1) HYD Letter Ref. – N16297-HPE-KH-OL-0155 Dated 18.01.2021
2) ADC Letter Ref. – N16297-TECH-0104-21 Dated 26.01.2021
Dear Sir,
With reference to the above-mentioned subject, please find enclosed herewith the revised Mechanical GA
drawings for the project N-16297.
Thanking You,
For Hydropower Energy and General Construction SP LLC
Tanay Kumar
Project Manager
MECHANICAL GA DRAWINGS
Comment Sheet Ref: N - 1 6 29 7- T E CH - 0 10 4- 2 1 Date of Comment: 26.01.2021
12. Overhead crane reach to be marked in the plan view. Overhead crane reach is indicated in section A.
18. Fire water pipe support and battery could affect the
movement between diesel pump and suction header,
please check.
22. Fuel tank dike volume shall be minimum 120% of tank Noted and shall be complied. Please refer to Fire
volume. Tanker access up to fuel tank shall be Fighting System Drawings (Water Based) which is
ensured. Tank and dike arrangement to be updated in submitted separately for approval.
section D.
23. Clean agent system shall be as per UAE fire code/civil Complied as per project specification. Please refer to
defence requirements, accordingly, verify the CO2 Fire Fighting System CO2 Drawings which is
cylinder mentioned in the drawing. submitted separately for approval.
24. Is this crossover location appropriate due to overhead Yes, 2.26 m head room clearance available. please
fire water pipes? refer to section A
Note: The above comments and/or approvals do not relieve the Contractor from his obligation in the contract to ensure conformance to the specifications. Any
specification deviations found subsequent to approval are to be corrected by the Contract to the satisfaction of the OWNER/ENGINEER.
Signed: Signed:
For Arcadis Consulting Middle East Ltd for TRANSCO
PUMPING STATION PLANT
PLANT
NORTH NORTH
TRUE
TRUE NORTH
1 2 3 4 5 6 7 8 NORTH
KEYPLAN
A A
B
STAIR-1
C C
STAIR-4
D1
TRANSFORMER-1
PUMP ROOM B
F F
G TRANSFORMER-2
SHOP DRAWING
ELECTRIC
PUMP
G1
CABLE CELLAR
C
PUMP
DIESEL
H BATTERIES
H
J
MODEL#
284
0
0-000
341398
1500
1250
1750
455
2000
568
2500
S/N: 0000
682
3000
USGPM
LPM
3500
795
4000
909
4500
APPROVED
1023
5000
1136
STAIR-3
1 2 3 4
N16297-GE-P00-CN-D001
PUMPING STATION PLANT
PLANT
NORTH NORTH
TRUE
TRUE NORTH
NORTH
NOTE -6
TRANSFORMER-2
ELECTRIC
PUMP
CABLE CELLAR
C
DIESEL
PUMP
BATTERIES
MODEL#
284
0
341
0-000
398
1500
1250
1750
455
2000
568
2500
682
S/N: 0000
3000
USGPM
LPM
3500
795
4000
909
4500
1023
APPROVED
5000
1136
STAIR-3
SHOP DRAWING
D
STAIR-2
TRUE
TRUE NORTH
NORTH
KEYPLAN
STAIR-1
SHOP DRAWING
STAIR-4
TRANSFORMER-1
NEW PUMPING STATION AT
JABEL HAFFET BASE
B
