Professional Documents
Culture Documents
UNIT UNIT
MATERIAL LABOR
WORK ITEMS QTY UNIT MATERIAL LABOR PRICE REMARKS
COST COST
COST COST
1.) TOP MOST LAYER OF THE EXISTING ROOF 65.00 sqm - 160.00 - 10,400.00 10,400.00
2.) SECONDARY LAYER OF THE EXISTING ROOF 54.00 sqm - 160.00 - 8,640.00 8,640.00
3.) PRIMARY LAYER OF EXISTING ROOF & TRUSSES 192.00 sqm - 160.00 - 30,720.00 30,720.00
Subtotal 49,760.00
2.) INTERIOR WALLS AND PARTITIONS 155.00 sqm - 185.00 - 28,675.00 28,675.00
Subtotal 86,765.00
Subtotal 5,000.00
Subtotal 55,500.00
1.) DEMOLITION HAMMER / CHIPPING GUN WITH CONSUMABLES 2.00 set 7,500.00 - 15,000.00 - 15,000.00
3.) WELDING MACHINE AND CONSUMABLES 1.00 set 2,500.00 - 2,500.00 - 2,500.00
Subtotal 30,400.00
1.) HAUL-OUT / DISPOSAL OF DEBRIS 20.00 truck loads 2,700.00 - 54,000.00 - 54,000.00
Subtotal 54,000.00
PREPARED BY : CONFORMED BY :