RESPONSE TO OBSERVATION.

# Dwg No Observation Response by Skyline


1 02 Layout showing the coastal road alignment The red line on the drawing shows the
in relation to the proposed road network and boundary of the coastal road. The coastal
subsoil investigation report should be road is about 173m from the outer edge of
attached. the proposed LKKI road and 187m from
inner edge of the proposed LKKI road.
These details are shown on pages A01 &
A02 of the drawings

The subsoil report is attached as


appendix ???
2 05 Details of the proposed cross culverts and The detail of the proposed culvert is
outfall drain locations / discharge point for attached as drawing No 15a.
the stormwater should be included and The outfall drain locations / discharge
specified. point is a flowing water body / stream as
shown on drawing No 5.
3 11 Cross Section of the road not properly Corrected and shown on drawing No 11.
captioned for identification
4 12, 14 Road “A” cross section should have Corrected and shown on drawing No 12 &
drainages (1mx1m) on both sides to collect 13
run-off from the carriageway on the road
network.
5 12 4 numbers of 150mm PVC pipes embedded Corrected and shown on drawing No 12 &
in 1:2:4 concrete mix should be provided as 13
Transverse and longitudinal service ducts
6 12 Composite material grating cover should be Corrected and shown on drawing No 12 &
provided as manhole cover 13
7 12 Streetlight pole height should be minimum Corrected and shown on drawing No 12 &
of 12m with LED light fittings 13
8 12 Strength of interlocking paving should be a Corrected and shown on drawing No 12 &
min of 45Mpa 13
9 12 Sharp sand filling material should be used as Corrected and shown on drawing No 12 &
against Lateritic filling material proposed 13
due to high water table and subsisting soil
strata
10 14 200mm drain wall thickness should be used Corrected and shown on drawing No 13
as against 175mm of drain wall proposed
11 15 Double reinforcement should be used as Corrected and shown on drawing No 15 &
against single reinforcement proposed for 15A
drain side walls
12 Provision of laybys, lane marking, and kerb Laybys layout shown on Drawing No 14.
painting should be provided Kerb painting and lane marking have
adequate funds allocated in the Bill of
Quantity for their implementation.