You are on page 1of 1

400KV SUBSTATION AT ENNORE SEZ

Clarification for ROAD & DRAINAGE LAYOUT OF 400KV SWITCHYARD

DWG/DOC NO.: TB-1-378-607-610 BHEL Ref. No.: CLAR/AA/DRAIN/04


Customer DWG/DOC NO.:nil DATE OF SUBMISSION OF REVISED DOCUMENTS
DWG/DOC NAME: ROAD & DRAINAGE LAYOUT OF 400KV SWITCHYARD 4/29/2021

SL. NO. CUSTOMER Comments BHEL Clarifications.

DESEIN COMMENTS

1 Refer our comments on drawing No.TB-1-378-607-610. Noted & drawing updated

* Road layout to be reviewed by TANGEDCO site before submitting to


2 TANGEDCO head office and DESEIN. Noted.

As per specification clause no. 17.03.00 part (b), only open drains are to
3 * Drains to be covered only.
be provided for storm water drainage of the outdoor surface areas

TANGEDCO SITE COMMENTS

1 No Gate shall be provided at North west cormer which may link to plant
1 Noted & provided
road/

The dia of pipe is arrived as per design requirement. Using 600mm dia is
Pipe culverts hume pipe shall be provided 600mm dia instead of 300 and not feasible as it will cause the top of road to be increase at the culvert
2
450mm dia. For future maintenance and easy clearing. locations. However, the same can de decided at site to provide the suitable
size as per site conditions.

Necessary precast RCC cover slab with lifting facilities shall be provided for
drains and cast in situ cover slab of required thickness shall also be As per specification clause no. 17.03.00 part (b), only open drains are to
3
provided as shown in the drawing to facilitate the movement of be provided for storm water drainage of the outdoor surface areas
hydra/machinery for future maintenance works.

To prevent vegetation, the ground shall be covered with 100mm thick PCC
4 Noted.
of fys ash instead of brick pavements.

Kerb stone shall be provided on both sides of road and C/s. details of road
This drawing is for layout only. Road C/s details are already approved,
5 shall be shown in the drawing along with sub-base, shoulder and kerb stone
dwg. No is TB-2-378-607-608.
etc.

concrete pavement/Road shall be extended adjacent to portico area of GIS


6 Noted. The same may be taken care at site as per the site conditions.
building

Page 1 of 1