container + Dry Soil gms 95.5 79.5 72.4 49.3 0 0 TY 0
ICI
5 Wt. of Water gms T0
AS
0.7 1 0.9 0.5 0 0
6 Wt. of Empty Container gms 92 73.9 66.8 45.4 11 PL 9.4 9.3
ON
N-11
7 Wt. of Dry Soil gms 3.5 5.6 5.6 3.9 -9.4 -9.3
8 Moisture Content % 20.00 17.86 16.07 12.82 0.00 0.00 0.00
9 Average Moisture Content 0.00
Liquid Limit %

35.0

30.0

25.0

20.0

15.0

10.0 25
1 No. of Blows 10 100

Result
Liquid Limit (%) 17.00 Plastic Limit (%) 0.00 Plasticity Index (%) 17.00

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Contruction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contact Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 9+850
Ref/Test No. : 259/2 Source: Existing
Date of Sampling : 8-May-13 Sampled by: Jointly
Date of Testing : 13-May-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. B-19 B-21 B-2 K-1 B-22 k-2 B-14
2 No. of blows 11 19 30 46
3 Wt. of Container + Wet Soil gms 18 18.4 16.6 26 11.8 15.2 12.4
4 Wt. of Container + Dry Soil gms 16.2 16.5 15.5 24.2 11.4 14.8 12
5 Wt. of Water gms 1.8 1.9 1.1 1.8 0.4 0.4 0.4
6 Wt. of Empty Container gms 9.3 8.2 9.89 13.6 9.3 12.8 9.8
7 Wt. of Dry Soil gms 6.9 8.3 5.61 10.6 2.1 2 2.2
8 Moisture Content % 26.09 22.89 19.61 16.98 19.05 20.00 18.18
9 Average Moisture Content 21.4 19.08

35.0
Liquid Limit %

30.0

25.0

20.0

15.0

10.0
25
1 10
No. of Blows 100

Result
Liquid Limit (%) 21.00 Plastic Limit (%) 19.08 Plasticity Index (%) 1.92

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Contruction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contact Manager Aproved by
Resident Engineer………………………………………
Sub-Regional Transport Enhancement Project STEP
ATTERRBERG LIMITS TEST (Casagrande Method)

Road : Harkpur-Okhaldhunga Road Sample Description: Existing Sub Grade


Contract No : STEP/HO/02 Sample Location/Ch: 9+550
Ref/Test No. : 258/1 Source: At Site
Date of Sampling : 8-May-13 Sampled by: Jointly
Date of Testing : 13-May-13
Date of Test : ###

S.No. Specimen no Liquid Limit Plastic Limit


1 Container No. 3 7 5 7
2 No. of blows 12 21 36 41
3 Wt. of Container + Wet Soil gms 50.6 82.4 76.9 34.87 0 0 0
4 Wt. of Container + Dry Soil gms 49.9 81.6 76.7 31.65 0 0 TY 0
ICI
5 Wt. of Water gms 0.7 0.8 0.2 3.22 0 T0 0
AS
6 Wt. of Empty Container gms 45.4 74.8 73.9 13.94 11 PL 9.4 9.3
O N
7 Wt. of Dry Soil gms 4.5 6.8 2.8 17.71 N
-11 -9.4 -9.3
8 Moisture Content % 15.56 11.76 7.14 18.18 0.00 0.00 0.00
9 Average Moisture Content 0.00

25.0
Liquid Limit

20.0

15.0

10.0

5.0 25
No. of Blows
1 10 100

Result
Liquid Limit (%) 10.30 Plastic Limit (%) 0.00 Plasticity Index (%) 10.30

Comments

Contractor Consultant
Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
Tundi Contruction Pvt. Ltd.
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested By Checked by
Lab Technician Lab, Technician…………………………………………
Verified by
Material Engineer……………………………………….
Recommended by
Contact Manager Aproved by
Resident Engineer………………………………………