RAMSON - ABP III CONSTRUCTIONARCHITECTS * ENGINEERS * BUILDERS * CONTRACTORS

BLK 8 LOT 5 CHRYSANTHEMUM ST. CAMELLA HOMES B.L.S BRGY. DON BOSCO, PARANAQUE CITY

Project : PROJECT AZOTIEA RESORT WORLD MANILA


Location : Newport Boulevard, Newport City, Pasay 1309, Metro Manila, Phillipines QUOTATION NO. RWM-2019-05

Subject : 11TH FLOOR STRUCTURAL STEEL AND RETROFITTING WORKS


BREAKDOWN OF COST PROPOSAL

MATERIAL
PARTICULAR QTY UNIT LABOR COST UNIT COST TOTAL COST
COST

I General Requirements
a) Mobilization 1.00 lot 40,000.00 40,000.00 40,000.00
b) Power and Water Consumption 1.00 lot 30,000.00 30,000.00 30,000.00
d) Temporary Facilities 1.00 lot 20,000.00 20,000.00 20,000.00
e) Safety 1.00 lot 50,000.00 50,000.00 50,000.00
f) Demobilization 1.00 lot 30,000.00 30,000.00 30,000.00
Total "I" 170,000.00

II 11TH FLOOR STRUCTURAL STEEL AND RETROFITTING WORKS


a) General Works
1. Formworks/Scaffolding 1.00 lot 50,000.00 50,000.00 50,000.00
2. Disposal of debris 1.00 lot 40,000.00 40,000.00 40,000.00
3. Hauling 1.00 lot 75,000.00 75,000.00 75,000.00
b) Framing Works
1. IPE 150x150x12 10.00 pcs 15,000.00 5,000.00 20,000.00 200,000.00
2. 1mm thk. Gr. 40 metal decking 56.00 sq.m 2,000.00 500.00 2,500.00 140,000.00
4. Anchor Bolts/ Bolts & Nuts/Shear Stud 1.00 lot 25,000.00 25,000.00 25,000.00
c) Concreting
1. Slab on extension of top floor 7.00 cu.m. 7,500.00 1,500.00 9,000.00 63,000.00
2. Slab on extension of roof deck 3.00 cu.m. 7,500.00 1,500.00 9,000.00 27,000.00
d) Reinforcing bars
1. Slab on grade
12mm 1,500.00 kgs 80.00 50.00 130.00 195,000.00
e) Others
1. G.I. Wire # 16 80.00 kgs 150.00 50.00 200.00 16,000.00
2. Chem Anchor 10.00 tube 6,500.00 500.00 7,000.00 70,000.00
3. Tools and Equipment 1.00 lot 100,000.77 100,000.77 100,000.77
Total "II" 1,001,000.77
NET AMOUNT 1,171,000.77
2% EWT 23,420.02
12% VAT 140,520.09
TOTAL AMOUNT(VAT Inclusive) 1,334,940.88

We anticipate your positive response and look forward to serve this requirement soon.

Best regards,

ENGR. SONNY PANALIGAN


President/ General Manager
RAMSON-ABPII CONSTRUCTION
sonnypanaligan1977@yahoo.com
CP: +639455276226

1 of 6
RAMSON - ABP III CONSTRUCTION
ARCHITECTS * ENGINEERS * BUILDERS * CONTRACTORS
BLK 8 LOT 5 CHRYSANTHEMUM ST. CAMELLA HOMES B.L.S BRGY. DON BOSCO, PARANAQUE CITY

Project : PROJECT AZOTIEA RESORT WORLD MANILA


Location : Newport Boulevard, Newport City, Pasay 1309, Metro Manila, Phillipines QUOTATION NO. RWM-2019-05

2 of 6
RAMSON - ABP III CONSTRUCTION
ARCHITECTS * ENGINEERS * BUILDERS * CONTRACTORS
BLK 8 LOT 5 CHRYSANTHEMUM ST. CAMELLA HOMES B.L.S BRGY. DON BOSCO, PARANAQUE CITY

Project : PROJECT AZOTIEA RESORT WORLD MANILA


Location : Newport Boulevard, Newport City, Pasay 1309, Metro Manila, Phillipines QUOTATION NO. RWM-2019-05

3 of 6
RAMSON - ABP III CONSTRUCTION
ARCHITECTS * ENGINEERS * BUILDERS * CONTRACTORS
BLK 8 LOT 5 CHRYSANTHEMUM ST. CAMELLA HOMES B.L.S BRGY. DON BOSCO, PARANAQUE CITY

Project : PROJECT AZOTIEA RESORT WORLD MANILA


Location : Newport Boulevard, Newport City, Pasay 1309, Metro Manila, Phillipines QUOTATION NO. RWM-2019-05

4 of 6
RAMSON - ABP III CONSTRUCTION
ARCHITECTS * ENGINEERS * BUILDERS * CONTRACTORS
BLK 8 LOT 5 CHRYSANTHEMUM ST. CAMELLA HOMES B.L.S BRGY. DON BOSCO, PARANAQUE CITY

Project : PROJECT AZOTIEA RESORT WORLD MANILA


Location : Newport Boulevard, Newport City, Pasay 1309, Metro Manila, Phillipines QUOTATION NO. RWM-2019-05

5 of 6
RAMSON - ABP III CONSTRUCTION
ARCHITECTS * ENGINEERS * BUILDERS * CONTRACTORS
BLK 8 LOT 5 CHRYSANTHEMUM ST. CAMELLA HOMES B.L.S BRGY. DON BOSCO, PARANAQUE CITY

Project : PROJECT AZOTIEA RESORT WORLD MANILA


Location : Newport Boulevard, Newport City, Pasay 1309, Metro Manila, Phillipines QUOTATION NO. RWM-2019-05

6 of 6

You might also like