PROVINCIAL ROADS IMPROVEMENT PROJECT

(JBIC Funded)
C1NE1-B, BARTHFORD - VALLEY ROAD

ENGINEER CONTRACTOR

NIPPON KOEI CO., LTD W.G.M.M.PADMINIE CO (PVT) LTD.

AGGREGATE FLAKINESS INDEX


(Test Method - BS- 812 : Part1: 1975)

Sample No BV-AGG-006 Sample Description All in aggregate


Date of Testing 29/7/2007 Location Evereen Metal Crusher

Sieve size mm ( 50.0 ~ 37.5 ) ( 37.5 ~ 28.0 ) ( 28.0 ~ 20.0 ) ( 20.0 ~ 14.0 ) ( 14.0 ~ 10.0 ) ( 10.0 ~ 6.3 )

% Retained 0.7 12.0 18.2 15.1 14.2 14.7

Weight Passing Gauge Weight Retained on Gauge


Sieve Size Weight of Fraction
Weight of Sub (m3 ) (m4 )
of Material
Divided Fraction
(m2 )
Passing Retained Determined Adjusted Determined Adjusted

50.0 mm 37.5 mm 102.0 39.0 63.0 63.0

37.5 mm 28.0 mm 1512.0 1512.0 372.0 372.0 1140.0 1140.0

28.0 mm 20.0 mm 2240.0 2240.0 512.0 512.0 1728.0 1728.0

20.0 mm 14.0 mm 1857.0 1857.0 427.0 427.0 1430.0 1430.0

14.0 mm 10.0 mm 1841.0 1841.0 498.0 498.0 1343.0 1343.0

10.0 mm 6.3 mm 1933.0 1933.0 541.0 541.0 1392.0 1392.0

Total 9485.0 9383.0 2350.0 2389.0 7096.0 7096.0

m3
Flakiness Index=
m2
×100= 25 %

Sample from Evereen Metal Crusher @ Hatton, DMCC Ground Stock pile 2
Remarks

Specification Limit < 35%

Name …………………………………………………………. …………………………………………………………..

Designation …………………………………………………………. …………………………………………………………..

Signature …………………………………………………………. …………………………………………………………..

Date …………………………………………………………. …………………………………………………………..

Tested by Approved by
PROVINCIAL ROADS IMPROVEMENT PROJECT
(JBIC Funded)
C1NE1-B, BARTHFORD - VALLEY ROAD

ENGINEER CONTRACTOR

NIPPON KOEI CO., LTD W.G.M.M.PADMINIE CO (PVT) LTD.

AGGREGATE IMPACT VALUE


(Test Method - BS - 812 : Part 3: 1975 )

Sample No BV-AGG-006 Sample Location Evereen Metal Crusher

Date Tested 29/7/2007 Type of Material All in aggregate

Proposed Use Road Work

Sample passing 14.00 mm and retained on 10.00 mm sieves

Test No 1 2

Weight of sample + mould W1 (g) 1113.0 1114.0

Weight of mould W2 (g) 760.0 760.0

Weight of sample W 3=W 1 −W 2 (g) 353 354.0

Weight of fines passing 2.36mm sieve after test W4 (g) 93.0 93.0

W4
Aggregate impact value AIV = ×100 (%) 26.3 26.3
W3

Average Value % 26

Sample from Evereen Metal Crusher @ Hatton, DMCC Ground Stock pile 2
Remarks
Specification <45

Name ……………………………………………… ………………………………………………

Designation ……………………………………………… ………………………………………………

Signature ……………………………………………… ………………………………………………

Date ……………………………………………… ………………………………………………


Tested by Approved by
PROVINCIAL ROADS IMPROVEMENT PROJECT
(JBIC Funded)
C1NE1-B, BARTHFORD - VALLEY ROAD
ENGINEER CONTRACTOR

NIPPON KOEI CO., LTD W.G.M.M.PADMINIE CO (PVT) LTD.


PARTICLE SIZE SIEVE ANALYSIS FOR ALL IN AGGREGATE 37.5 mm

Type of Material mm All in aggregate Sample No BV/AGG/006


Weight of Dry Sample g 15595.0 Date Tested 29/7/2007

Particle Weight Percentage Cummulative Total Passing Nominal size aggregate


Sieve Size Diameter Retained Retained Retained Percentage Spec limit
( mm ) Micro meter g % % %
50.0 50000 0.0 0.0 0.0 100.0 100 100
37.5 37500 102.0 0.7 0.7 99.3 95 100

20.0 20000 3752.0 24.1 24.7 75.3 45 80


4.75 4750 6396.0 41.0 65.7 34.3 25 50
0.6 600 2899.0 18.6 84.3 15.7 8 30

0.15 150 1628.0 10.4 94.8 5.2 0 6


Pan 815.0 5.2 100.0 0.0
Total 15592.0
Passing Percentage

100

90

80

70

60

50

40

30

20

10

0
10 100 1000
Seive Size ( Micro meter ) 10000 100000

Sample from Evereen Metal Crusher @ Hatton, DMCC Ground Stock pile 2
Remarks

Name ………………………………………… ……….. …………………………………… ………………..

Designation ……………………………………….. ……….. ………………………………………………………..

Signature ……………………………………….. ……….. ………………………………………………………..

Date ……………………………………….. ……….. ………………………………………………………..

Tested by Approved by