You are on page 1of 3

CRUSHING TEST REPORT NF EN 12390-3

CONTRACTOR Zerock CTR N° 52 30A100_RFI N°: 061 EXT MIX DESIGN

PROJECT 1st Agri Hub PART OF STRUCTURE Oil Storage Tank (footings C2 Castor 2) TRIAL MIX

POURING DATE 7/16/2023 ORIGIN OF CONCRETE Zerock Batching plant Loudima INFORMATION ✘

TEMPERATURE 29,2/ 28,4 °C SIZE OF SPECIMEN 16 x 32 cm NUMBER OF SPECIMEN 3

MIX DESIGN CODE 25-XC4-D25-S3-42.5N-SHR-S0/1


COMPOSITION OF CONCRETE CEMENT WATER SAND GRAVEL 1 GRAVEL 2 ADMIXTURE SLUMP TEST SPECIFIED

TYPE 42,5N - 0/1 5/12,5 16/25 ADMIX150 SLUMP TEST 0' 16,5 cm
THEORICAL (Kg/m3) 450 178.78 574 260 1018 4 SLUMP TEST 30'
PRATICAL - - - - - - SLUMP TEST 60'

COMPACTION Vibration CURING Water immersion

COMPRESSIVE
SPECIMEN AGE WEIGHT DENSITY LOAD
CRUSHING DATE STRENGHT FAILURE
REFERENCE
(J) (Kg) (T/m3) (KN) MPa AVERAGE
AH274 8 7/24/2023 15.92 2.48 532.46 26.48 Correct
AH275 8 7/24/2023 16.20 2.52 579.66 28.83 28.04 Correct
AH276 8 7/24/2023 15.84 2.46 578.95 28.80 Correct
Remarks

Inspectors for : GEOLAB ENI CONGO ZEROCK


Name
Signature
Date
Roulé
Concassé

Correct
Incorrect
Pervibration