REF: GS/2016-17/SR/166
Name of Project : Imporvement/Augmentation of 2 laning with paved shoulders from km . 94.000 to km. 174.000 (Design chainage
from km. 94.000 to km. 174.000 ) of karaikudi - ramanathapuram section ofNH-210 Project in Tamilnadu (EPC Mode)
Date of
9/2/2017 Ground water level NE Total depth of Bore Hole 15.00 m
Commencement
Graphical
Ground Level
Soil Profiles
Depth from
Representation of SPT
Depth (m)
Samples
Type of
(Visual
Soil
Type 15 30 45 N N Value
Maximum discharge is in the Range of (+) / (-) 10% variation in the Average diacharge
Maximum discharge is in the Range of 8.440 - 10.315
Maximum discharge by A.V Method = 26.81 m3/sec
At Site - velocity = 0.93 m / sec
Max. discharge furnished by P.W.D = 0.00 m3/sec
Corresponding velocity = m / sec
= 0.038 m
Head causing the flow h H=+ ha 0.0012
CROSS SECTION AT 150 M =U/S FROM
0.038+0.15
SITE
= 0.188 m
Velocity through vent vv sqrt(
= 2xgxh)
= sqrt ( 2 x 9.81 x 0.188 )
= 1.92
Linear water way required Lww D / =( 0.9 x d x Vv)
= 26.8060463653086 / ( 0.9 x 1.904 x 1.921 )
= 8.144 m
LWW required = 8.144
LWW Provided = 10.000
10.00m > 8.14m Safe
As per clause 703.1 of the code IRC CODE 78-2000 under reference the design discharge
is increased by 30%
Total discharge for scour depth consideration = 26.81 x 1.30 =34.85
Annexure - B
Name of Project : Imporvement/Augmentation of 2 laning with paved shoulders from km . 94.000 to km. 174.000 (Design chainage
from km. 94.000 to km. 174.000 ) of karaikudi - ramanathapuram section ofNH-210 Project in Tamilnadu (EPC Mode)
= 1.5 x 1.935
Average Overburden Pressure (Pdi) = 2.903 t/Sq.m
Skin Friction (Rf) = KPdi tan Ø Asi + (a x C x As)
Rf = 10.454 / 3 = 3.49 t
Page 1
2nd Layer
Red Gravel
Type of Soil =
= 1.5 x 1.975
Rf = 20.22 / 3 = 6.74 t
3rd Layer
Type of Soil =
Gravel mix clay
= 1.5 x 1.793
Rf = 29.558 / 3 = 9.85 t
Page 2
4th Layer
= 1.5 x 1.831
Rf = 29.759 / 3 = 9.92 t
5th Layer
Clay
Type of Soil =
= 1.5 x 1.461
Rf = 25.428 / 3 = 8.48 t
Page 3
6th Layer
Clay
Type of Soil =
= 1.5 x 1.489
Rf = 25.566 / 3 = 8.52 t
7th Layer
Clay
Type of Soil =
= 1.5 x 1.492
Page 4
8th Layer
Kankar
Type of Soil =
= 1.5 x 2.086
Rf = 32.393 / 3 = 10.80 t
9th Layer
Kankar
Type of Soil =
= 1.5 x 2.097
Rf = 32.452 / 3 = 10.82 t
Page 5
10th Layer
Kankar
Type of Soil =
= 1.5 x 2.121
Rf = 32.582 / 3 = 10.86 t
Page 6
GS Associates
GEO-TECH ENGINEERING DIVISION
Annexure - B
Name of Project : Imporvement/Augmentation of 2 laning with paved shoulders from km . 94.000 to km. 174.000 (Design chainage
from km. 94.000 to km. 174.000 ) of karaikudi - ramanathapuram section ofNH-210 Project in Tamilnadu (EPC Mode)
= 1.5 x 1.935
Average Overburden Pressure (Pdi) = 2.903 t/Sq.m
Skin Friction (Rf) = KPdi tan Ø Asi + (a x C x As)
Rf = 13.59 / 3 = 4.53 t
Page 7
2nd Layer
Red Gravel
Type of Soil =
= 1.5 x 1.975
Rf = 26.286 / 3 = 8.76 t
3rd Layer
= 1.5 x 1.793
Rf = 38.426 / 3 = 12.81 t
Page 8
4th Layer
