You are on page 1of 1
PB evconcose | TECHNICAL QUERY (TQ) [HEEFT poo, ccs [SHE ype Inthe Republic of Congo, All Local Coment avaiable does not have this certfcation. Following the development of new Cement Factories inthe county, the Government cof Republic of Congo has puta ban on mpotaton of such products, With the Ban on importation of such products, ZEROGK must make use of the avatable local coment to execute the concrete actvtes inthe project. To maintain th boot posible qualtyroquromonts ta Samant tobe weed has Boon eon to our Laboratory for the necessary testing and confirmations. Attached Lab Results for your review, Contractor submit this present Derogation Request to the Company in order to horiae him the use of this local cement inthe project construction actives. ese ow004 DATE: ny 9 ‘PROJECT NAME: CONGO ~ BIOFUEL 1" AGRI HUB INDUSTRIAL START-UP UNIT: SYSTEM. FROM ‘CTRSITE QUALITY MANAGER [TO crip aa ‘SuSSYSTEM ‘AREA ZEROCK. TAGN': NA FLW ‘004 EXT. ‘CONTRACTOR ORAWNG: NA CLIENT ORANG NA TECHNICAL QUERY TITLE: The use Dango Coment CEM I 42.5N witout aval catcaion UNL-EN 197.4 feamcauiry [URGENT [ROUTINE (CLASSIFICATION: [ESSENTIAL = NON-ESSENTIAL Ll REQUIREMENT: (cLaiicarion LI [DEvariOn il ‘DEROGATION REQUEST: ‘Signed for and on ball ENI Project Qualty specications requires the use of Cement with a Vaid of CONTRACTOR: (Cerfeation UN-EN 197-1 wane: Florian MABOUIMGA DATE: 25082023 ‘COMPANY RESPONSE: ‘Signed for and on behalf ‘ot COMBANY. DATE: ATTACHEMENT: YES MNO] oe REPORT OF PHYGICO-MECHANICAL TESTS OF TI company reviews complete. Contractor may proces NOTES: Legibe Signature requested [EcoNTRACTOR may proced subject implementation of CONPANY conment El conTRACTOR may no proceed, Reubminson required. ae cermzenoen, | FLOeI AN ABOUT 25 05 [ov

You might also like