You are on page 1of 4

Request No.

: N8503280V
Date: 20 MAR 2021

Dear Sir/ Mdm

APPLICATION FOR SEWERAGE INFORMATION PLANS (SIP) ON LOT MK18-15119V , MK18-15239V , MK18-15288P ,
MK18-15141T , MK18-15305N , MK18-15117M , MK18-15116C , MK18-15221L , MK18-15246K , MK18-11858A , MK18-
15247N , MK18-15105V ....... (refer to Receipt No.: N8503280V)

This Sewerage Information Plan (SIP) is issued to K P KOH AND PARTNERS PTE LTD
1 The alignment and invert levels of the existing/proposed sewers are indicated in the SIP attached. The exact alignment and
invert levels of the sewers must be verified on site before commencement of any building/piling/excavation/other
construction works.
2 In order to prevent pollution of the water catchment, QP/Owner is advisedto work with the appointed PEs to bring forward
the extension of sewerage infrastructure to serve the temporary sanitary facilities on the site.

This is a computer-generated document. No signature is required.


BUILDING PLAN UNIT

40 Scotts Road #22-00 Environment Building Singapore 228231.


Building Plan Unit website: http://www.pub.gov.sg
Annex
General requirements to be complied with at DC & BP stage, where applicable:
DC and BP submission

1 The QP is required to obtain PUB’s DC clearance for the development priorto commencement of construction work on
site. QP shall also obtain PUB’s DCclearance prior to the submission of detailed plans on drainage and/or sewerage
works to PUB-Singapore National Water Agency for clearance/registration.
2 DC clearance from PUB is not required for the following developments:
a) A&A to landed housing developments which do not involve sewerage/sanitary or drainage works and there is no public
sewer or drainage reserve/drain which is receiving runoff from the neighbouring lots. For such cases, DP clearance is also
not required from PUB. QP/Developer is advised to make a simplified submission to PUB.
Sewerage
3 QP shall take note of the guidelines below and is advised to make pre-consultation with PUB (Building Plan Unit)
concerning the proposed sewers & sewer connections before submitting the DC plan to PUB-Singapore’s National Water
Agency for approval.
a) No building/structures shall be sited over or close to the public sewer. The building/structure setback from sewers,
link sewers & Deep Tunnels (DTSS) can be viewed in the PUB website at
https://www.pub.gov.sg/Documents/Protection%20of%20Public%20Sewerage%20System.pdf .
b) No works either permanent or temporary should be carried out within the public sewer corridor unless a written
approval has been obtained from PUB. QP shall refer to PUB’s website at
https://www.pub.gov.sg/Documents/WRN_AdvisoryNotes.pdffor more comprehensive information pertaining
to the prevention of damage to the sewerage system, the procedures for application and submission.
Prior to the commencement of works within the DTSS protection zone, you arerequired to submit the development
proposal to PUB-Singapore’s National Water Agency for their clearance.
c) QP shall apply for approval for works affecting public sewerage system (PUB-SEW-CLRDEV-OVER-SEW) if there
is any “specified activity1” to be carried out within the public sewer corrridor2 and pre construction CCTV survey
reports and video to be submitted to PUB.
i) The pre-construction CCTV survey report and video shall be submitted3 before carrying out any
temporary/piling/building works and shall show clearly the condition of all relevant existing sewers.
ii) The post-construction CCTV survey shall be submitted3 when the QP applies for sewerage clearance for
TOP/CSC (PUB-BPU-COMPOFWORK) upon completion of work.
iii) For small redevelopment/A&A works of single landed property (terrace, semi-detached and detached house),
the submission of pre-construction CCTV survey report is waived and only thepost-construction CCTV survey
report is required.

d) In general, a new development or redevelopment shall be connected via a sanitary drainline to a public
sewer/manhole located outside private lands.
e) For reconstruction of single landed premises or redevelopments, the reuse of the existing drainline, which is
connected to a sewer in adjacent private land, may be allowed only if:
i) it is not feasible to provide a new drainline to connect to a public sewer within the road reserve; and
ii) the existing drainline and its downstream sewers have adequate capacity.
iii) If the reuse of existing drainline is permitted by PUB, the QP shallcarry out CCTV inspection of the existing
connection to public sewer and submit a report to PUB to confirm that the connection to public sewer is ina
serviceable condition. If it is defective, the QP shall rectify the defects before reusing it. If the QP decides
instead to construct a new drainline for connection, he shall ensure that the abandoned existing
drainline/connection are properly sealed after the completion of the new drainline/connection. Before
abandoning any existing drainlines/sewers, the QP shall verify on site that there are no existing connections
from neighbouring premises to the drainlines/sewers to be abandoned.

