CORRIGENDUM- I

Name of Work: Clo 1.1.1.T. Campus at Sonepat, Haryana. SH: C/o Admin/Academic
Block (G+3), Clo Type-III 16 'Nos. Quarters (G+3), C/o Director
Residence (G+l), guard room & elect sub- station under Phase-1.

NIT No 03/EE/KD/2023-24
01/SE-KarnaV2023-24

A Pre-Bid Meeting held in the office of Superintending Engineer-Kamal under


his chairmanship on 18.04.2023 at 11 :30am.
At the outset the Superintending Engineer-Kamal, CPWD welcomed the
participants and presented the particulars and important points of project under the subject
work tender. The queries raised by the prospective bidders were clarified.
This corrigendum is being issued hereunder on the basis of clarifications given
in the pre-bid meeting on the queries raised by the prospective bidders through e-mail/letters
and also due to the technical necessities noticed by the department.
This corrigendum consists of following Annexure :-
(a) Annexure A:- This annexure contains reply /clarifications given by the department to
the queries /observations of various prospective bidders.
(b) Annexure B:-This annexure contains corrigendum/amendments.

It may please be noted that the bidder shall quote the rates considering the
corrigendum/amendments made in Annexure B and replies in Annexure A as included in
the scope of work of NIT and nothing extra will be paid on account of these
changes/amendments/corrigendum.

This corrigendum contains total 12 pages.

The following provisions in the above said uploaded NIT may be modified as per details given
below:-

Page 1 of 12
t:-, - - - - - - - - - - - - - - -- -- - - - - - - - - - - - - - - - - - -
AnnexureA
Civil Portion
~·i----:::--.---_;_::=---.------~---- - - ----~~--------------1
S. NIT Clause Queries/Request raised Reply
No Referenc Reference/Su
e Pa!!e biect

1 40 Specifications Please confinn the specifications DO unit with UPVC frame has
of Windows of DOU to be provided in the been considered only in academic
uPVC windows. Also confinn if cum Admin Block. The relevant
the sliding windows are to be item No. of DSR -2021 is already
provided or casement. mentioned in NIT.
Further, the section size of the 3 Track glass UPVC windows
uPVC windows shall be with UPVC frame has been
considerably increased due to the considered in rest of the buildings.
DOU. Has the extra cost been Rate in the tender may be quoted
considered in the tender accordingly.
estimate?
2 56 Internal Roads Please provide the length of the The length of the all campus roads
Main Road and Other roads as may be worked out as per layout
we are unable to measure the plan while quoting the tender. The
same from the provided PDF Autocad Drawings will be
drawings. Alternatively, provided to the prospective
drawings in CAD fonnat may bidders through e-mail on demand
kindly be provided. OR may be collected from the
EE-Kamal office to work out the
details.
3 38 SOW (C)(v) Levelling of ~ampus is required. Work of boundary wall is not in
Levelling of such huge area, scope of work as per the NIT.
especially in an area which is Only Type-III quarters are located
heavily mined will be highly cost in mined area. Soil required for
intensive. Is the soil required for filling is included in scope of
filling included in the scope of work. Bidder may evaluate the
the contractor. If so, kindly quantity of soil required from auto
provide a tentative quantity of cad drawing. Also, the soil
soil required for filling. stabilization of the vertical cut
portion of the campus may be
done by providing RR wall or
sloping the edge of the vertical cut
as per direction of Engineer-In-
Charge. The tender shall be
quoted accordingly.

4 56 · Stonn Water, As per the layout plan drawing Length of the stonn water drain,
Sewer Line & appended with this NIT, stonn external water supply line &
Water Supply water drain approximately 700 Sewerage line pipe has been
m, external water supply line (DI mentioned merely for guidance

