This document is a letter from the Project Director of the Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project to Vatech Wabag Ltd regarding the submission of road and storm water drainage drawings for the water treatment plant area. It provides comments on the drawings submitted by Vatech Wabag Ltd and requests revisions and resubmissions to address issues such as culvert design, road cross sections, retaining wall designs, and ensuring designs meet contract agreement and authority standards. The Project Director notes that the design and built contractor is responsible for conforming designs to meet functional, specification and standard requirements.
This document is a letter from the Project Director of the Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project to Vatech Wabag Ltd regarding the submission of road and storm water drainage drawings for the water treatment plant area. It provides comments on the drawings submitted by Vatech Wabag Ltd and requests revisions and resubmissions to address issues such as culvert design, road cross sections, retaining wall designs, and ensuring designs meet contract agreement and authority standards. The Project Director notes that the design and built contractor is responsible for conforming designs to meet functional, specification and standard requirements.
This document is a letter from the Project Director of the Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project to Vatech Wabag Ltd regarding the submission of road and storm water drainage drawings for the water treatment plant area. It provides comments on the drawings submitted by Vatech Wabag Ltd and requests revisions and resubmissions to address issues such as culvert design, road cross sections, retaining wall designs, and ensuring designs meet contract agreement and authority standards. The Project Director notes that the design and built contractor is responsible for conforming designs to meet functional, specification and standard requirements.
POLGAHAWELA, POTHUHERA AND ALAWWA INTERGRATED WATER SUPPLY PROJECT Tel. Mobil 037 2243930 2243931 070 3665177 / 077 2442075 Fax.. 037 2243931 E-mail.: pdppaiwsp@gmail.com My No:PD/PPAlWSP/Design/2021/200 The Project Director M/s Vatech Wabag Ltd Dear Sir, Polgahawela. Pothuhera and Alawwa Integrated Water Supplv Proiect Contract No: SP-NWP/POLGAHAWELA/W/DB/2011/01 Subiect: Reference: Submission of Road & Storm Water Drain Drawing for W TP area 1. WAB/SL/10P4/SG/PD/2018/1186 dntcd on 08th August 2018 2. PD/PPAIWSP/Design/2018/526 dated on 23rd August 2018 3. PD/PPAIWSP/Dcsign/2018/566 dated on 30th August2018 4. WAB/SL/10P4/SG/PD/2019/2353 dated on 30th May 2019 5. PD/PPAIWSP/Design/2019/278 dated on 21st June 2019 6. WAB/SL/10P4/SG/PD/2020/3495 dated on 17th January 2020 7. PD/PPAIWSPmcsign/2020/043 dated on 11th February 2020 8. WAB/SL/10P4/SG/PD/2020/3732 dated on 27th February 2020 9. dated on 14th March 2020 10. WAB/SL/101'4/SG/PD/2020/4286 dated on 30th July 2020 11. PD/PPAIWSP/Design/2020/177 dated on 17th August 2020 12. WAB/SL/10P4/SG/PD/2020/4999 dated on 21st December 2020 13. PD/PPAIWSP/Design/2021/010 dated on 13th January 2021 14. PD/PPAIWSP/General/C/2021/1255 dated on 09th August 2021 15. WAB/SL/10P4/SG/PD/2021/6053 dated on 28th August 2021 14/09/2020 - R5 (GFC) Project Director Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project No 301, Kurunegala Road, Bandawa, Polgahawela.
