PROVINCIAL ROADS IMPROVEMENT PROJECT

(JBIC Funded)
C1NE1-B, BARTHFORD - VALLEY ROAD

ENGINEER CONTRACTOR

NIPPON KOEI CO., LTD W.G.M.M.PADMINIE CO (PVT) LTD.

AGGREGATE IMPACT VALUE


(Test Method - BS - 812 : Part 3: 1975 )

Sample No KR-AGG-086 Sample Location Taridu Metal Crusher

Date Tested 12/6/2007 Type of Material ABC

Proposed Use Road Work

Sample passing 14.00 mm and retained on 10.00 mm sieves

Test No 1 2

Weight of sample + mould W1 (g) 1113.0 1114.0

Weight of mould W2 (g) 760.0 760.0

Weight of sample W 3=W 1 −W 2 (g) 353 354.0

Weight of fines passing 2.36mm sieve after test W4 (g) 95.0 92.0

W4
Aggregate impact value AIV = ×100 (%) 26.9 26.0
W3

Average Value % 26

Sample from Crusher Stock pile


Remarks
Specification <30

Taridu Crusher

Frequency test after 2800m3

Name ……………………………………………… ………………………………………………

Designation ……………………………………………… ………………………………………………

Signature ……………………………………………… ………………………………………………

Date ……………………………………………… ………………………………………………


Tested by Approved by
PROVINCIAL ROADS IMPROVEMENT PROJECT
(JBIC Funded)
C1NE1-B, BARTHFORD - VALLEY ROAD
ENGINEER CONTRACTOR

NIPPON KOEI CO., LTD W.G.M.M.PADMINIE CO (PVT) LTD.


PARTICLE SIZE SIEVE ANALYSIS FOR GRADED AGGREGATE BASE COURSE
Table 1701 -5 ( Nominal size aggregate )

Type of Material mm ABC Sample No BV/AGG/002


Weight of Dry Sample g 16941.0 Date Tested 16/3/2007

Particle Weight Percentage Cummulative Total Passing Nominal size aggregate


Sieve Size Diameter Retained Retained Retained Percentage Spec limit
( mm ) Micro meter g % % %
50.0 50000 0.0 0.0 0.0 100.0 100 100
37.5 37500 77.0 0.5 0.5 99.5 95 100

20.0 20000 9220.0 54.4 54.9 45.1 60 80


10 10000 3252.0 19.2 74.1 25.9 40 60
5 5000 1243.0 7.3 81.4 18.6 25 40

2.36 2360 534.0 3.2 84.6 15.4 15 30


0.425 425 1154.0 6.8 91.4 8.6 7 19
0.075 75 1113.0 6.6 97.9 2.1 5 12
Pan 343.0 2.0 100.0 0.0
Total 16936.0
Passing Percentage

100
90
80
70
60
50
40
30
20
10
0
10 100 1000
Seive Size ( Micro meter ) 10000 100000

Sample from Evereen Metal Crusher @ Hatton, DMCC Ground Stock pile 2
Remarks

Name ………………………………………… ……….. …………………………………… ………………..

Designation ……………………………………….. ……….. ………………………………………………………..

Signature ……………………………………….. ……….. ………………………………………………………..


Date ……………………………………….. ……….. ………………………………………………………..
Tested by Approved by