Page 2 of 12
pipe of required capacity) purpose. The length of the storm
approximately 1000 m and water drain shall be worked out
sewerage line (RCC pipe or by the bidder to drain off water of
required material of required entire campus. The diameter and
capacity & strength) length for RCC NP2/NP3 pipe of
approximately 1000 m is to be appropriate size and grade shall be
constructed. got designed by the bidder as per
Considering the plot area of layout plan.
48.31 acres, there is high Tender may be quoted
probability that the mentioned accordingly.
lengths of pipes shall increase
considerably in quantity. As
such, it is requested that a certain
maximum length of pipe may be
freezed at tender stage and any
further increase on site may be
treated as extra item.
5 8 Performance Performance Guarantee of 5% of Performance Guarantee has been
Guarantee the tendered amount may kindly considered @ 5% of tendered
be relaxed to 3% of the tendered value as per Work Manual -2022.
amount as has been followed in There is no change in rate of% of
many CPWD tenders. This shall Performance Guarantee.
increase the working capital and
cash flow of the contractor
making it easier to achieve the
completion within stipulated
period.
6 15 22.2 The contractor is asked to The contractor 1s allowed to
arrange separate storage and arrange separate storage and
working space away from site. working space within campus for
Since the site is 48.31 acres and execution of work.
enough working space is
available, contractor should be
allowed to set up site offices,
labour camps, batching plant,
etc. within the premises.
7 19 15 (i) The rates are being estimated by The bidder should inspect the site
us based on the soil investigation before quoting the rate. No extra
report attached in the tender payment/ recovery shall be made
document. In case of major on account of any changes in soil
changes in the geotechnical investigation parameters which
investigation carried out post influences foundation of the
tender, extra payment should be buildings.
considered for extra cost
incurred by the contractor.

Page 3 of 12
"'·~-r--.::---:----,-=--=-------,----------------r-------------~
8 36 Estimate The tender has been estimated on Cost index has not been
DPAR-2021 enhancing by considered in the ECPT, tender
6.33% for additional GST. may be quoted accordingly.
Please confirm if any cost index
has been considered in the
estimate
9 38 SOW (C)(i) Is the entire plot of 48.31 acres The campus is almost levelled.
to be levelled equal to Particular building is to be set as
surrounding NGL. If not, kindly per layout plan after levelling of
specify the area to be levelled that particular area. Earth cutting
along with the NGL. and filling in high level and
depressed portions of the campus
to be done respectively to
maintain existing NOL/desired
level in other than surrounding
area of the buildings.
10 38 SOW (C)(ii) Retaining wall of height 6m to There is no change in the
8m approx. length approx .. 100m condition. If height of the
has been considered. Please retaining wall varies from 6 to 8
confirm that additional height or metre, nothing extra shall be paid
length, if required on site, shall OR recovered. The length of the
be paid extra. retaining wall may vary -+ 20
metre. No extra payment shall be
made or recovered upto this
variation.
11 256 Contour Plan The contour plan attached in the The Autocad Drawings will be
NIT is not clear. A clear copy provided to the prospective
may kindly be provided. Also, it bidders through e-mail on demand
may be confirmed that any OR may be collected from the
changes in the actual site levels EE-Kamal office. No extra
than mentioned in the contour payment/recovery shall be made if
plan shall be adjusted as extra there is change in Contour Level
work. developed by the successful
bidder.
12 38 SOW (C)(x) Please confirm that the cost for No extra cost on account of
the additional floor provision future additional floor considered
required in Administrative cum in the ECPT. Hence tender may
Academic Block has been be quoted accordingly.
considered in the tender estimate.
13 146 (d) (ii) Please confirm if the additional Only two inspection vehicles to be
inspection vehicle required is provided.
extra from the two vehicles
required to be provided, i.e. if the
total number of vehicles to be
provided are 3?

· Page 4 of 12
=r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - .

14 General Please confirm the 0-0 level for Top surface of the surrounding
works to be executed finished road shall be considered
0-0 level for all the buildings.
15 Whether the soil is to be filled The campus is almost levelled.
only in phase-1 part building or Development of entire plot is to
on the entire plot. be done. The soil has to be filled
in the plinth as well as · in
depressed portion of the campus if
required as per direction of
Engineer-In-Charge.
16 Whether the filling is to be done The outside of the boundary wall
outside the boundary wall or in not property of the IIIT that is
within the boundary wall as there why filling is not required outside
is a gap of approx 40 meters of boundary wall but within
between edge of road and campus filling is required for
boundary wall. development of the campus.
17 In residential areas of the mining In this NIT, the retaining wall has
zone, a retaining wall of 6-8 been considered only for 1st
met~rs high is to be provided, Phase structure to provide
how to integrate with the balance stability to the structures in all
boundary wall, and whether it respect.
will be required for phase to
structure also.
18 Also please explain as it will be Bidder has to work out this while
filled up with soil, whether the quoting the bid. No extra payment
pile foundation will be required shall be made or recovered on this
or not. account.
19 Please specify the approx The locations/source of the good
location from where good earth earth and other materials to be
can be brought to site for filling. explored by the bidders before
as the lead cost to bring good quoting the bid.
earth will vary accordingly
20 Please confirm if the whole The entire road of the campus as
network of roads are in our scope mentioned in the layout plan is in
or only the connection of phase- I scope of the work. The minimum
work buildings is to be given. specification has been enshrined
Please provide a section and plan in NIT and the plan is same as
for the same. shown in layout plan.
21 Please provide details of Horticulture work is not in scope
horticulture work to be done. like of the wor~ as per NIT.
whether the whole pot is to be
grassed, Type and number of
trees to be planted, any specific
requirement of plants. etc.

