Professional Documents
Culture Documents
Water Reservoir-2
SERVICES
SERVICES
Water Reservoir-3
5
+91.
+91.
5
D
ES
ROA
IC
WIDE
RV
Water Reservoir-1
MT.
SE
MT.
Endline
WIDE
ROA
D
7.5
D
MT.
ROA
WIDE
WIDE
ROA
MT.
D
7.5
+95.0
5
+97.
D
ROA
9
MT. 37.5
WIDE
WIDEM @
Endline
MT.
ROA
D
1:25
+94.
7.5
ROA
D
D
WIDE
9
ROA
+93.5
MT.
WIDE
7.5
7.5
D
ROA
MT.
MT.
+97.
WIDE
7.5
WIDE
5
1:50
@ ROA
MT.
M
D
9
125
MT.
WIDE
ROA
D
D
H
ROA
7.5
MT.
MT.
WIDE
WIDE
WIDE
MT.
ROA
D
ROA
ROA
6
D
D
1:50
ROA
+100
D
WIDE
@
M
WIDE
+97.5
MT.
125
9
MT.
+93.
+94.
7.5
SUNKEN COURT BELOW SUNKEN COURT BELOW
+97.5
os.)
D
0
SERVICES
(56N
ROA
)
7.5
Nos.
+97.5
PARK
D
MT.
ROA
ING
WIDE
8
(118
D
ING
WIDE
PARK
ROA
WIDE
ING
MT.
(58
ROA
WIDE
PARK
7.5
MT.
Nos.
MT.
D
D
ROA
MT.
7.5
)
WIDE
9
WIDE
5
+97.
ROA
1:40
1
5
+97.
@
MT.
M
D
120
9
1:15
5
@
+97.
+97.
M
12
15 +99.0
M
@
+99.0
5
1:12
+98.
+97.5
13 4
7.5
5
D
6
+98.
ROA
+98.65
MT.
MT.
11 +93.5
WIDE
WIDE
WIDE
1:32
7
@
2
ROA +98.
.5
MT.
ROA
M
+103
+103
80
.5
D
7.5
D
.5
6
+103
+103
MT.
+94.
5
WIDE
0
+99.0
ROA
9
DIVERTED ROUTE FOR EXISTING ROAD THROUGH SITE +98.5 +98.5
MT.
D
14
WIDE
7.5
D
+98.
ROA
+100
MT.
ROA
WIDE
WIDE
D
MT.
3
ROA
D
ROA
7.5
D
.5
+103
.5
+98.35 +98.35
WIDE
+100
7.5
12 +90
MT.
MT.
D
+103
WIDE
7.5
@
D
5
WIDE
M
ROA
33 M @ 1:20
33 M @ 1:20
33 M @ 1:20
33 M @ 1:20
+100
31
ROA
MT.
WIDE
D
9
MT.
+100
6
7.5
+94.
0
+100
+103
+100 ROAD
+100
+97
1:120
WIDE @
15 +100 7 MT.600
M
+93.
.5
5
5
.0
+103
+97.1
+103 PARK
ING
(250
Nos.
+97 )
5
+93.
+93.5
+95
GENERAL NOTES:
1. ALL DIMENSIONS AND LEVELS ARE IN MM UNLESS
OTHERWISE SPECIFIED.
2. ALL DIMENSIONS ARE TO BE CHECKED AND CO-RELATED
WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND
SERVICES DRAWINGS AND ANY AMBIGUITY, DISCREPANCY
OR OMISSION SHALL BE BROUGHT IN TO NOTICE OF
ARCHITECT.
3. DO NOT SCALE THE DRAWING, WRITTEN DIMENSION TO BE
FOLLOWED.
4. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE
RELEVANT SERVICES AND STRUCTURAL DRAWINGS.
PROJECT TITLE :
CONSTRUCTION OF ALL INDIA
INSTITUTE OF MEDICAL SCIENCES
(AIIMS), DEOGHAR
CB-1
CB-2
RELEASED FOR
CONSTRUCTION
02.07.2021
CLIENT:
AIIMS, DEOGHAR
(UNDER MOHFW)
CB-3
B-E
STRUCTURAL CONSULTANT :
BUL
IDN
IG-: DRAWN
IGTT
ILE-:
Water Reservoir-2
SERVICES
SERVICES
Water Reservoir-3
5
+91.
+91.
5
D
ES
ROA
IC
WIDE
RV
Water Reservoir-1
MT.
SE
MT.
Endline
WIDE
ROA
D
7.5
D
MT.
ROA
WIDE
WIDE
ROA
MT.
