You are on page 1of 5

****** Result for Image/Page 1 ******

NATIONAL WATER SUPPLY & DRAINAGE BOARD


POLGAHAWELA, POTHUHERA AND ALAWWA
INTERGRATED WATER SUPPLY PROJECT
Tel.
Mobil
037 2243930 2243931
070 3665177 / 077 2442075
Fax.. 037 2243931
E-mail.: pdppaiwsp@gmail.com
My No:PD/PPAlWSP/Design/2021/200
The Project Director
M/s Vatech Wabag Ltd
Dear Sir,
Polgahawela. Pothuhera and Alawwa Integrated Water Supplv Proiect
Contract No: SP-NWP/POLGAHAWELA/W/DB/2011/01
Subiect:
Reference:
Submission of Road & Storm Water Drain Drawing for W TP area
1. WAB/SL/10P4/SG/PD/2018/1186 dntcd on 08th August 2018
2. PD/PPAIWSP/Design/2018/526 dated on 23rd August 2018
3. PD/PPAIWSP/Dcsign/2018/566 dated on 30th August2018
4. WAB/SL/10P4/SG/PD/2019/2353 dated on 30th May 2019
5. PD/PPAIWSP/Design/2019/278 dated on 21st June 2019
6. WAB/SL/10P4/SG/PD/2020/3495 dated on 17th January 2020
7. PD/PPAIWSPmcsign/2020/043 dated on 11th February 2020
8. WAB/SL/10P4/SG/PD/2020/3732 dated on 27th February 2020
9. dated on 14th March 2020
10. WAB/SL/101'4/SG/PD/2020/4286 dated on 30th July 2020
11. PD/PPAIWSP/Design/2020/177 dated on 17th August 2020
12. WAB/SL/10P4/SG/PD/2020/4999 dated on 21st December 2020
13. PD/PPAIWSP/Design/2021/010 dated on 13th January 2021
14. PD/PPAIWSP/General/C/2021/1255 dated on 09th August 2021
15. WAB/SL/10P4/SG/PD/2021/6053 dated on 28th August 2021
14/09/2020
- R5 (GFC)
Project Director
Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project
No 301, Kurunegala Road, Bandawa, Polgahawela.

****** Result for Image/Page 2 ******


This refers to the above subject and reference no. 15. Please note follow the
Contract Agreement clauses
for all drawing and submissions. Accordingly, all drawings / submissions should be
signed and stamped
as per the clause 8. I .6.6 in volume I of the contract agreement.
The submitted compliance statement and drawings were reviewed and comments are
given below. The
comments should be incorporated before GFC approval and resubmit.
Sl no. Client Comments
9
14
15
Rain water should not come through
the road surface and through the
perforated slab. Further catch pit
should be provided both end of the
culvert to the design. Therefore,
Culvert design and details should be
provided according to the surface
water runoff.
Noted. But reference and
specifications should be provided as
per road authorities standard.
However, it should be followed road
authority's standard for the road
designs and constructions as per the
Contract document.
The submitted road longitudinal
section only up to N. Therefore,
balance part of the road design should
be submitted for approval. Further
road gradient should be even surfaced
with maintaining vertical curve and
horizontal cure for required locations
comply to the road authority
WABACJ reply
Culvert details is provided
with catch pit and Hume pipe
arrangement.
Road cross section is revised
as per RDA standard.
Reference is also mentioned
in the drawing.
All the parts of the
longitudinal section are
provided. (A-P) LS section
drying bed road side and (A-
N) LS section is provided.
Administration building-
Chemical building clear
water reservoir side. Vertical
curve and horizontal curves
are provided in the allowable
limits.
NWSDB reply
Noted. However, culvert
invert level should be
matched with existing
culvert invert level.
Therefore, perforated
pipes should be
provided sufficiently for
the seepage water
Noted. Please submit the
RDA standard you have
referred for our review
and approval.
Noted. Please submit the
RDA standard you have
referred for our review
and approval.
Project Director
Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project
No 301, Kurunegala Road, Bandawa, Polgahawela.

****** Result for Image/Page 3 ******


16
17
18
19
20
standards according to the Contract
document.
Road shoulder should be as per road
authorities' specifications.
Road cross sections should be
provided every 5m intervals.
Main Gate design should be as per the
architectural
recommendation.
Further slash door type gate should be
checked with the entrance of the W TP
access road. Therefore, road should
not be blocked by the gate when it
open.
Weep hole seepage should not come
through the road surface. Therefore,
should be provided suitable drain path
for weep holes seepages. Further,
earth drain the top of the retaining it
should be concreted and the drain
section design calculations should be
provided according to the rain water
runoff of the catchment. Therefore,
most suitable structure is concreted
retaining wall with space availability
and existing rock layer.
The given road center line 6m radius
for the entrance of the access road
should be checked whether
it
Noted and updated the
specification in the drawing.
Noted and will be provided
separately.
Noted and will be provided
separately.
Perforated pipes are
connected to the catch pit
pass through the seepage
water to culvert.
Screed concrete outside
provided and drawing is
updated. Water runoff and
catchment calculation is
already submitted for your
approval.
Suitable protection method
will be submitted separately
for the slop area.
Road curve area is increased
and in front of security hut
area is also finished with
asphalt for easy turning Of
Ion vehicles.
Noted. Please submit the
RDA standard you have
referred for our review
and approval.
Noted. Please submit for
approval.
Noted. Please submit for
approval.
Noted.
Earth drain should be
reinforced concrete
drain.
The submitted
calculations should be
signed as per the clause
8. I .6.6 in the Contract
agreement.
Noted. However it
should be sufficient for
the movement of 20 m
long vehicle of road
Project Director
Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project
No 301, Kurunegala Road, Bandawa, Polgahawela.

****** Result for Image/Page 4 ******


21
22
23
24
sufficient or not for the movement of
20 m long vehicle.
Access should be provided for the
Polgahawela Area Engineer's quarters
in the W TP land.
Retaining wall design calculation
should be submitted for approval.
Access should be provided for
Operators rest room.
All Access road and road ways
should be provided as per the
Contract document.
All other balance road designs and
details should be provided including
inside of the W TP and main entrance
access road and fence from the
Pannaliya road.
But 20m long vehicles are not
available for the water
treatment plant transportation
o eration in Sri Lanka
Possibility of the access will
be checked and submit to
you separately.
Retaining wall calculation
already submitted for your
approval.
Noted and Access is
provided in the drawing.
Noted and will be submitted
to you separately.
transport as per the
Contract agreement.
Noted. Please submit for
approval separately.
Noted. But it should be
signed as per the
Contract agreement
clauses.
Noted.
Noted. Please submit for
approval separately at
the eraliest.
• Please note that the design and built contractor is responsible for the
conformity of the design with
functional requirements meeting ER, specification & Standard.
Thanki g You.
Eng. .M hilakarathne
Project Director (PPAIWSP)
Project Director
Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project
No 301 , Kurunegala Road, Bandawa, Polgahawela.