OWNER: DATE: APRIL 07, 2024 SUBJECT: COST PROPOSAL FOR CONCRETE RETAINING
ITEM WORK DESCRIPTION QUANTITY AMOUNT
UM UNIT PRICE Cost /Unit Total Labor Cost
I. GENERAL REQUIREMENTS
1.0 Mobilization and Demobilization 1 lot
2.0 Temporary Facilities (Barracks & Utilities) 1 lot
Overhead Expenses, Bonds, Supervisions. 3.0 1 lot Miscellaneous Materials Testing Works & Commissioning 4.0 1 lot Works (Misc) 5.0 Safety Provisions 1 lot
Survey Works & Manual Handling
SUB TOTAL (GENERAL REQUIREMENTS)
II. RETAINING WALL & FOOTING BLOCK 47 LOT 4 – 37 & BLOCK 54 LOT
1. Survey staking Lay out 1901.99 SQM
2. Clearing and Grubbing 1901.99 SQM
3. Compaction of Lot (0.6 mtrs every layer) 14,061.71 SQM
4. Excavation of Footings 786.99 CU.M
Concreting Works (inc. Weepholes & Filter), 5. 639.86 CU.M RMC 6. Rebars Works 103,709.72 KGS
7. Formworks 5,235.91 SQM
III. Other Work to complete, Please specify
GRAND TOTAL AMOUNT
PROJECT COST SUMMARY:
GRAND TOTAL FOR GENERAL REQUIREMENTS & PRELIMINARIES (INDIRECT COST) GRAND TOTAL FOR PROJECT MATERIAL COST (DIRECT COST) GRAND TOTAL FOR PROJECT LABOR COST (DIRECT COST) WITHHOLDING TAX (% of Total Project Cost) GRAND TOTAL