NO URAIAN PEKERJAAN SPESIFIKASI VOLUME

I. PEKERJAAN PENDAHULUAN

A. PEKERJAAN PEMBONGKARAN
1. Pembongkaran dinding 15.48 m2
2. Pembongkaran rangka dan plafond tripleks 97.50 m2
3. Pengupasan cat dinding 153.71 m2

II. PEKERJAAN ARSITEKTUR

A. ARSITEKTUR LANTAI 1 (ELEV ± 0,00)


A.1. PEKERJAAN BETON BERTULANG
1. Dinding beton lift 15 cm
a. Bekisting dinding (plywood) 2.85 m2
b. UPAH PASANG besi beton 180 kg/m3 64.80 kg
c. Beton Readymix K-350 0.36 m3
2. RB - 150x150
a. Bekisting kolom praktis (plywood) 3.30 m2
b. Besi beton 180 kg/m3 44.55 kg
c. Beton Sitemix K-175 0.25 m3

A.2. PEKERJAAN DINDING


1. Plesteran dinding bata merah (1SP : 4PP) 160.25 m2
2. Dinding roster 2.94 m1
3. Dinding partisi 7.00 m2
4. Benangan sudut 35.00 m1

A.3. PEKERJAAN LAPISAN LANTAI & DINDING


1. Meja Granit BAR 3.47 m2
2. Dinding keramik dapur 2.40 m2

A.4. PEKERJAAN PLAFOND


1. Plafond gypsum + shadow line Ex. Knauff 97.50 m2

A.5. PEKERJAAN PENGECATAN


1. Pengecatan dinding interior Ex. MU 202 [Hasil Rata & Rapi] 153.71 m2
2. Pengecatan plafond interior Ex. Jotun Majestic 97.50 m2