D
7.5
+95.0
5
+97.
D
ROA
9
MT. 37.5
WIDE
WIDEM @
Endline
MT.
ROA
D
1:25
+94.
7.5
ROA
D
D
WIDE
9
ROA
+93.5
MT.
WIDE
7.5
7.5
D
ROA
MT.
MT.
+97.
WIDE
7.5
WIDE
5
1:50
@ ROA
MT.
M
D
9
125
MT.
WIDE
ROA
RELEASED FOR
D
H
ROA
7.5
MT.
MT.
WIDE
WIDE
WIDE
MT.
ROA
D
ROA
ROA
6
D
D
1:50
ROA
+100
D
WIDE
@
M
WIDE
+97.5
MT.
125
9
MT.
+93.
+94.
7.5
SUNKEN COURT BELOW SUNKEN COURT BELOW
+97.5
os.)
D
0
SERVICES
(56N
ROA
)
7.5
Nos.
+97.5
PARK
D
MT.
ROA
ING
WIDE
8
(118
D
ING
WIDE
PARK
ROA
WIDE
ING
MT.
(58
ROA
WIDE
PARK
7.5
MT.
Nos.
MT.
D
D
ROA
MT.
7.5
)
WIDE
9
WIDE
5
+97.
ROA
1:40
1
5
+97.
@
MT.
M
D
120
9
1:15
5
@
+97.
+97.
M
12
15 +99.0
M
@
+99.0
5
1:12
+98.
+97.5
13 4
7.5
5
D
6
+98.
ROA
+98.65
MT.
MT.
11 +93.5
WIDE
WIDE
WIDE
1:32
7
@
2
ROA +98.
.5
MT.
ROA
M
+103
+103
80
.5
D
7.5
D
.5
6
+103
+103
MT.
+94.
5
WIDE
0
+99.0
ROA
CONSTRUCTION
9
DIVERTED ROUTE FOR EXISTING ROAD THROUGH SITE +98.5 +98.5
MT.
D
14
WIDE
7.5
D
+98.
ROA
+100
MT.
ROA
WIDE
WIDE
D
MT.
3
ROA
D
ROA
7.5
D
.5
+103
.5
+98.35 +98.35
WIDE
+100
7.5
12 +90
MT.
MT.
D
+103
WIDE
7.5
@
D
5
WIDE
M
ROA
33 M @ 1:20
33 M @ 1:20
33 M @ 1:20
33 M @ 1:20
+100
31
ROA
MT.
WIDE
D
9
MT.
+100
6
7.5
+94.
0
+100
+103
+100 ROAD
+100
+97
1:120
WIDE @
15 +100 7 MT.600
M
+93.
.5
5
5
.0
+103
+97.1
+103 PARK
ING
(250
02.07.2021
Nos.
+97 )
5
+93.
+93.5
+95
GENERAL NOTES:
1. ALL DIMENSIONS AND LEVELS ARE IN MM UNLESS
OTHERWISE SPECIFIED.
2. ALL DIMENSIONS ARE TO BE CHECKED AND CO-RELATED
WITH THE RELEVANT ARCHITECTURAL, STRUCTURAL AND
SERVICES DRAWINGS AND ANY AMBIGUITY, DISCREPANCY
OR OMISSION SHALL BE BROUGHT IN TO NOTICE OF
ARCHITECT.
3. DO NOT SCALE THE DRAWING, WRITTEN DIMENSION TO BE
FOLLOWED.
CB-C CB-B CB-A 4. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE
RELEVANT SERVICES AND STRUCTURAL DRAWINGS.
PROJECT TITLE :
CONSTRUCTION OF ALL INDIA
INSTITUTE OF MEDICAL SCIENCES
(AIIMS), DEOGHAR
CB-1
CB-2
CL. of Splice
B-E CB-3
CL. of Splice
CL. of Splice
B-D
NUMBER REVISION DESCRIPTION DATE
CB-3
CLIENT:
AIIMS, DEOGHAR
(UNDER MOHFW)
2. Connection detail
for these marked 1. Splice
members. connection detail
B-E
STRUCTURAL CONSULTANT :
B-D
3. Base Plate
Connection detail
PLUMBING & FIRE FIGHTING CONSULTANT :
BUL
IDN
IG-: DRAWN
IGTT
ILE-:
DATE-: DRAWN
IGNO-: REVS
IO
IN
22.06.2021 2019-002-AB-Z3-ST-04.1 R0
SCALE :-1:100,50 DRAWN BY :ARUN CHECKED BY :ANKUSH