Professional Documents
Culture Documents
Joint Measurement
Notes and Comm Nr Area (m2) L W H QTY Gridline (x) Gridline (y) Level Drawing Nr. Revision Remarks
Signature……………………………………
Name……………………………………….
Designation………………………………..
Date……………………………………….
DP World Dakar
Port d'Ndayane - Advance Works
MEASUREMENT SHEET
Date: 13.06.2023
BOQ Item Number : 3.4.7
Joint Measurement
Discription Nr Area (m2) L W H QTY Gridline (x)+M11 Gridline (y) Level Drawing Nr. Revision Remarks
2- Concrete C35/40
Precast Slab 2.00 1.00 6.00 1.20 0.300 4.32
4.32 m3
3- Formwork
Foundation 2.00 1.00 14.40 1.00 0.30 8.64
8.64 m2
Quantity Summary for Site Entrance Precast Slab
Actual Qty.
Sr.No Discription Unit
A
3- Formwork m2 8.64
Coeff. Actual Q'ty Req. Description Required Size Qty. Unit Actual Q'ty Req. Description MRF Qty. Unit MRF Qty. Unit
3544.8 3,544.83 Formwork (repetitions : 3 times) Author:
35m2/Liter
45% 1586.1 Plywood (Waterproof) (1200 x2400 x18mm) 534.0 m2 1,851.51 Plywood (Waterproof) 1,851.51 m2 623 Nos
78% 2749.2 White Wood (100x 100x 3000mm) 916.4 m 7,190.33 White Wood (4" x 4" x 13') 7,190.33 m 7,190 m
Author:
134% 338.8 White Wood (100 x 50 x 3000mm) 112.9 m 3,595.17 White Wood (4" x 2" x 13') 3,595.17 m 3,595 m .275 gram/m2
3544.8 Form Oil 101.3 Liter 3,544.83 Form Oil 3,544.83 m2 101.28 Liter
3544.8 Nails and consumables 3,544.83 Nails and consumables 3,544.83 m2 975 Kg
974.8 Kg
Diff.Qty. (1,275.90)
Author:
.275 gram/m2