Page 5 of 12
•,--,-----.--------,-------,---------:--~:-------:--;-r--;::;:;;----;-=---:::--=--=,~=-=~:::.:.::-:::-1
22 - EGL given in the soil report is There is no existing road within
denoting the road top level or the campus. The plinth level for
level given the contour map is Admin/Academic block shall be
considered. Depth of foundation 900mm above and for all other
will vary accordingly. buildings it shall be 600mm above
the crown of the . finished
surrounding road.
23 Please specify the base level 0-0 Top surface of the surrounding
from which building plinth level finished road shall be considered
is to be maintained. 0-0 level for all the buildings.
24 Conceptual Architectural The Auto cad Drawings will be
Drawings of all Building. The provided to the prospective
tender drawing are not workable bidders through e-mail on demand
OR may be collected from the
EE-Kamal office.
Electrical Portion
25 General The switchboard along with The switchboard along with
ACBs and connections should ACBs and connections wiil be
have been be type tested design type tested design at CPRI/ERDA
. at CPRI/ERDA / any NABL / any NABL accredited
accredited Independent Independent International Test
International Test House for all House for all the all the 12 type
the 12 type tests as per tests prescribed as per IEC61439
IEC61439 standards and to standards and to provide test
provide test certificate / reports certificate / reports against each
against each panel rating. Please panel rating. -._
accept test reports from ERDA
as same is leading & reputed test
lab in India.
26 General Switchboards shall have Rated Switchboards will be Rated
Impulse withstand voltage Impulse withstand voltage (Uimp)
(Uimp) of 12kV for LT Panels of 12kV for LT Panels having
having ACB feeders and 8 kV ACB feeders and 8 kV for MCCB
for MCCB feeders. The feeders in line with IEC61439
constraint of 12 kV for complete standards
switchboard is due to Rated
Impulse withstand voltage
(Uimp) of MCCBs. Please
accept as bth 8 & 12 kV are in
line with IEC61439 standards
27 General To enhance operator safety; Switch~oard shall have Internal
switchboard shall have Internal arc of 50 kA 0.3 sec as per as per
arc of 50 kA 0.5 sec as per as per IEC 61641.
IEC 61641.
28 Type Test Please accept Type test reports / Type test reports / certificates
Page6 of 12
c,~_,.-C_e_rt-ifi-1c-a-te-r-------.----ce-rt-:i-:::fi-ca-:-t-es-fr;;--om----:r:-::-ep=u~t=-ed:;--:-;te=s;--tG;:fr~om~~r:;:ep~u~t:;ed~tite~stt-h~o;;u~s~es~lliik[Qe;-1
houses like CPRl/ERDA/ASTA CPRI/ERDA/ASTA for
for compliance to IEC61439 compliance to IEC61439 will be
accepted in addition to designated
organizations given in NIT.
29 Air For Incomer ACBs, release
Circuit should offer additional
Breaker protections for Under & Over No Change
Voltage, Current & Voltage
unbalance, Maximum demand,
temperature rise monitoring &
protection etc. This will ensure
both Current & Voltage based
protections at Incomer level
ACBs
30 Moulded Double break contact system No change.
· Case refers to internal design &
Circuit construction of MCCBs which
Breaker has been deleted / removed from
CPWD substation works 2014.
Copy of amendment issued in
August 2016 is enclosed for your
reference. Please accept standard
design & construction of
approved makes
31 Motor Totally coordinated starter up to Totally coordinated starter up to
Control & 15KW as per IEC 60947-6-2, 15KW as per IEC 60947-6-2,
Protection starter module should have starter module will have breaking
breaking capacity of 50kA at capacity of 50kA at 415V AC as
415V AC as per IEC60947 per IEC60947
32 Constructi As per tender specifications, 450 As per NIT "The exact
onHPFC kVAR is passive and 150A is distribution of total capacity
Active compensation of Hybrid between the active and passive
Panels. Please clarify how to part shall depend on the rating of
achieve 1:1 ration between the the HPFC panel" stands good.
two.
33 Operation Response time: 1 msec. No change.
However, Actual correction time
is 20 to 40 msec - AHF senses
the current for 1 cycle and starts
correcting from the next cycle.
34 Operation Harmonics Compensation up to No change.
50th order can be given. Higher
order harmonics have magnitude
which is almost negligible & can