EPC Contract No:- N-16297
Design & Consultancy
for natural and
built assets
Tel: +971 02 5664000
Fax: +971 02 6359109
P.O. Box: 2774
Abu Dhabi, U.A.E
www.arcadis.com
N16297-GE-P00-CN-D001
PUMPING STATION PLANT
NORTH
TRUE
NORTH
KEYPLAN
A B C D E F G H J K L M
LAYDOWN
AREA
PUMP ROOM
SHOP DRAWING
LPM
682 795
568 909
455 1023
398
341 1136
284 3500 4000
2000
1750 4500
1500 25003000 5000
0
1250
USGPM
MODEL#
0-000 APPROVED
S/N: 0000
N16297-GE-P00-CN-D002
PUMPING STATION PLANT
NORTH
TRUE
NORTH
1 2 3 4 5 6 7 8
KEYPLAN
KONECRANES 10t
SHOP DRAWING
N16297-GE-P00-CN-D003
PUMPING STATION PLANT
NORTH
TRUE
NORTH
8 7 6 5 4 3 2 1
KEYPLAN
10t KONECRANES
11 KV
SWITCHGEAR MCC ROOM CONTROL ROOM
SHOP DRAWING
ROOM
PUMP ROOM
NOTE -6
STAIR-3
N16297-GE-P00-CN-D004
PUMPING STATION PLANT
NORTH
TRUE
NORTH
KEYPLAN
TYPICAL DRAIN
DETAILS
SECTION F
1 2 3 4 4 3 2 1
SHOP DRAWING
PUMP ROOM
PUMP ROOM
STAIR-1
NEW PUMPING STATION AT
JABEL HAFFET BASE
EPC Contract No:- N-16297
Design & Consultancy
for natural and
built assets
Tel: +971 02 5664000
STAIR-2 Fax: +971 02 6359109
P.O. Box: 2774
STAIR-2 Abu Dhabi, U.A.E
www.arcadis.com
SECTION E SECTION D
N16297-GE-P00-CN-D005
PUMPING STATION PLANT
NORTH
TRUE
NORTH
VALVES LIST (INSIDE PUMPING STATION) : CARBON STEEL PIPE BILL OF MATERIALS (INSIDE PUMPING STATION):
KEYPLAN
N16297-GE-P00-CN-D006
PUMPING STATION PLANT
NORTH
TRUE
NORTH
KEYPLAN
PUMP NOZZLE DIMENSIONAL TOLERANCE ALLOWABLE NOZZLE FORCES AND MOMENTS LIST
up to 1600 mm ± 8 mm
AIR INLET
Over 1600 mm ± 13 mm
SHOP DRAWING
SIDE VIEW MECHANICAL SEAL SPECIFICATION
FRONT VIEW MAKER : JOHN CRANE TYPE : SINGLE CARTRIDGE
PUMP DETAIL & BASE PLATE FIXING ARRANGEMENT SEAL PLAN : 11 / 61
X Y Z
Discharge
Total C.O.G
PUMP 3903 950 950
Suction MOTOR 1340 850 1050
∅16 Hole ∅100
Motor
BASE 2725 950 278 CUSTOMER'S CONNECTIONS LIST Hydropower Energy and General Construction L.L.C
Z
X TOTAL 2519 910 785
Y
EARTH PLATE- 6t No. CONNECTION SIZE & RATING
Datum Point(Edge of Baseplate) DETAIL(304SS) LIFTING LUG DETAIL Tel:03-7621400, Fax:03-7630401
PUMP NOZZLE DIMENSIONAL TOLERANCE N-1 PUMP SUCTION 6", ASME 900LB RF P.O.Box:15253, Al Ain, U.A.E
- SUCTION vs DISCHARGE NOZZLE N-2 PUMP DISCHARGE 4", ASME 900LB RF
- PUMP NOZZLE vs ANCHOR BOLT HOLE N-3 CASING DRAIN 3/4", ASME 900LB RF
- PUMP NOZZLE HEIGHT & CENTER HEIGHT N-4 CASING VENT 3/4", ASME 900LB RF
up to 1600 mm ± 8 mm N-5 CASING VENT 3/4", ASME 900LB RF
JABEL HAFFET BASE PUMPING STATION
TRANSFER PUMP FOUNDATION PLAN Over 1600 mm ± 13 mm N-6 COOLING WATER INLET 1", ASME 150LB RF
ANCHOR BOLT DISTANCE ± 3 mm TRANSFER PUMP & DISTRIBUTION PUMP
BASE PLATE WIDTH ± 13 mm
N16297-GE-P00-CN-D007