= 1.5 x 1.831
Rf = 38.686 / 3 = 12.90 t
5th Layer
Clay
Type of Soil =
= 1.5 x 1.461
Rf = 33.057 / 3 = 11.02 t
Page 9
6th Layer
Clay
Type of Soil =
= 1.5 x 1.489
Rf = 33.236 / 3 = 11.08 t
7th Layer
Clay
Type of Soil =
= 1.5 x 1.492
Rf = 31.726 / 3 = 10.58 t
Page 10
8th Layer
Kankar
Type of Soil =
= 1.5 x 2.086
Rf = 42.111 / 3 = 14.04 t
9th Layer
Kankar
Type of Soil =
= 1.5 x 2.097
Average Overburden Pressure (Pdi) = 9.011 t/Sq.m
Rf = 42.188 / 3 = 14.06 t
Page 11
10th Layer
Kankar
Type of Soil =
= 1.5 x 2.121
Rf = 42.357 / 3 = 14.12 t
Page 12
GS Associates
GEO-TECH ENGINEERING DIVISION
Annexure - B
Name of Project : Imporvement/Augmentation of 2 laning with paved shoulders from km . 94.000 to km. 174.000 (Design chainage
from km. 94.000 to km. 174.000 ) of karaikudi - ramanathapuram section ofNH-210 Project in Tamilnadu (EPC Mode)
= 1.5 x 1.935
Average Overburden Pressure (Pdi) = 2.903 t/Sq.m
Skin Friction (Rf) = KPdi tan Ø Asi + (a x C x As)
Rf = 20.907 / 3 = 6.97 t
Page 13
2nd Layer
Red Gravel
Type of Soil =
= 1.5 x 1.975
Rf = 40.44 / 3 = 13.48 t
3rd Layer
Ultimate Side Resistance or Skin Friction
= 1.5 x 1.793
Rf = 59.117 / 3 = 19.71 t
Page 14
4th Layer
= 1.5 x 1.831
Rf = 59.517 / 3 = 19.84 t
5th Layer
Ultimate Side Resistance or Skin Friction
Clay
Type of Soil =
= 1.5 x 1.461
Rf = 50.857 / 3 = 16.95 t
Page 15
6th Layer
Clay
Type of Soil =
= 1.5 x 1.489
Rf = 51.133 / 3 = 17.04 t
7th Layer
Clay
Type of Soil =
= 1.5 x 1.492
Rf = 48.81 / 3 = 16.27 t
Page 16
8th Layer
Kankar
Type of Soil =
= 1.5 x 2.086
Rf = 64.786 / 3 = 21.60 t
9th Layer
Ultimate Side Resistance or Skin Friction
Kankar
Type of Soil =
= 1.5 x 2.097
Rf = 64.905 / 3 = 21.64 t
Page 17
10th Layer
Kankar
Type of Soil =
= 1.5 x 2.121
Rf = 65.164 / 3 = 21.72 t
Page 18
GS Associates
GEO-TECH ENGINEERING DIVISION
Annexure - A
SAFE BEARING CAPACITY CALCULATIONS ON SHALLOW FOUNDATIONS
dc = 1.33
C. Inclination factor ( IS 6403 - 1981 - Ref Clause 5.1.2.3 )
ic = iq = (1- α/ 90)2
iγ = (1- α/Φ)2
For,
Gravel E =1200(N+6)
= 0.00579 x1000
Annexure - A
SAFE BEARING CAPACITY CALCULATIONS ON SHALLOW FOUNDATIONS
Name of Project : Imporvement/Augmentation of 2 laning with paved shoulders from km . 94.000 to km. 174.000 (Design chainage
from km. 94.000 to km. 174.000 ) of karaikudi - ramanathapuram section ofNH-210 Project in Tamilnadu (EPC Mode)
dc = 1.64
C. Inclination factor ( IS 6403 - 1981 - Ref Clause 5.1.2.3 )
ic = iq = (1- α/ 90)2
iγ = (1- α/Φ)2
For,
Gravel E =1200(N+6)
= 0.00154 x1000
Annexure - A
SAFE BEARING CAPACITY CALCULATIONS ON SHALLOW FOUNDATIONS
dc = 1.96
C. Inclination factor ( IS 6403 - 1981 - Ref Clause 5.1.2.3 )
ic = iq = (1- α/ 90)2
iγ = (1- α/Φ)2
For,
Gravel E =1200(N+6)
= 0.00199 x1000
Annexure - A
SAFE BEARING CAPACITY CALCULATIONS ON SHALLOW FOUNDATIONS
dc = 2.28
C. Inclination factor ( IS 6403 - 1981 - Ref Clause 5.1.2.3 )
ic = iq = (1- α/ 90)2
iγ = (1- α/Φ)2
For,
Gravel E =1200(N+6)
= 0.00296 x1000