40 Scotts Road #22-00 Environment Building Singapore 228231.


Building Plan Unit website: http://www.pub.gov.sg
f) Where the QP finds it necessary to make a new sewer connection to an existing sewer/manhole within a private
land, the QP shall obtain written permission from the owner of the private land. If this owner subsequently withdraws
his permission before the completion of the drainline/connection, the QP shall have to reuse the existing connection
or make connection to a public sewer within the road reserve. The QP shall also obtain clearance from CBPD before
commencing work on the new sewer connection. After the new sewer connection is completed and put into use, the
abandoned existing drainline/sewer connection within the site shall be properly sealed.
g) For single development on land parcels to be comprised in a strata title plan such as cluster housing or
condominium/apartment or commercial/industrial complex, the sanitary drainline connection for the development
shall be made to the nearest public sewer located within the road reserve. As far as possible, the development
shall make only one connection to the public sewer. PUB’s permission shall be sought if more than one sewer
connection point is required.
h) For new landed development involving single unit housing such as detached, semi-detached or terraced
house/shop/factory on lots or subdivided lots, every lot in the development shall connect separately and directly via
individual sanitary drainline to the public sewer within the road reserve. Proposed new sewers to serve more than
one lot (eg. terrace houses) shall be constructed within the road reserve.
i) For new developments located far from public sewer or re-development (not A&A works) of sites currently served by
STP, if connection (either by gravity sewer or pump sump with pumping mains) to public sewer is not feasible/viable,
a holding tank shall be provided to serve the development. The holding tank shall be properly maintained at all times
to prevent pollution and sewage/sullage water shall be tankered away regularly and disposed off at a water
reclamation plant approved by PUB Water Reclamation (Network) Department. Please also liaise with PUB.

SIP [20/03/2021]
Note:
1,2 Please refer to the SEWERAGE AND DRAINAGE (PROTECTION OF PUBLIC SEWERAGE SYSTEM) REGULATIONS
2017 for the definition of public sewer corridor and list of specified activities.
3 From 1 Oct 2017 onwards, CCTV report and video can be submitted online bya registered CCTV contractor. After the QP
make a relevant form application via Corenet, QP shall then provide the CCTV contractor a covering letter confirming that he has
reviewed and accepted the CCTV reports/videos andthe E-submission (ES/CR) for the Corenet submission. For example,
sewer pre-construction CCTV is to be submitted after submission ofPUB-SEW-CLRDEV-OVER-SEW and submission of
sewer post construction CCTV isto be submitted after submission of PUB-BPU-COMPOFWORK. The list of latest PUB
registered CCTV contractors is available in our website,
https://www.pub.gov.sg/Documents/List_of_PUB_Registered_CCTV_Contractors.pdf

40 Scotts Road #22-00 Environment Building Singapore 228231.


Building Plan Unit website: http://www.pub.gov.sg
MK18-15216NMK18-15214A e 1294461MK18-15084A
1294460
25 8

18

14
MK18-05570W

16
20
22
4 2
MK18-15221LMK18-15219C
30 12 10
28 MK18-15212P 120.383 27

24
26

6
8
117.533
MK18-15224WMK18-15222CMK18-15220XMK18-15217XMK18-15213T 117.569 29
85K

R 152
MK18-150

66.19
MK18-15225VMK18-15223M MK18-15218LMK18-15215K

5
32
MK18-15228AMK18-15226P 31 MK18-15334A MK18-05575K
34
MK18-15227T PLACE MK18-15086N
MIMOSA
) )

(
MK18-15229K 19 W MK18-15250N MK18-15087X
6 8

48.50
10C

(
MK18 -1

150

MK18-140
)

MK18-153
MK18-15244T MK18-14059V

MK
33 MK18-14061W

MK18-152
MK18-152
35

MK18-152
88L

MK18-152
MK18-150
7
MK18-14062V

MK18-152

18
MK18-152
MK18-152

10A
MK18-152

-
123.827

05
10
MK18-152
3

MK18-152
5 37 122.015

MK18-152
15 11 7 123.498 121.995

5
10B
9

1
MK18-15090X120.621

7
76
29
122.456

31
346281

19

60M
23 17

32
MK18-15236C e346282

13
R 150

N
120.045 118.127 39 1294456
(

49L
25

48X
273564

47N
346280

P
MK18-15235L 36.50

21
1313779
e

46K
117.598 1294457 195722 )

45A
1294469 e

77X
346284
e 1313781
123.685
)

43P
TBL118.174 e 1294459150

42V
225

41W
MK18-15234X 27 e 12
)

D
( 1294470
( 122.005
118.948 e

39V
.50
M

38W
66.60 18A 18
1294472
(
150

K18-
1294471

37M
1294473 e

5
1313778 8.00 )
33 116.507
e 117.298 121.518 122.094
05

MK18-05
1313782
225 572P

16

9
(
18A18A118.244 120.246

MK1
48.90 ) )
115.248 18A BDL120.078 MK18-15091L
18
)
TBL115.952
)
MK18-15094W
)

