Professional Documents
Culture Documents
CB/19/5825 1/1
3 SECOND TO THIRD FLOOR COLUMN CONCRETE
LEVEL (+9.25 TO 12.50 SSL)
RD3 24-Mar-19 CB/19/5826 1/1 37 44.7 55.7 C 50/20
CB/19/5855 1/1
CB/19/5891 1/3
4 PT Slab Concrete For Third Floor Level +12.75
RD3 31-Mar-19 31.83 44.50 C 50/20
SSL CB/19/5891 2/3
CB/19/5943 1/3
5 Column Concrete Third to Fourth Floor (Level
RD3 2-Apr-19 38.7 43.5 C 50/20
+12.75 to +16.25m SSL) CB/19/5943 2/3
CB/19/5974 1/3
6 PT Slab Foruth Floor Concrete (Level +16.250
RD3 8-Apr-19 39.25 44.4 C 50/20
SSL) CB/19/5974 2/3
CB/19/6038 1/3
7 Column Fourth to Fifth Floor Concrete (Level
RD3 9-Apr-19 44.7 C 50/20
+16.250m to 19.75m SSL) CB/19/6038 2/3
9 PT Slab Fifth Floor Concrete (Level +19.750 SSL) RD3 15-Apr-19 CB/19/6093 1/1 35.33
CB/19/5425 1/2
2 COLUMN CONCRETE GROUND FLOOR RD3 2-Mar-19 44.5 53.7 C 50/20
CB/19/5425 2/2
5 STAIRCASE 3 & 4 GROUND FLOOR RD3 6-Mar-19 CB/19/5506 1/1 56.2 C 50/20
CB/19/5597 1/3
6 FIRST FLOOR SLAB CONCRETE - RD3 BLDG RD3 11-Mar-19 CB/19/5597 2/3 41.7 43.9 57.4 C 50/20
CB/19/5597 3/3
158 Raft Foundation Level (-4.55m) SSL. SW4 2-Jun-19 1024m3 1024m3
227 Raft Foundation Level (-4.550m) SSL. SW3 3-Jul-19 1000m3 1000m3
258 Raft Foundation Tower Crane No:4 Near SN4 SN4 Near 20-Jul-19 70m3 70m3
270 Raft Foundation Level (-4.550m) SSL. SW2 28-Jul-19 915m3 915m3
274 Raft Foundation Level (-4.550m) SSL. SW1 30-Jul-19 910m3 910m3
318 Raft Foundation Level (-4.550m) SSL RD4 1/9/2019 1218m3 1218m3
370 Raft Foundation Concrete Level -(4.55m) SSL RD1 29/9/2019 1082m 1082m
732 Raft foundation lifting tank basement Zone B 06/05/2020 32m3 32m3
1 - Dry Mix
2 RB2 Staircase 1 (4F to 5F), Staircase 2 (7F to 8F)
3 4/12/2022 RB3 Columns (7F to Roof Floor)
4 SE1 1st Floor PT slab
5 SN2 1st Floor PT slab
6 SE3 Slipform (+0.250 to 4.90)
5/12/2022
7 RB2 Columns (9F to Roof)
8 6/12/2022 SN2 Columns ( 1F to2F)
9 SE3 Shearwall (B.M to G.F)
10 Zone 1b8-A LV room and TN Room upstand
11 7/12/2022 Zone 1b8-B PCC for column footing
12 Zone 1b7 PCC for column footing
13 RB4 Slipform (+25.45 to 28.970)
14 SN2 Columns ( 1F to2F)
15 8/12/2022 RB3 Columns ( 5F to 6F)
16 Zone 1b7 PCC for column footing
17 - Dry Mix
18 RB4 Columns (4F-5F)
10/12/2022
19 RB2 Columns and shearwall (9F to Roof Floor)
20 Zone 1b8-A LV room and TN Room upstand
21 RB2 Staircase 1 (5F to6F) & staircase 2 (8F to 9F)
22 RC1 Slipform (-4.55 to -2.75)
11/12/2022
23 SE4 Slipform (-2.75 to 0.00)
24 RB2 Columns (9F to Roof)
25 RB4 Slipform (28.97 to 30.47)
12/12/2022
26 SE1 Columns (1F to 2F)
27 Zone 1b8 Column footing
13/12/2022
28 SN2 2nd floor PT Slab
29 SE1 Staircase 2 raft to midlanding 2
30 - Dry Mix
31 14/12/2022 SN2 Slipform (+15.35 to 18.85)
32 RB3 Shearwall (7F to roof)
33 RB4 Columns (4F to 5F)
34 SE1 Columns (1F to 2F)
35 RB4 Columns ( 4F to 5F)
15/12/2022
36 RB4 Staircase 1 (1F to 2F)
37 SN2 Columns (2F to 3F)
38 RB3 Roof floor PT slab
39 RB4 Staircase 2 (1F to 2F)
40 17/12/2022 SE1 Columns (1F to 2F)
41 RB4 Columns (4F to 5F)
17/12/2022
LEGEND
C50/20
C40/10
C56/20
C25/20
C25/10
Quantity
Garde
(CUM) Concrete Summary
C40/10 8 Grade Quantity (CUM)
