You are on page 1of 3

PROJECT: PEAKLAND

LOCATION: TANZA, CAVITE CITY


OWNER:
DATE: APRIL 07, 2024
SUBJECT: COST PROPOSAL FOR CONCRETE RETAINING

ITEM WORK DESCRIPTION QUANTITY AMOUNT


UM UNIT PRICE Cost /Unit Total Labor Cost

I. GENERAL REQUIREMENTS

1.0 Mobilization and Demobilization 1 lot

2.0 Temporary Facilities (Barracks & Utilities) 1 lot


Overhead Expenses, Bonds, Supervisions.
3.0 1 lot
Miscellaneous
Materials Testing Works & Commissioning
4.0 1 lot
Works (Misc)
5.0 Safety Provisions 1 lot

Survey Works & Manual Handling

SUB TOTAL (GENERAL REQUIREMENTS)

II. RETAINING WALL & FOOTING BLOCK 47 LOT 4 – 37 & BLOCK 54 LOT

1. Survey staking Lay out 1901.99 SQM

2. Clearing and Grubbing 1901.99 SQM

3. Compaction of Lot (0.6 mtrs every layer) 14,061.71 SQM

4. Excavation of Footings 786.99 CU.M


Concreting Works (inc. Weepholes & Filter),
5. 639.86 CU.M
RMC
6. Rebars Works 103,709.72 KGS

7. Formworks 5,235.91 SQM


III. Other Work to complete, Please specify

GRAND TOTAL AMOUNT

PROJECT COST SUMMARY:


GRAND TOTAL FOR GENERAL REQUIREMENTS & PRELIMINARIES (INDIRECT COST)
GRAND TOTAL FOR PROJECT MATERIAL COST (DIRECT COST)
GRAND TOTAL FOR PROJECT LABOR COST (DIRECT COST)
WITHHOLDING TAX (% of Total Project Cost)
GRAND TOTAL

Prepared by: Conformed by:

Engr. Beverly Zaulda


QS

Signature over Printed Name

Review by:

Engr. Ryan Padilla


Project Manager

Approved by:

Engr.Maximiniano Acosta Jr
President-SAC

You might also like