You are on page 1of 1

Directorate of Erbil Borehole log

Construction Laboratory Based on ASTM D1587-00 & D6032-02

.Test Form No S - 12 Revision 05 Approve date 04.04.2019

Field Data
Project Name Con. Of rozh tawaer
Location Erbil BH No. A4 Lab No.
Drilling Method WASH DRILLING Groundwater level N.W.T Starting Date 24-8-2021
Machine Name massenza Level & Coordinate Sending Date 26-8-2021

Climat
e&
Sample Lab Material Description CR RQD No. of Blows
S Depth (m) (%) (%) Field
Type No. (30 cm)
Remar
ks
21 30.0 32.5 D 2554 Br. Silty clay with gravel

22 32.5 33.0 SS 2555 Br. Silty clay with gravel 38 50″5

23 33.0 35.5 D 2556 Br. Silty clay with gravel

24 35.5 36.0 SS 2557 Br. Silty clay with gravel 40 50″5

25 36.0 39.0 D 2558 Br. Silty clay with gravel

26 39.0 39.5 SS 2559 Br. Silty clay with gravel 39 50″5

27 39.5 41.5 D 2560 Br. Silty clay with gravel

28 41.5 42.0 SS 2561 Br. Silty clay with gravel 41 50″3

Remarks:
2-2

Tested by: Checked by: Approved by:


(Title/Name/Date/Signature)

You might also like