Page 7 of 12
be ignored.
. 35 Certificate Please accept Type test as per No change.
Indian Standard IS1893 for
Zone V in addition to IEC
standards
36 Air Siemens (3WA) / L & T (U No change.
Circuit Power Omega) I .Schneider
Breaker Electric (NW)/ ABB(E-MAX2)/
LEGRAND(DMX3) are the
equivalent make. These are latest
& equivalent series
37 Moulded Siemens (3VA) ( L &T(DSINE) / No change.
Case Schneider
Circuit Electric(NSX)/ABB(TMAX)/LE
Breaker GRAND(DPX3) are the
equivalent make. NSX is
equivalent to MCCB series
mentioned for other approved
makes
38 Digital L&T has been missed out in the No change. _
Panel make list. Kindly consider
Meter
39 HPFC Complete HPFC panels will be No change.
Panels assembled at OEM authorised
(Certified system house as per IEC64139 &
IEC IEC61921.
61439 and
61921
Panels)
(OEM
Manufact
ured)
40 Numerical L&T has been missed out in the No change.
Relays make list. Kindly consider
41 TVSS L&T has been missed out in the No change.
make list. Kindly consider
42 VFD L&T has been missed out in the No change.
make list. Kindly consider
43 C-7 - Pg Kindly clarify which The parameters in op to be
HVAC 498,499,504 temperatures to be followed for deleted.
System- machine selection.
Chilling
Unit-
44 C-7 - Page. 499 & ECBC+ doesn't define Full load ECBC+ nonns to be followed.
HVAC 505 Ikw/Tr. As per general industry The make of the chiller &
Pages of 12
"'·r - - ~ - - - - - . - - - - - - - r - - - - - - - - - - - - ' - - - - - ; - - - - - - - : - : : - - : - - - - - - - - - - - - ,
System- practice it is requested to accept compressor will be same.
Chilling full load Ikw/Tr at design
Unit- condition as 0.72 kw/Tr& COP
(at AHRI condition) as per
ECBC only.
45 C-7 - Page 505 Kindly confirm that starter of The starter of chiller is VFD
HVAC chiller is VFD. based.
System-
Chilling
Unit-
46 C-7 - Page 503 Kindly provide the IO summary The indicative IO summary is
HVAC to quote for same. given, the detailed IO summary
System- will be given by
Section 6- contractor/consultant, as the case
Chiller may be during design and
Plant execution period subsequent to
Manager award of work.
-
47 C-7 - Kindly confirm if there is The word "DELETED" to be
HVAC requirement of Hot water omitted and the Hot water
System- generator in the project or not. If generator as per following
Air yes, please provide the specification to be provided - 6
Source specifications of same. Nos. or as per design: -
Hqt Water 1. Supply, Installation, Testing
Generator and Commissioning of
-Chapter electrically operated modular type
10 Air Source Hot Water Generator
of following nominal capacity
having Controller and Themiostat
so that required qty. of hot water
is generated at required
temperature with nominal
variation, including necessary
electrical panel with automatic
Controls including inlet and outlet
connections and suitable for
outdoor installation.
2. Modular scroll type air source
water heating machine; modules
shall operate in master slave
I combination with automatic run
time equalization between the·
modules. 3.
Nominal Design conditions:
Outdoor DB/WB temperature 20

Page 9 of 12
Deg Cl 15 Deg C, initial water
tank temperature 15 Deg C &
Final Tank Temperature 55 Deg
C, Minimum COP 4.59. The
equipment shall be capable of
operation from -20 to 43 Deg C
DB ambient temperature. The
equipment shall be capable of
operation from -20 to 43 Deg C
DB ambient temperature. Suitable
Nos & suitable capacity squirrel
cage induction motor with class
'F' insulation suitable for
operation on 415 volts +10% , 50
Hz, A.C. supply. Suitable Nos. &
suitable capacity starter in IP 55
protection. First charge ofR410 A
refrigerant and oil duly charged at
factory. 1 No. - Matching Air
Cooled condenser with copper
tubes and
Aluminium fins. 1 No. - Matching
Water Side heat exchanger of Co
Axial Tube in Tube type only. 1
Lot - Refrigerant piping fittings,
valves, accessories to inter
connect compressor, condenser,
chiller and expansion valve. 1 Set
- Control panel with display
comprising of Controls. It shall
also be equipped with protection
and monitoring devices such as
H/L Pressure switch/ Thermal and
Current Overload Protector. 1 Lot
- DP/ Flow switches at inlet and
outlet water drain & air purge
valves, wherever required: Lot-
suction line and required
insulation. Lot-frame work for
mounting the above with base
plate complete with anti vibration
pads/ springs. Lot- Initial/ first
charge of refrigerant gas &
compressor oil duly charged at
factory. Lot- RCC/ cement

