3.3.5.1.3 Supply and installation of non-skid waffle type concrete paver tiles 473 sqm 258,825.00 90,588.75 349,413.75
TL-1 to Living/Dining/Sleeping of Studio Units, to Living/Dining/Bedrooms of 1BR & 2BR Units 17,676 sqm 67,695,490.00 23,693,421.50 91,388,911.50
3.3.8.2.5 300x300 Class A Ceramic Tiles 14,288.00 sqm 54,720,505.00 19,152,176.75 73,872,681.75
3.4 Granite Countertop and BackSplash for Kitchen Cabinets 1,002.24 sq.m 16,061,538.46 5,621,538.46 21,683,076.92
3.7.1.2.8 Supply & Installation of 300 x 150mm base board tiles @ UG Toilet 1.29 sqm 3,130.00 4,225.50
1,095.50
SPECIAL WALL FINISHES (FOR RECEPTION/LOBBY/MAIN ELEVATOR LOBBY AT UPPER GROUND FLOOR)
3.7.1.2.1 Supply & Installation of 600 x 150mm base board tiles with stainless mirror finish trim 5.40 sqm 12,991.42 4,547.00 17,538.42
Supply & Installation of 600 x 600mm Polished Porcelain Floor Tiles (LUXE LT1606P, POLISHED PORCELAIN TILE by
3.7.1.3.1 103.00 sqm 130,635.00 45,722.25 176,357.25
LIVING N' STYLE)
3.7.1.3.3 Supply & Installation of 300 x 300mm Ceramic Floor Tiles (TLC-02A and TLC-02B) 4,938.50 sqm 18,913,475.00 6,619,716.25 25,533,191.25
3.7.1.3.4 Supply & Installation of 300 x 300mm Matte Ceramic Floor Tiles (MSC MASKARA IVORY byd MARIWASA) 4.50 sqm 17,300.00 6,055.00 23,355.00
Review by:
Approved by:
Engr.Maximiniano Acosta Jr
President-SAC
December 15,2023
Dear Sir/Madam:
This is to authorize the following officers/employees of SQUARE ANGLE CONSTRUCTION to represent and bind SQUARE ANGLE CONSTRUCTION to various transactions in
relation to the execution of Subcontract Works for EMPIRE EAST HIGHLAND CITY.
Complete Name of the Authorized Position/Rank Type of Transaction(s) authorized to sign and bind the Company Specimen Signature
Representative
MAXIMINIANO ACOSTA JR MANAGER Legal Matters
Contract Documents
BEVERLY ZAULDA OFFICE ENGINEER Financial Matters
billings, statement of final account
RYAN PADILLA PROJECT MANAGER Operational Matters schedules; shop drawings; product data;
methodology; augmentation.
EHS; quality issues; overtime requests; change orders; proposals; claims
Further, we confirm that the current Project Manager/Team Leader on site shall be automatically authorized to act as the SQUARE ANGLE CONSTRUCTION’s authorized
representative in case of changes in project leadership unless EMPIRE EAST is notified otherwise in writing.
MAXIMINIANO ACOSTA JR
PRESIDENT-SAC