You are on page 1of 1

CONCRETE COMPRESSIVE STRENGTH TEST REPORT NF EN

12390-3
Number of Test Report 110
Project CONGO – BIOFUEL 1st AGRI HUB - INDUSTRIAL START-UP
Contractor ZEROCK CONSTRUCTION CONGO
Origin of Concrete Zerock Concrete Batching Plant in Loudima

Temperature 30.1 / 30 °C Size of specimen (16 x 32 cm) x 3

Pouring date 10/18/2023 Slump test at 0' 12 cm


Mix Design Code 25 - XC4 - D25 - S3 - 42.5N - SHR - S0/1
Composition Cement Water Sand Gravel 1 Gravel 2 Admixture
Type 42,5N - 0/1 5/12,5 16/25 Admix150
Quantity(Kg/m3) 450 178.78 574 260 1018 4
Part of Structure

WORKSHOP / Footing ; Sub-column / B1F02-A2IF01-C5IFO1-C6IF01; Sub-column(A1IF01-A2IFO1-A3IFO1-


A4IFO1-C1IFO1-C2IFO1-C3IFO1-C4IFO1)

30A100_RFI_221 EXT
Number notification 30A100_RFI_251 EXT Date of receipt 10/21/2023
30A100_RFI_304 EXT

Curing by Density Strength (Mpa)


Spec. Tag Crushing date Weight (Kg) Load (kN)
days (T/m3) Unit Average
AH853 15.86 2.47 252.84 12.58
AH854 7 10/25/2023 15.90 2.47 355.90 17.70 15.97
AH855 16.04 2.49 354.76 17.64
AH856 16.10 2.50 393.95 19.59
AH857 28 11/15/2023 15.98 2.48 412.80 20.53 20.14
AH858 15.94 2.48 407.93 20.29
AH859 15.96 2.48 512.86 25.51
AH860 56 12/13/2023 16.16 2.51 425.95 21.18 22.80
AH861 16.00 2.49 436.71 21.72

Inspection execution result


ACCEPTED ⃣ REJECTED ⃣ POSTPONED ⃣ CANCELLED ⃣
Remarks :

Inspectors for : GEOLAB ENI CONGO ZEROCK

Name

Signature

Date