Page 10 of 12
concrete foundation for
equipment. Heating capacity : 40
KW Nominal. Flow Rate
860 Litre Per Hour.
Annexure-B

Clause
Sr. Page No. Reference/ Existing Modified
No.
Subject
1 Name of Clo I.I.LT. Campus at Sonepat, C/o IIIT Campus at Sonepat,
Work Haryana. SH: Clo Haryana. SH: C/o Admin cum
Admin/Academic Block (G+3), Academic Block (G+3), Type-
Clo Type-III 16 Nos. Quarters III 16 Nos. Quarters (G+3),
(G+3), Clo Director Residence Boys Hostel (G+4), Girls Hostel
( G+ 1), guard room & elect sub- (G+l), Director Residence
station under Phase- I (G+l), guard room & elect sub-
station including Development
of the entire campus under
Phase-1.
2 11 e The bidding capacity of the The bidding capacity of the
agency should be equal to or more agency should be equal to or
than the estimated cost of work more than the estimated cost of
put to tender. The bidding work put to tender. The bidding
capacity shall be worked out by capacity shall be worked out by
the following formula: Bidding the following formula: Bidding
Capacity= {[AxNx2]-B} Capacity= {[AxNx 1.5] -B}
3 17 · 7 Payment of performance Payment of performance
Guarantee: The bidder shall Guarantee: The bidder shall
submit irrevocable performance submit irrevocable performance
guarantee of 3% (Three percent) guarantee of 5% (Five percent)
of the tendered amount of the tendered amount
4 25 13 The contractor whose bid is The contractor whose bid is
accepted will be required to accepted will be required to
furnish performance guarantee of furnish performance guarantee of
3 (Three Percent) of the bid 5 (Five Percent) of the bid
amount within the period specified amount within the period
in Schedule F specified in Schedule F
5 60 viii The bidding capacity of the The bidding capacity of the
agency should be equal to or more agency should be equal to or
than the estimated cost of work more than the estimated cost of
put to tender. The bidding work put to tender. The bidding
capacity shall be worked out by capacity shall be worked out by
the following formula: Bidding the following formula: Bidding
Capacity= {[AxNx2] -B} Capacity= {[AxNxl.5]-B}
6 76 Maximum turnover in last seven Maximum turnover in last seven

Page 11 of 12

I
'·r-----.----.--------~--- - - - - - - -----.------=-----------,
years == Rs. . . . . . . . . . . . years == Rs ......... .. .
• Updated value of turnover (A) == Updated value of turnover (A) ==
Rs............ Rs ... ........ .
No. of years (N) == ............. . No. of years (N) == •..•..•..•.. .•
Bidding Capacity == {[AxNx2] - Bidding Capacity == {[AxNxl.5]
B} -B}
7 229 LIST OF Tata, Jindal (Hisar), Prakash, Tata, Jindal (Hisar), Prakash,
PREFERR Surya Surya, Apollo
ED
MAKES
OF
MATERIA
LS(Civil)
(Sr. No. 48)
8 231 LISTOF Jangid Engineering, AGFUV, Jangid Engineering, AGFUV,
PREFERR SenHarvic, Navair Delhi, Sukriti SenHarvic, Navair Delhi, Sukriti
ED Delhi, Chandni Industries Delhi, Chandni Industries,
MAKES Apollo
OF
MATERIA
LS(Civil)
(Sr. No. 98)
9 802 LIST OF Cisco/ Juniper/ Extreme/ Alcatel Cisco/Tadiran/
PREFERR Lucent/ Allied Telesis Arista/Polycom/foshiba/
ED Aeonix/ Alcatel Lucent.
MAKES
OF
MATERIA
LS(Electric
al)
(Sr. No. 10)
Rest of the terms & conditions of NIT shall remam the same.

!.lfafffifq :-
1. 3ftlrc!fflJT 3rr'a-rm,r c:b-lafle1, ~.FIT.Par.Pcr, c:t>-lafle1 cffl" ~<!f ~ ,
2 . ct> I 4q I C1 ct> rct.), Cfl"UscYr, ~.FIT. Par.Pcr, cffl"
c;;;~
3rr'a-rm,r c:t>-laf I C1 c:b-laf I C1
~<!f I J

c:t>li!l4IC1c:t> 3~ : ! : _ ~ ;C1

Page 12 of 12

You might also like