MK18-15289
14
))

61

8-
18A MK18-15092CMK18-05590T

57
53

55

0559
D 56.0
33. 0
50
MK18-15288P
MK18-15290V 59

15
MK18-15093M

150
MK18-15291P 119.378

1A
0
C
116.072
MK18-15292T

42
TBL117.174
123.085

3
1294474

15
T
121.518
M
e 1294475
K1

8-
1303921

D MK18-
M 8 -1 e 1303937 22

K1
K1 509 MK18-15745W 120.333
123.049
M 8 5V

M
63 20A 122.848
304K K1 -1 43
MK18-15 65e 1880130
41
50 MK18-15744M

MIMOSA
121.108
M MK18-15746Ve 1303942
K1 8-45
) 1880129 1303924
9

225 2
(
) 1837495

19.
15 6P MK18-15743C
e

0818
195700

05N
115.960
8- 09 22A 225 MK18-07194A

7
MK18-153 15 (

D
) 114.377 TBL121.377 2

(
7T 23.9

52 50
1303922
09

MIM
1
.0
K e
20A
1303941

5X

15
(
MK18-15306X 8A 45 123.057 MK18-15747P

22.00
5

(
225
22 15

20
M

0
47

20
)
D RIVE 8

6
51 (
MK18-17043A K1 1 .

49

OS A
67 117.004 1 16
L T
1303923
5 3 0 7 - 120.527
MK18-1 8- MK18-15100X 6 18 MK18-15763V 748
MK18-15308C 113.728
)
e 1303939
e

150 D
24

35.9
225
(
-15 24A
42
)
1 K

47.0
1880128
53 51 MK18-15099K M
69 BDL115.374
1880127 22 5 e 1880131
1 8
)

R OA
122.053
)
0 K

2
1880126225
(

0
5
M
1294476
188013226.15
e115.325 115.655 5 1L 120.636 26
(
49A A
1880133
22.93 e 1294477
113.361
M
157
)
K1 MK18-15103M

D
113.058 TBL114.075
1 8 - 26
8- MK

CE
M

7A
1303925

4
15 59 0P 119.544 e

4
)
1294487 70
K1 MK18-11846N 20 26
5
121.362 1303943

RA

45
1 7
)
MK18-15337X M
K1 8-61 5
e114.508
1294489
0

57
15 4W 26A - 1
18

-11
)
) ) TBL120.052
195849 MK18-11847X
112.778 MK18-15141T
MK

TE
273685
M
M 72 K 1 8 -1 10 115.892e 1T 28 28A

18
575
5 22

K
)
K1 MK18-15140P 5

1L A
(

115.885
8 1 V

8
R 28 1

3 4 OS

MK
M 8- - 06
113.954 15 ( 18 - 2 A

(
225
27.7
45
15 113.085
575

(
2 5.0 0 TBL113.648

3. 0
MK18-15322N K1 15 74 P MK

6 5
15 IM

45
63 10 8 -1

11
1
0
8-

8
13

N
30
)
67 ) 20 1
7
M )
K

-
15 M T

59
65
9A
273686
AM

18
K1 K 120.838
)
13 71 e 195850 5 3
56 50

76

14
)
8
57
1303926
78

MK
69
0

114.482
M 2
MK18-15137P 8T 8- MK18-15109K M
1
.0

1 118.737 e 1303946
8-

K -
)
K

1
18 151 MK18-15108A M
18 8
)

0A
112.014
18 1 30 1
K1

273525

-
TBL119.373
MK

20
)
80

18
TBL112.898
-1 10 -11 e 195688 ) 16
30A N

46
K1
M

MK18-15136V 51 84 4 X 2

MK
5
T 8 7 755 3
115.016
8L 113.152

-11
1294478 73 -11
e 1294479 75 11A MK 15

(
22 5
30A 120.008

19
))
18- -15
16
MK18-15135W 18 84 3

5
8

.6
118.575

18
9C MK18-10851M K 1
M MK -11 M MK
) )
TBL112.112 82 84 MK18-15756Le
)

MK
K1 MK18-15113N
)
18 8
)
MK18-15134M 50 5 32
)
120.025 32A
MK

24
M 8- 79 -11 X

26
225 8

R 7.1
)
15

0P
)
K1 18 85 118.661
(

(
15 5

MK18
4

225
M 22. 34
7

8.8
MK18-15133C M 1 - 1L 7 120.065

0
K
)
8

1T
1
LE
77

86

41
1

0
1303931 MK18-15757C
A
K1 -81
15 4X 18 1 8 3 2
)
118.725 e

41
-11 52 9
VA

11
112.718 2 5
8- MK 115.058
15 115
2 8
C (

11
1303948
85 5

-
14.
)

