TOTAL
DRAINAGE (111M LONG), 2 NO OF SOAK AWAY PITS ALREADY CONSTRUCTED AT THE BACK OF
PROCESSING PLANT AND SUNDRY WORK
ALREADY CARRIED OUT.
QTY UNIT RATE AMOUNT
A. DRAINAGE
1. Excavation of foundation 106.6 mᵌ
2. Back fill of excavated material 34 m3
3. Plain in site concrete 26.64 m3
4. Block wall hollow filling 7.8 m3
5. Plastering of internal part 177.6 m3
6. Block wall 111 m2
C
i. Closure of two entrances and
Opening of one (1.8x2.1) 3nos ii.
sum
Construction of foot deep
iii. Repair of 6 metal doors and fix
them with keys
TOTAL N
REPAIR OF COLLAPSED FENCE (53.4M LONG FENCE WALL) AND EXTENSION OF CULVET BY 5.0M
TOTAL: N
PROPOSED DRAINAGE ALONG THE PROPOSED ROAD LEADING TO THE LOADING BAY (168M
LONG)
S/N QTY UNIT RACE AMOUNT
1 Excavation of foundation 201.6 Mᵌ
2 Back fill excavated materials 70 Mᵌ
3 Plain concrete blinding 168 x 1.2x0.2 40.32 mᵌ
4 Ditto for block wall hollow hilling 11.81 mᵌ
5 Block wall in drainage 168 m²
6 Plastering of internal parts 268.8 m²
TOTAL: N
BASEMENT FLOOR HOUSING THE COMPRESSOR
TOTAL: N
TOTAL: N
PROPOSED BILL OF ENGINEERING MEASUREMENT AND EVALUATION FOR
CONSTRUCTION OF ROAD AT CHICKEN PROCESSING FACTORY AT ALOMAJA VIA IBADAN
FOR OBASANJO HOLDINGS LIMITED
WIDTH
GRADING LENGTH 425M
12M
WIDTH
SURFACE DRESSING LENGTH 263M
10M
Name of Project
Unit rates Amount
Item no Description Quantity Unit
Naira Naira
Bill N02 site clearance and earth works
Rigid pavement
Provide and place concrete kerbs grade
2.05 25 at the sides of the road including 526 Lm
haunching and bed
Allow for paint on kerb surface as
2.06 526 Lm
specified and directed
Total bill
SUMMARY OF BILLS
Unit rates Amount
Item no Description Quantity Unit
Naira Naira
TOTAL
GRAND TOTAL
SUMMARY
A. ADDITIONAL JOBS
1 LOADING BAY N
2 DRAINAGE, SOAK AWAY PITS AND OT N
3 CULVERT EXTENSION N
4 DRAINAGE ALONG THE LOADING BAY N
5 PAVEMENT FLOOR HOUSING THE CO N
6 DRAW COVER ROUND THE PROCESSIN N
N
B. OUTSTANDING JOB
1 ROAD GRADING AND SURFACING N
GRAND TOTAL N