You are on page 1of 5

Contractor Consultant

CONSTRUCTION OF NEW SELANDER BRIDGE AND ITS


GS Engineering and CONNECTING ROADS Yooshin Engineering
Construction Corporation Cooperation In
Association with Afrisa
Contr.No. TRD/HQ/1007/2018/19
FIELD DENSITY TEST BY SAND CONE METHOD
TEST METHOD: AASHTO T 191; BS 1377-9:1990 Sample No. FDT - 193

Road Name: Barack Obama Road Layer Tested :Fill, First Layer Testing Date: 11/18/2019

Location:0+020 - 0+080km, LHS & RHS Material Source : Bunju A Samped & Tested by: Jointly

Layer Thickness: 150mm Material Type : G15


CALIBRATION DATA:
A) Bulk Density of Sand 1.335 g/cc
FIELD DATA
Test Number: 1 2 3 4 5 6 7 8
Cylinder No. C J C
Station/Chainage 0+028 0+060 0+050
Offset from Centre Line CL 4m, LHS 5m, RHS
Excavation Depth: mm 150 150 150
B) Mass of Sand in Cone g 758 750 758
C) Mass of Sand before pouring g 6000 6000 6000
D) Mass of Sand after pouring g 1712 1713 1841
E) Mass of Sand in Hole: (C - D - B) g 3530 3537 3401
F) Volume of hole: (E / A) cc 2644 2649 2548
G) Mass of excavated Soil from Hole g 5880 5644 5740
H) Wet Density Soil: (G / F) kg/m3 2223.7 2130.3 2253.1
MOISTURE CONTENT DATA
Container No. W15 W22 W20
J) Mass of Container + Wet Soil g 317.7 377.6 361.40
K) Mass of Container + Dry Soil g 297.5 354.20 337.8
L) Mass of Container g 36.6 36.0 34.2
M) Mass of Moisture: (J - K) g 20.2 23.4 23.6
N) Mass of Dry Soil: (K - L) g 260.9 318.2 303.6
P) Moisture Content: (M / N) x 100 % 7.7 7.4 7.8
COMPACTION DATA
Q) Dry Density: ρd = 100xH/(100+P) kg/m3 2064 1984 2091
R) Maximum Dry Density, MDD kg/m3 2072 2072 2072
S) Optimum Moisture Content % 7.9 7.9 7.9
Relative Density: (100xQ/R) % 99.6 95.8 100.9
Actual Mean Relative Density % 98.8
Actual Min. Single Value Relative Density % 95.8
Specified Nominal Value Relative Density % 90.0
Specified Min. Mean Rel. Density @ 3 Tets % 90.1
Specified Min. Single Value @ 3 Tests % 86.4
Comment:

Contractor Consultant
Tested by: Checked by: Approved by:
Signature: Signature: Signature
Date: Date: Date:
Contractor Consultant
CONSTRUCTION OF NEW SELANDER BRIDGE AND ITS
GS Engineering and CONNECTING ROADS Yooshin Engineering
Construction Corporation Cooperation In
Association with Afrisa
Contr.No. TRD/HQ/1007/2018/19

Sampling of Rebars ø 40mm, at A2 CRMBEG Construction Yard on 26th September 2019


Contractor Consultant
CONSTRUCTION OF NEW SELANDER BRIDGE AND ITS
GS Engineering and CONNECTING ROADS Yooshin Engineering
Construction Corporation Cooperation In
Association with Afrisa
Contr.No. TRD/HQ/1007/2018/19
FIELD DENSITY TEST BY SAND CONE METHOD
TEST METHOD: AASHTO T 191; BS 1377-9:1990 Sample No. FDT -
Road Name: Layer Tested : Testing Date:

Location: Material Source : Samped & Tested by:

Layer Thickness: Material Type:


CALIBRATION DATA:
A) Bulk Density of Sand 1.335 g/cc
FIELD DATA
Test Number: 1 2 3 4 5 6 7 8
Cylinder No.
Station/Chainage
Offset from Centre Line
Excavation Depth: mm
B) Mass of Sand in Cone g
C) Mass of Sand before pouring g
D) Mass of Sand after pouring g
E) Mass of Sand in Hole: (C - D - B) g
F) Volume of hole: (E / A) cc
G) Mass of excavated Soil from Hole g
H) Wet Density Soil: (G / F) kg/m3
MOISTURE CONTENT DATA
Container No.
J) Mass of Container + Wet Soil g
K) Mass of Container + Dry Soil g
L) Mass of Container g
M) Mass of Moisture: (J - K) g
N) Mass of Dry Soil: (K - L) g
P) Moisture Content: (M / N) x 100 %
COMPACTION DATA
Q) Dry Density: ρd = 100xH/(100+P) kg/m3
R) Maximum Dry Density, MDD kg/m3
S) Optimum Moisture Content %
Relative Density: (100xQ/R) %
Actual Mean Relative Density %
Actual Min. Single Value Relative Density %
Specified Nominal Value Relative Density %
Specified Min. Mean Rel. Density @ 4 Tets %
Specified Min. Single Value @ 4 Tests %
Comment:

Contractor Consultant
Tested by: Checked by: Approved by:
Signature: Signature: Signature
Date: Date: Date:

You might also like