You are on page 1of 12

STAGES OF PAYMENTS OF PAINTING WORK

BLDG - CLUB HOUSE & AMPI THEATRE (THE LANDMARK)

SR. LOCATION UNIT APPROX.


NO QUANTITY
1 CLUB HOUSE & AMPI THEATRE

A EXTERNAL - APEX PAINT

A.1 EX. APEX PAINT CLUB HOUSE SQ.FT 4336.67

A.2 EX. APEX PAINT AMPI THEATRE & COM. WALL SQ.FT 3333.90

B INTERNAL LUSTER PAINT - MULTIPURPOSE WALLS SQ.FT 1,239.30

C INTERNAL LUSTER PAINT - MULTIPURPOSE CEILING SQ.FT 2,975.32

D PREMIUM IMULSION PAINT


i) GYM ROOM & INDOOR GAME ROOM - WALLS SQ.FT 1,405.60

E TRACTOR IMULSION PAINT


i) GYM ROOM & INDOOR GAME ROOM - CEILING SQ.FT 427.34

F OIL PAINT SQ.FT 2,151.88

G MELLAMINE POLISH SQ.FT 139.78

TOTAL W.O AMOUNT


G WORK
LANDMARK)

RATE TOTAL AMOUNT

12.00 52,040.04

12.00 40,006.86

26.00 32,221.75

26.00 77,358.25

20.00 28,111.92

12.00 5,128.08

9.00 19,366.88

60.00 8,386.80

AL W.O AMOUNT 262,621


HOME ASSOCIATES
PROJECT - THE LANDMARK

MEASUREMENT SHEET
NATURE OF WORK - FLOORING WORK

LENGTH
SR.NO ITEM UNIT NOS. (In.ft)
1 CLUB HOUSE & AMPI THEATRE
A EXTERNAL - APEX PAINT
A.1 CLUB HOUSE
ELEVATION AT- A
i) CHANGING ROOM SIDE WALL SQ.FT 1 10.16
ii) SQ.FT 1 0.82
iii) STAIRCASE WALL BESIDE CH. ROOM ENT. SQ.FT 1 12.00
iv) STAIRCASE FRONT SIDE WALL SQ.FT 1 20.32
v) SQ.FT 1 13
vi) ENTRANCE STEPS SQ.FT 1 7.00
vii) STAIRCASE INSIDE PORTION SQ.FT 1 1.92
viii) STAIRCASE 2ND FLIGHT SQ.FT 1 7.66
ix) STAIRCASE 3RD FLIGHT SQ.FT 1 6.5
x) STAIRCASE 3RD FLIGHT WAIST SLAB SQ.FT 1 6.5
xi) STAIRCASE 3RD FLIGHT WAIST SLAB SQ.FT 1 6
xii) STAIRCASE 2ND FLIGHT SQ.FT 1 6
xiii) BOX OFFSETS SQ.FT 1 7.58
xiv) ENTRANCE AREA BESIDE STAIRCASE SQ.FT 1 17
xv) STAIRCASE FLIGHT RAILING TOP SQ.FT 2 7.16
xvi) STAIRCASE FLIGHT RAILING TOP SQ.FT 0.5 7.16
xvii) MIDLANDING TOP SQ.FT 1 6.5
xviii) MIDLANDING VERTICAL SQ.FT 1 5.5
xix) 2ND FLIGHT TOP SQ.FT 1 5.58
xx) 2ND FLIGHT TOP SQ.FT 2 8.58
xxi) 2ND FLIGHT TOP SQ.FT 1 8.58
xxii) 1ST FLIGHT TOP SQ.FT 1 6.5
xxiii) 1ST FLIGHT LANDING SQ.FT 1 6.5
SQ.FT 1 6.16
SQ.FT 1 6.16
SQ.FT 1 2.5
ELEVATION AT- B
i) GR. FR WINDOW SIDE WALL SQ.FT 1 24.32
ii) ELEVATIONAL BOX OFFSET SQ.FT 1 20.66
iii) 1ST. FR TO TERRACE WALL SQ.FT 1 20.66
iv) ELEVATIONAL BOX OFFSET - VERTICAL SQ.FT 2 9
v) ELEVATIONAL BOX OFFSET - HORIZENTAL SQ.FT 2 18

