A
subject to inspection and approval by the building control
officer.
3. All site particulars, dimensions and levels of existing
structure to be checked on site with the drawings by the
contractor and any discrepancies reported to the engineer
prior to commencement of any work.
4. New foundation depths shown are provisional and are
subject to site investigation, tree survey and depth of existing
foundations. The formation level of the foundations is to be
the satisfaction of the building inspector, and the minimum
permissible ground pressure is to be 100kN/m2 under
foundations at formation level.
5. In made ground, foundations shall be taken down to the
natural formation. Minimum foundation depths are to be in
accordance with NHBC Technical Standards Part 4:
Foundations.
6. The information shown on the drawings relating to existing
structure is based upon assumptions. The contractor is to
CONSERVATOR check and confirm these assumptions before
commencement of works.
7. The Contractor shall be responsible for the and detailing of
the temporary works.
8. All concrete shall be grade C35 with a min. cement
content of 325Kg per cubic meter with a max. water cement
ratio of 0.55, Sulphate resisting Class 2. unless noted
otherwise. Dry pack to 1:2 Cement Sand Mix. Cover to
reinforcement shall be 50mm unless noted otherwise.
9. All steelwork to be grade S275 to BS5950 and shall receive
two coats of Hi-build zinc rich primer after fabrication and
1 2 3 4 prior to delivery on site unless noted otherwise.
10. All bolts to be grade 8.8. Minimum of 2M16 bolts in any
5 connection. All welds to be 6mm min. continuous fillet welds
unless noted otherwise.
11. All Timber shall be grade C24 unless noted otherwise. (See
6 architect's drawings and the specifications for fire protection
7 BED ROOM 01 and preservation treatment).
12. All proprietary fixings to be installed in accordance with
8 8 the manufacturer's recommendations.
9 13. All claddings, batten, structural timber to BS4072.
Construction timber to be treated against infestation by
LOUNGE 10 house longhorn beetle (Reg.7). Timber to be of strength C24
11 unless otherwise noted.
12
This drawing remains the property of the company and is subject
13 to intellectural property rights, including copyright and design rights
and shall not be reproduced, copied, loaned or submitted to any
other party, without written consent.
4879
Drawing Title FLOORS
Date Drawing No.
AUGUST 2022 RDK/2022/A/01/01
Revision: RDK/2022/A/01/01/R3
4630 Date: 02 FEBRUARY 2023
A
A
GROUND FLOOR PLAN (EXTG) FIRST FLOOR PLAN (EXTG)
SCALE 1:100 SCALE 1:100
Scale 1:50
1:50
1m 0 1m 2m
2m 0 2m 4m
2579
TREE
8601
653 629
TV
1300
B 990 990 Existing walls and doors B
shown dashed to be
2300 LOUNGE removed and high level
2039
support beams provided,
2419
sized as per engineer's
1000 structural calculations
1606
6677
CONSERVATORY 7000
2278
1363
OPEN KITCHEN 1200
1700
BATH 1027
1 628
ROOM
2 1191
1930
2440
3 Client JOSS GUBB
PROPOSED GROUND FLOOR PLAN 2700 2100 Job Title FLOOR EXTENSION
SCALE 1:50
Drawing Title PROPOSED GROUND FLOOR
FOUNDATIONS INTERNAL STUD WALLS Electrical Installations (Part P Regs.)
Trench fill foundations as shown minimum depth 1m and to Internall stud walls (reg.E2) timber frame with 12.5mm Where electrical installation is to be carried out, compliance is necessary Date Drawing No.
building control approval. Foundations to be level with or lower plasterboard linings on each side of frame; add 100mm within the Electricity at Work Regulations 1989. Electrical installations
should be enclosed and separated by appropriate distances to provide
AUGUST 2022 RDK/2022/A/01/02
than invert of adjacent sewer pipe, Lintels to be provided in walls absorbant layer of Rockwool Linings (minimum density
where drains pass through (no load to be transferred to drain) 10kg/m3) fixed to frame with a minimum distance between mechanical and thermal protection so that they incorporate measures that Revision: RDK/2022/A/01/02/R3
afford protection for persons against the risk of electric shock, burn or fire
linings of 75mm and absorbant layer of unfaced mineral
injuries. Electrical installations should be inspected and tested during, and Date: 02 FEBRUARY 2023
FLOOR CONSTRUCTION wool batts of quilt which may be wire reinforced, suspended at the end of installation, before they are taken into service to verify that
in the cavity. All joints well sealed. they are reasonably safe; that is to say that they comply with BS7671:2001.
Concrete blocks run around the edge with 3 layers of damp
stopping plastic sheeting over the blocks and 450mm up Utility room walls to have waterproof membrane to stop
the surrounding walls, add 90mm Celotex and 60mm condensation, added between the celotex and plaster board. Provide energy efficient lighting in all living areas and kitchen in
screed on top. accordance with Part L1 B. Ensure that new fittings to habitable rooms
NEW WALL TO EXISTING have fittings that accept only lamps with a luminous greater than 40 lamp
The wall between the proposed extension and the existing lumens per circuit-watt. Provide minimum 75% energy efficient lighting in all
house is to be upgraded by screwing 100mm tannolised locations.
wood beam studs to the wall @400mm centres and the
All light switches, plug sockets and electrical switches to be set between Scale 1:50
space between the battens filled with 90mm Celotex 1:50
New foundations to be a minimum of 600mm insulation, with 10mm air gap. Fix 12.5mm plasterboard
450mm and 1200mm above finished floor level and comply with Part M of
wide and 1000mm deep mass concrete trench the Building Regs. All internal downlights and recessed spotlights are to be
onto battens and finish with a skim coat of plaster. enclosed with minimum half hour fire resisting hoods, to comply with Part L 1m 0 1m 2m
fill footings unless noted otherwise. Formation of the Building Regs and the Domestic Building Services Compliance
level to be agreed on site with Building C O Guide. 1:100 Scale 1:100
2m 0 2m 4m
1000 4899
4379
1700
2271
BED ROOM 02
BED ROOM 01
BATH ROOM
2m 0 2m 4m
11
10
8
7
6
5
4
4
3
2
1
Client JOSS GUBB
Scale 1:50
1:50
1m 0 1m 2m
2m 0 2m 4m
100mm Cavity full fill insulation 103mm Brickwork outer leaf
FOUNDATION DETAIL
(NTS)
2100
new window (u-value 1.6W/M2K) new window (u-value 1.6W/M2K)
1m 0 1m 2m
2m 0 2m 4m
3085
1200
2564
6984
Extension to be finished
3708
3456
in brickwork to match
2125
2375
Polyester powder coated
aluminium bi-fold doors
2500 1800
2100 8203
6704
Scale 1:50
1:50
1m 0 1m 2m
2m 0 2m 4m
6792
Extension to be finished
3805 in brickwork to match
2472
2300
2702 2100
Scale 1:50
1:50
1m 0 1m 2m
2m 0 2m 4m