****** Result for Image/Page 2 ******
This refers to the above subject and reference no. 15. Please note follow the Contract Agreement clauses for all drawing and submissions. Accordingly, all drawings / submissions should be signed and stamped as per the clause 8. I .6.6 in volume I of the contract agreement. The submitted compliance statement and drawings were reviewed and comments are given below. The comments should be incorporated before GFC approval and resubmit. Sl no. Client Comments 9 14 15 Rain water should not come through the road surface and through the perforated slab. Further catch pit should be provided both end of the culvert to the design. Therefore, Culvert design and details should be provided according to the surface water runoff. Noted. But reference and specifications should be provided as per road authorities standard. However, it should be followed road authority's standard for the road designs and constructions as per the Contract document. The submitted road longitudinal section only up to N. Therefore, balance part of the road design should be submitted for approval. Further road gradient should be even surfaced with maintaining vertical curve and horizontal cure for required locations comply to the road authority WABACJ reply Culvert details is provided with catch pit and Hume pipe arrangement. Road cross section is revised as per RDA standard. Reference is also mentioned in the drawing. All the parts of the longitudinal section are provided. (A-P) LS section drying bed road side and (A- N) LS section is provided. Administration building- Chemical building clear water reservoir side. Vertical curve and horizontal curves are provided in the allowable limits. NWSDB reply Noted. However, culvert invert level should be matched with existing culvert invert level. Therefore, perforated pipes should be provided sufficiently for the seepage water Noted. Please submit the RDA standard you have referred for our review and approval. Noted. Please submit the RDA standard you have referred for our review and approval. Project Director Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project No 301, Kurunegala Road, Bandawa, Polgahawela.
****** Result for Image/Page 3 ******
16 17 18 19 20 standards according to the Contract document. Road shoulder should be as per road authorities' specifications. Road cross sections should be provided every 5m intervals. Main Gate design should be as per the architectural recommendation. Further slash door type gate should be checked with the entrance of the W TP access road. Therefore, road should not be blocked by the gate when it open. Weep hole seepage should not come through the road surface. Therefore, should be provided suitable drain path for weep holes seepages. Further, earth drain the top of the retaining it should be concreted and the drain section design calculations should be provided according to the rain water runoff of the catchment. Therefore, most suitable structure is concreted retaining wall with space availability and existing rock layer. The given road center line 6m radius for the entrance of the access road should be checked whether it Noted and updated the specification in the drawing. Noted and will be provided separately. Noted and will be provided separately. Perforated pipes are connected to the catch pit pass through the seepage water to culvert. Screed concrete outside provided and drawing is updated. Water runoff and catchment calculation is already submitted for your approval. Suitable protection method will be submitted separately for the slop area. Road curve area is increased and in front of security hut area is also finished with asphalt for easy turning Of Ion vehicles. Noted. Please submit the RDA standard you have referred for our review and approval. Noted. Please submit for approval. Noted. Please submit for approval. Noted. Earth drain should be reinforced concrete drain. The submitted calculations should be signed as per the clause 8. I .6.6 in the Contract agreement. Noted. However it should be sufficient for the movement of 20 m long vehicle of road Project Director Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project No 301, Kurunegala Road, Bandawa, Polgahawela.
****** Result for Image/Page 4 ******
21 22 23 24 sufficient or not for the movement of 20 m long vehicle. Access should be provided for the Polgahawela Area Engineer's quarters in the W TP land. Retaining wall design calculation should be submitted for approval. Access should be provided for Operators rest room. All Access road and road ways should be provided as per the Contract document. All other balance road designs and details should be provided including inside of the W TP and main entrance access road and fence from the Pannaliya road. But 20m long vehicles are not available for the water treatment plant transportation o eration in Sri Lanka Possibility of the access will be checked and submit to you separately. Retaining wall calculation already submitted for your approval. Noted and Access is provided in the drawing. Noted and will be submitted to you separately. transport as per the Contract agreement. Noted. Please submit for approval separately. Noted. But it should be signed as per the Contract agreement clauses. Noted. Noted. Please submit for approval separately at the eraliest. • Please note that the design and built contractor is responsible for the conformity of the design with functional requirements meeting ER, specification & Standard. Thanki g You. Eng. .M hilakarathne Project Director (PPAIWSP) Project Director Polgahawela, Pothuhera and Alawwa Integrated Water Supply Project No 301 , Kurunegala Road, Bandawa, Polgahawela.