ELEVATION AT- C
i) LAWN AREA SIDE WALL SQ.FT 1 41
ii) INDOOR GAMES OUTER WALL SQ.FT 1 13.5
iii) GYM AREA OUTER WALL SQ.FT 1 13.5
iv) ELEVATIONAL BOX OFFSET - VERTICAL SQ.FT 4 9
v) ELEVATIONAL BOX OFFSET - HORIZENTAL SQ.FT 4 13.5
vi) PERGOLA PARAPET SQ.FT 2 7.25

ELEVATION AT- D
i) GYM AREA TOILET BESIDE WALL SQ.FT 1 20
ii) SQ.FT 1 3
iii) ELEVATIONAL BOX OFFSET - VERTICAL SQ.FT 4 9
iv) ELEVATIONAL BOX OFFSET - HORIZENTAL SQ.FT 4 13.5
v) INDOOR GAME ROOM 1ST FR TO TERRACE.FR SQ.FT 1 14.25
vi) ELEVATIONAL BOX OFFSET - VERTICAL SQ.FT 2 10.5
vii) ELEVATIONAL BOX OFFSET - HORIZENTAL SQ.FT 1 11.5
viii) INDOOR ROOM ENTRANCE WALL SQ.FT 1 21.42
ix) GYM ROOM ENTRANCE WALL SQ.FT 1 21.42
x) GYM ROOMRAILING SIDE WALL SQ.FT 1 14.25
xi) ELEVATIONAL BOX OFFSET - VERTICAL SQ.FT 2 10.50
xii) ELEVATIONAL BOX OFFSET - HORIZENTAL SQ.FT 1 10.5
CLUB HOUSE EXT

A.2 AMPI THEATRE & COMPOUND WALL


i) Compound wall behind stage area & Club house side wall Sq.ft 1 8
ii) Compound wall behind stage area & Club house side wall Sq.ft 1 19.82
iii) Compound wall behind stage area & Club house side wall Sq.ft 1 16.5
iv) Compound wall behind stage area & Club house side wall Sq.ft 1 17.75
v) Compound wall behind stage area & Club house side wall Sq.ft 1 18.25
vi) Compound wall behind stage area & Club house side wall Sq.ft 1 20
vii) Stage area plaster work Sq.ft 2 5
viii) Stage area plaster work Sq.ft 1 15
ix) Stage area plaster work Sq.ft 2 4.58
x) Stage area plaster work Sq.ft 2 4.58
xi) Stage area plaster work Sq.ft 2 5.50
xii) Labour Camp side Compound wall Plaster Sq.ft 1 17.00
xiii) Compound wall behind stage area Sq.ft 1 16.50
xiv) Sq.ft 1 19.82
xv) Sq.ft 1 8.00
xvi) Compound wall plaster kargil side area Sq.ft 1 20.00
xvii) Children area side compound wall plaster Sq.ft 1 30.00
xviii) Children area side compound wall plaster Sq.ft 1 20.00
xix) Children area side compound wall plaster Sq.ft 1 25.50
xx) Sq.ft 1 19.82
xxi) Sq.ft 1 14.00
xxii) Sq.ft 1 19.82
xxiii) Sq.ft 1 13.00
Sq.ft 1 6.00
Multi purpose side compound wall plaster Sq.ft 1 44.00
Multi purpose side compound wall plaster Sq.ft 1 5.00
Multi purpose side compound wall plaster Sq.ft 1 11.00
Swimming pool area side Compound wall Sq.ft 1 21.00
Swimming pool area toilet side compound wall Sq.ft 1 9.00
Dr. Plot side compound wall Sq.ft 1 40.00
Swimming pool side Ret. wall Sq.ft 1 49.00
Dr. Plot side compound wall Sq.ft 1 52.00