-1146
110.488
SA

18 112.678
MK18-15758M

18
L 3M e1303945
(

8-
1

MK 28
11 1303929
-
56 50

1294494 83 16 M 11
)

MK
0

K1
26
K1
273524
36 38
1
.0

8
85
1294495 )
C
IM

M e 195687

18
8- 26

10 150
)

M
4W
(
)30

MK
K1 89 87 MK MK18-15759W

2N
1
)
M
85

(
3.4
1

MK

225 6
M

-11

31.
K 1 8 -1 18 85 R

MK
MK18-15760C
)

18-
-11 5V 13

1
10
30
5

18

41
8- N MK
15 119 8

18-
38A119.779
7 5

1
32
1294482
)
1

-11

2A
15

MK
7 6
)
8

576
V P
1294483
1 8 - 1 15 118.795

R 150
1

(
11
6. 50
20
)

29.80

157
18
1294480 )
91

41
MK MK

18
00 ) 1303932
e 1294481 M - 5
) )
M e
36

1M
8
1303949
18 7T 17 K18-11

3K
38

-11
K1
34 32
) )
113.022 18 461K

62W
)
-11
93

MK

19 114.985
)
110.385 23
M

41
-11
85 9X
)
110.395
38

)
85
)
TBL111.346
95

8 MK18-10860K
18

4N
MK18-15121WMK18-15122V MK MK18-11859K A 32
41 )
10
BDL112.404 273523
-
-11

38 e 195686
MK

8
) 5X
18 25 113.199 21 MK18-10855T ) 1
)

MK
)
-11
41

)
MK
18

)
40

) 38
86 25 111.195
)
6

1
)
-11

0T TBL111.773 ) 8 -1
MK

)
L

) 40 )
MK MK18-10852W 150 0
)
14
)

MK
)
41

OAD
119.892
18

18
) ) 273687 R 0.2
34 MK18-11123M
MK

25 e 195851
7

118.158
-11
)
4
C

18
-

MK
C

42
1

)
K

MK
18

86 MK18-11122C
14

25
)

15
-11
AL

LILAC R
1 7
)
18
18
-

A 27 MK18-11432X
)
18

)
11

-11 MK18-11143P
W

) )

43
)

-11
273522
19 ) 116.961
(

46MK18-11420C
M

86
41

)
A

) )
e 195685

5M
) 115.341
2K
)
MK18-11863N 21 21 19
)
OS

43
2
9W

)
) MK18-11421M

17
111.604 17
)
109.065)MK18-11437V
(

31 29 29
)

6W
e2)1305263MK18-15418P
1305261
IM

) )
116.656
)
MK18-11422W 46 MK18-10849W 25 23 MK18-11438P
)
M
44

MK18-11142V
) ) 114.576

6.8 5
22
5
35 150
5
.0
R

SEWERAGE INFORMATION PLAN


SCALE LEGEND : R REHABILITATED SEWER EXISTING SLUDGE MAIN
THE INFORMATION GIVEN ON THIS SEWERAGE INFORMATION PLAN FORMS THE BEST INFORMATION AVAILABLE ON THE DATE PRINTED AND IS LIABLE TO CHANGE WITHOUT NOTICE EXISTING PUMPING MAIN
EXISTING SEWER ABANDONED SEWER
WHILST EVERY ENDEAVOR IS MADE TO ENSURE THAT THE INFORMATION PROVIDED IS CORRECT, THE PUB DISCLAIMS ANY LIABILITY FOR ANY DAMAGE OR LOSS THAT MAY BE (in A3 Size) SEWER TO BE ABANDONED DECOMMISSIONED PUMPING MAIN
ABANDONED SLUDGE PUMPING MAIN
UNSURVEYED SEWER PROPOSED DTSS TUNNEL
NO CONNECTION TO THIS PROPOSED PUMPING MAIN
! !

1:1,250
CAUSED TO ANY PERSON DIRECTLY OR INDIRECTLY AS A RESULT OF ANY ERROR OR OMISSION. UNCOMMISSIONED SEWER SEWER IS ALLOWED EXISTING DTSS TUNNEL
ABANDONED PUMPING MAIN 123456
Caution: DECOMMISSIONED SEWER
! !

EXISTING DRAINLINE IMMEDIATE DOWNSTREAM SEWER GIS ID


PROPOSED SEWER PROPOSED DRAINLINE 123456 MANHOLE GIS ID
PUMPING MAIN TO BE ABANDONED
The information given is indicative only. The Applicant is advised to verify the information at the site.

N8503280V Prepared By: INLIS


1 Date: 20/03/2021

You might also like