PB evconcose | TECHNICAL QUERY (TQ) [HEEFT poo, ccs [SHE
ype
Inthe Republic of Congo, All Local Coment avaiable does not have this certfcation.
Following the development of new Cement Factories inthe county, the Government
cof Republic of Congo has puta ban on mpotaton of such products,
With the Ban on importation of such products, ZEROGK must make use of the
avatable local coment to execute the concrete actvtes inthe project. To maintain
th boot posible qualtyroquromonts ta Samant tobe weed has Boon eon to our
Laboratory for the necessary testing and confirmations. Attached Lab Results for
your review,
Contractor submit this present Derogation Request to the Company in order to
horiae him the use of this local cement inthe project construction actives.
ese ow004 DATE: ny 9
‘PROJECT NAME: CONGO ~ BIOFUEL 1" AGRI HUB INDUSTRIAL START-UP
UNIT: SYSTEM.
FROM ‘CTRSITE QUALITY MANAGER [TO crip aa
‘SuSSYSTEM ‘AREA ZEROCK.
TAGN': NA FLW ‘004 EXT.
‘CONTRACTOR ORAWNG: NA CLIENT ORANG NA
TECHNICAL QUERY TITLE: The use Dango Coment CEM I 42.5N witout aval catcaion UNL-EN 197.4
feamcauiry [URGENT [ROUTINE
(CLASSIFICATION: [ESSENTIAL = NON-ESSENTIAL Ll
REQUIREMENT: (cLaiicarion LI [DEvariOn il
‘DEROGATION REQUEST: ‘Signed for and on ball
ENI Project Qualty specications requires the use of Cement with a Vaid of CONTRACTOR:
(Cerfeation UN-EN 197-1 wane:
Florian MABOUIMGA
DATE: 25082023
‘COMPANY RESPONSE:
‘Signed for and on behalf
‘ot COMBANY.
DATE:
ATTACHEMENT: YES MNO] oe
REPORT OF PHYGICO-MECHANICAL TESTS OF
TI company reviews complete. Contractor may proces
NOTES: Legibe Signature requested
[EcoNTRACTOR may proced subject implementation of CONPANY conment
El conTRACTOR may no proceed, Reubminson required.
ae
cermzenoen, | FLOeI AN ABOUT 25 05 [ov