AMPI THEATRE & COMP.WALL

B INTERNAL LUSTER PAINT


B.1 WALLS
i) MULTIPURPOSE HALL SQ.FT 1 41.5
ii) SQ.FT
iii) SQ.FT
iv) MULTIPURPOSE HALL TOILETS PASSAGE AREA SQ.FT 1 36.5
v) MULTIPURPOSE HALL TOILETS PASSAGE CEILING SQ.FT 1 9.42
vi) MULTIPURPOSE HALL TOILETS CEILING SQ.FT 1 3.82
vii) MULTIPURPOSE HALL TOILETS CEILING SQ.FT 1 3.75
viii) CHANGING ROOM PASSAGE WALLS SQ.FT 1 31
ix) CHANGING ROOM PASSAGE CEILING SQ.FT 1 8.5
x) SQ.FT 1 4.42
xi) CHANGING ROOM CEILING SQ.FT 2 3.82
xii) ` SQ.FT 1 3.75

B.2 CEILING
MULTIPURPOSE HALL
1 FALSE CEILING WORK SQFT. 1 1000
2 VERTICALS DESIGN WORK SQFT. 1 842.88

3 CEILINGS AREA
BEAM BOTTOMS SQFT. 2 22.08
SQFT. 1 22
SQFT. 1 22
SQFT. 2 22
SQFT. 2 22
SQFT. 2 8
SQFT. 2 7.92
SQFT. 2 7.82
SQFT. 4 6.75
SQFT. 8 6.75
SQFT. 8 4
SQFT. 4 7.33
SQFT. 8 7.33
SQFT. 8 4
SQFT. 4 6.75
SQFT. 8 6.75
SQFT. 8 4
SQFT. 1 22
SQFT. 4 8
SQFT. 6 6.82
SQFT. 6 5
SQFT. 4 5.5
SQFT. 4 3.5
CEILING AREA BESIDE MELLAMINE POLISH SQ.FT 1 22

VERTICAL DESIGN SQ.FT 2 6.82


SQ.FT 2 6.82
SQ.FT 2 3.82
SQ.FT 2 5
SQ.FT 2 8

LED STRIPS PATTI DESIGN WORK R.FT 6 1


R.FT 4 1
R.FT 4 1
R.FT 2 1

C PREMIUM IMULSION PAINT - CEILING

i) INDOOR GAMES ROOM CEILING SQ.FT 1 11.5


ii) GYMNASIUM ROOM CEILING SQ.FT 1 11.5

D TRACTOR IMULSION PAINT - WALLS


i) INDOOR GAMES ROOM WALLS SQ.FT 1 62

ii) GYMNASIUM ROOM WALLS SQ.FT 1 61

TRACTOR IMULS

E MELLAMINE POLISH
i) MULTIPURPOSE HALL PLY AREA SQ.FT 2 1.58
ii) SQ.FT 2 2
iv) DOOR AREA SQ.FT 1 11

D OIL PAINT

i) CLUB HOUSE TERRACE RAILING WORK Sq.ft 1.5 145.25


ii) CLUB HOUSE STAIRCASE RAILING WORK Sq.ft 1.5 165.00
iii) M.S CHAINLINK JALI FRAME FOR MULTIPURPOSE AREA Sq.ft 1.5 1262.00
iv) M.S. RAILING ABOVE RET. WALL AT SWIMMING POOL SIDE AREA Sq.ft 1.5 125.00
v) M.S. PERGOLA WORK Sq.ft 1 237.00
TES
MARK
Wing - B WING
Date - 10/9/2015
RK

HEIGHT QNTY
(In.ft) (In Sq.ft) Deduction Remark

11.66 118.47
11.66 9.56 -33.32 DOOR = 3'11" X 8'6"
10.55 126.64
7.50 152.40
4.00 52.00
5.00 35.00
2.50 4.80
2.50 19.15
3.00 19.50
6.58 42.77
5.00 30.00
9.16 54.96 -17.37 OPENING = 4 X 8" X 6.58
13.58 102.94 -38.5 DOOR = 5'6" X 7'
11 187.00 -27.94 WINDOW = 5'6" X 5'1"
0.82 11.74
0.82 2.94
0.75 4.88
1.25 6.88
1.25 6.98
0.75 12.87
1.25 10.73
1.25 8.13
0.25 1.63
1.25 7.70
0.25 1.54
1.25 3.13

