You are on page 1of 3
is | Ee in ] A Contract No. N-60222102 f Matoriaivendor ONS Ot aceave es mea cuca ramen |S pSailg dil gut 4 ete | Works forCow Farm at Nani” | SHBSmong. Nb Dhabi Transmission & Despatch Comper ee [DTS Relatedte: |m TRANscO —|C ADDCIAADC | FEWA Co sewa Consultant Ref: 60222102-ACM-XX-XX-LT-PM-000707-AAN | Revision 0 Contractor Ref: AFLP/SCADA/MS/012/19/08/080 | | DTS Title: FAT Notfcation for Gateway Cabinet [ATRAN Date DTS submitted to GAugust2019 | Date DTS Received by thy the consultant | TRANSCO 14 AUG tog Region: | CT Abu Dhabi | mm ATAin Cl Western Region [Pderthen Epigies 2 Date DTS Date DTS Forwarded Designation pene: Received from | to E&C Engineer(s) Sioutare the Consultant Project Manager | Mohammed Kamal | F 2) E&C/ Discipii Date DTS | initial | Oate DTS Final Piectnane Name Received | Signiture Cleared bored Signature | : Chl Mechanical | I Electrical mec ease NA FED Ho % NOR pe Uy Hydraulics zy i - FOC I Tah Fy RVAGrF i Bi Ghee 3] : HOGI i 3) [] TRANSCO review is not required 4) se == - = Desi | Date DTS Date DTS Cleared r ignition Name Latin | lear Signature Praja Manager| — Wanarined Kanal eet 5) To be filled by the Project Engineer: Deviation Form | AP | NA [Project Engineer | Date | ~ Remarks Required i | ___| Signature a | mje] | | | = : J aa J Paget ott ieirace Aine nts a Emcaes 1497437026800 7 August 2018 Manager-Water Engineering- ur Reference ‘Commissioning Department, (60222102-ACM-XX-XX-LT-PM- ‘Abu Dhabi Transmission & (000707-AAN| Dispatcn Company, P.O. Box 173 ‘Abu Dhabi, UAE Atin: Eng. Mohammed Kamal Project: New Dairy Farm at Nahilin Al Ain SCADA Integration Work for Cow Farm at Nahil Subject: FAT Notification for Gateway Cabinet Dear Sirs, Pa "ete fo Transco approval forthe Gateway Cabinet and further to our submission to Transco for the Fypracedure Gateway Cabinet, by our latter ref. 60222102-ACM.XX-KX-LT-PM O00629.AAN cates 12 June 2019, see copies enclosed Please find enclosed Contractor letter ref. AFLP/SCADA/MS/012/19/08/080 dated 5 August 2019, requesting FAT for Gateway Cabinet on 25 August 2019 at 10 AM in Mussafah, Abu Dhabi Fart confi your acceptance for the above or advise your convenient date and tie to perform the FAT inspection. Also, enclosed the FAT location and address for your easy reference, Yours faithully, & Edwin Benedict Resident Engineer AECOM Middle East Limited E: Edwin.benedict@aecom.com fonclosures: As mentioned shove 6©) Mr. Younes Al Khem, P.O, Box 20277, Al Ain Fame, Projects Detnery Dvsion Manager, AADC, PO Box 1005, Asset Mansgement Decorate, TRANSCO, Abu Dhabi Ger Reference 222102 AOM.xX%-LTPM.0007O7 AAN (238622202 ani at Fam PiCj2 Coreapanderce? 7 Lenes222 Ougongiscasa 'megraton Works for Con FamiGerereiviss adaas G2 ACHIOE ELT EMS eaN doce “ we ys Abuau Wd Hydropower To, ‘Mis, AECOM Liwa Trading Building, Level, | Our reference: P.O, Box : 1419, AlAin = ‘Abu Dhabi, United Arab Emirates Department: Kind Attn. Eng. Edwin Benedict | Name Resident Engineer — — |Contact Detais 'Dae | 05082010 PROJECT: SCADA INTEGRATION WORKS FOR COW FARM ‘AT NAHIL = ‘SUBJECT; FAT Notification - Gateway Cabinet | i i Dear Sir, With reference to the above mentioned subject, please be informed that the Gateway Cabinet panel will be ready for FAT (Factory Acceptance Test) by 25” August 2019 Sunday. We request you to arrange Transco representatives for FAT Inspection for inspection and approval. FAT Inspection Date & Time | 25 August 2019 Sunday 10 AM FAT Location & Address Mis Babcock Borsig Service GMBH, . - | ICAD (Industrial City of Abu Dhabi), | Plot No-77/B7 Zone M-41, ICAD-1, PO Box- 46698, Mussafah, Abu Dhabi Tet: 02-4995099, Fax: 02-6502076. GPS Coordinates N24 20.051 , E054 30697 4 | Reference Documents 1. Material Submittal for Gateway Cabinet - | SIW/AFLPIHPE/ICITSI001 Rt 2. FAT Procedure for Gateway Cabinet SIW/AFLP/HPE/ICITS/008, Ro | Location Map Attached, " - This is for your information, records and necessary support. Thanking You, Fe Hydropower Eperg Be neral Construction SP {LC AECow MIDDLE EAST LIMITED. (ya EQ fs Kali ius & iy ist 5 Opera Enclosed: Locetion Map ead cc: Al Ain Farms for Livestock Productions oe ‘ Head otice oe Te: 49713 7621400 - Fan 4871 2 7690401 PO Ro» 15283 AL Ain, United Arab Emirates E-mail infonasiae Website “un neel ae

You might also like