Professional Documents
Culture Documents
12390-3
Number of Test Report 108
Project CONGO – BIOFUEL 1st AGRI HUB - INDUSTRIAL START-UP
Contractor ZEROCK CONSTRUCTION CONGO
Origin of Concrete Zerock Concrete Batching Plant in Loudima
Heliport; 2nd line Production; Shed compressor / Longrin ; Trench ; Footing / -Longrin_A4-A2; -TR22_F11-F31
Wall; -C1-B1-A1-C4-D3-D4-B2-B1-D2-A1-A2
30A100_RFI_215 EXT
Number notification 30A100_RFI_247 EXT Date of receipt 10/15/2023
30A100_RFI_297 EXT
Name
Signature
Date