13.5 328.32 -60 W = 12' X 5'


0.66 13.64
10 206.60 -36 W = 2 X 4'6''X 4'
0.75 13.50
0.75 27.00
0.00
0.00
13.5 553.50 -38.5 DOOR = 5'6" X 7'
10 135.00 -40 W = 2 X 4'X 5'
10 135.00 -17.37 OPENING = 4 X 8" X 6.58
0.75 27.00 -25 W = 5'X 5'
0.75 40.50
2.5 36.25
0.00
0.00
21.5 430.00 -36.82 W= 2 X 3'10" X 4'10"
11.5 34.50 -15.32 V = 3X 2.66 X 1.92
0.75 27.00 -10.21 V =2X 2.66 X 1.92
0.75 40.50
11 156.75 -20.485 W= 4'3" X 4'10"
0.82 17.22
0.82 9.43
11 235.62
11 235.62
11 156.75
0.82 17.22
0.82 8.61
CLUB HOUSE EXTERNAL - APEX PAINT 4336.67

7 56.00
5.5 109.01
7 115.50
5.5 97.63
7 127.75
5.5 110.00
7 70.00
9 135.00
5.5 50.38
0.5 4.58
0.5 5.50
7 119.00
8.32 137.28
7 138.74
8.82 70.56
11 220.00
3.82 114.60
2.5 50.00
2.5 63.75
4.75 94.15
5.92 82.88
4.75 94.15
5.92 76.96
4.75 28.50
8.5 374.00
5.5 27.50
2 22.00
3 63.00
3.5 31.50
6 240.00
4 196.00
4 208.00

HEATRE & COMP.WALL EXTERNAL - APEX PAINT 3333.90

8 332.00 VENEER/ MELLAMINE AREA


0.00 -82.5 PLY AREA =-11 X7'6"
0.00 -60 W = 12' X 5'
9 328.50
3.82 35.98
4.82 18.41
3.82 14.33
8.82 273.42
3.92 33.32
3.92 17.33
3.82 29.18
3.82 14.33

INTERNAL LUSTER PAINT - WALLS 1239.30

1000 1000
842.88 842.88
1.66 73.31
2.16 47.52
0.42 9.24
1.16 51.04
0.33 14.52
0.33 5.28
0.33 5.23
0.33 5.16
0.33 8.91
0.75 40.50
0.75 24.00
4 117.28
0.75 43.98
0.75 24.00
4 108.00
0.75 40.50
0.75 24.00
8 176.00
0.33 10.56
0.16 6.55
0.33 9.90
0.16 3.52
0.33 4.62
2.16 47.52

0.16 2.18
0.16 2.18
0.33 2.52
0.33 3.30
0.75 12.00

22 132.00
8.16 32.64
7.16 28.64
7.92 15.84

INTERNAL LUSTER PAINT -CEILING 2975.32

18.58 213.67
18.58 213.67

PREMIUM IMULSION PAINT - CEILING 427.34

8.75 542.50 -72.75 DOOR OPEN = 2X 5'10" X 6'3"


-40.10 W = 2 X 4'2" X 4'10"
8.75 533.75 -36.82 W = 2 X 3'10" X 4'10"
-5.11 V = 1X 1'11" X 2'8"
-65.53 PLY AREA =-2 X 6'8" 4'11"
-43.4928 W = 2 X 4'5" X 4'11"
-65.5344 W = 2 X 6'8" X 4'11"

TRACTOR IMULSION PAINT - WALLS 1405.60

8 25.28
8 32.00
7.5 82.50

MELLAMINE POLISH 139.78

145.25 217.875
165.00 247.5
1262.00 1262.00
125.00 187.5
237.00 237
OIL PAINT 2151.88