C50/20 9 C50/20 3152
C50/20 9 C56/20 1662
C50/20 281 C40/10 31
C50/20 299 C25/20 18
C50/20 60 C25/10 8
C50/20 10 Total 4871
C50/20 16
C50/20 14
C56/20 9
C25/20 7
C25/20 7
C50/20 31
C50/20 17
C50/20 12
C25/20 4
C40/10 8
C50/20 18
C50/20 17
C56/20 12
C50/20 13
C50/20 19
C50/20 39
C50/20 10
C50/20 14
C50/20 14
C56/20 50
C50/20 269
C50/20 8
C40/10 8
C50/20 55
C50/20 8
C50/20 16
C50/20 17
C50/20 23
C50/20 6
C50/20 16
C50/20 256
C50/20 5
C50/20 10
C50/20 7
C50/20 14
C50/20 66
C50/20 14
C50/20 18
C50/20 32
C50/20 47
C50/20 11
C50/20 6
C40/10 7
C50/20 19
C50/20 12
C50/20 304
C50/20 45
C50/20 46
C50/20 271
C56/20 1556
C50/20 55
C50/20 12
C25/10 8
C50/20 20
C50/20 21
C50/20 9
C50/20 7
C50/20 160
C50/20 335
C56/20 35
C50/20 30
Concrete Summary January
Quantity
S.No Date Building Description Garde
(CUM)
69 RB4 COLUMNS (10 NOS) (5F-6F) 18
70 3/1/2023 SE4 COLUMNS (3 NOS) + SHEARWALL(1 NOS) (BM-GF) C50/20 17
71 ZONE-1B8 CLOUMNS (4NOS) (MB-GF) 4
72 SE1 2nd floor PT slab C50/20 240
4/1/2023
73 SN2 4th floor PT slab C50/20 264
74 SN2 Slipform (+22.35 to +25.85) C50/20 55
75 RB3 COLUMNS (8 NOS) + SHEARWALL(1 NOS) (ROOF-TOP ROOF) 10
5/1/2023 C50/20
76 RB2 SHEARWALL (1NOS)(ROOF-TOP ROOF) 7
77 RB4 Staircase 1 (6F to 7F) C50/20 7
78 SE2 GF floor PT slab C50/20 408
79 RC4 Slipform (-4.55M to -2.75) C50/20 16
7/1/2023
80 RC1 Slipform (-4.55M to -2.75) C50/20 30
81 Dry Mix C25/20 8
82 8/1/2023 STP Raft foundation C56/20 1286
83 SN2 CLOUMNS (11NOS) (4F-5F) C50/20 17
84 RB4 COLUMNS (16NOS) + SHEARWALL(2NOS) (5F-6F) C50/20 32
9/1/2023
85 SE1 COLUMNS (9NOS) + SHEARWALL(1NOS) (2F-3F) C50/20 24
86 RB3 CLOUMNS (11NOS) (ROOF-TOP ROOF) C50/20 8
87 SN2 Columns (4NOS)(4F to 5F) C50/20 6
88 SE1 Columns (7NOS)(2F to3F) C50/20 12
89 RB3 Staircase 2 (7F to ROOF)+SHEARWALL(1NOS)(ROOF-TOP ) C50/20 14
90 RC1 Columns(9NOS)+ shearwall (1NOS)(BM-GF) C50/20 24
91 SE2 Columns (5NOS)(GF to 1F) C50/20 10
11/1/2023
92 RB2 Staircase 2 (7F to ROOF)+SHEARWALL(1NOS)(ROOF-TOP ) C50/20 6
93 RC1 Slipform (+1.9 to 4.65) C50/20
74
94 SE4 Slipform (+5.00 to 8.5) C50/20
95 ZONE 1B-7 COLUMNS FOOTING BASEMENT AREA C56/20 15
96 ZONE 1B-7 PCC for WATER TANK C25/20 19
97 RB2 COLUMNS (7NOS) + SHEARWALL(1 NOS) (ROOF-TOP) C50/20 14
98 SN2 Columns(4 NOS) (4Fto 5F) C50/20 7
12/1/2023
99 Dry Mix C40/10 8
100 RB4 Staircase 2 (2F to 3F) C50/20 6
101 SE1 Slipform (+19.0 to 22.5) C50/20 47
102 RC1 Columns (9NOS)(BM toGF) C50/20 18
103 SE1 Columns (6NOS)(2F to 3F) C50/20 11
104 SE2 Columns (5NOS)(GF to 1F) C50/20 9
105 14/1/2023 RB4 Staircase 1 (2F to 3F) C50/20 15
106 RB4 Columns (3NOS)+shearwall(1nos)(5F to 6F) C50/20 6
107 RB2 Columns (7NOS)+shearwall(1nos)(ROOF toTOP) C50/20 7
108 Dry Mix C40/10 8
109 ZONE 1B-7 PIPE ENCHESMENT BASENENT AREA C56/20 10
110 SN2 Slipform (+25.85 to 29.37) C50/20 55
111 15/1/2023 SE1 shearwall(1nos)(2F to 3F) C50/20 9
112 RB4 Columns (1NOS)(5F to 6F) C50/20 2
113 RC1 Columns (9NOS)+shearwall(1nos)(BM to GF) C50/20
42
114 17/1/2023 SE2 Columns (8NOS)(GF toFF) C50/20
115 RC2 PCC for RAFT FOUNDATION C25/20 130
116 RA4 ROOF SCREED CONCRETE C25/10 85
117 SE2 Slipform (+12.00 to 15.50) C50/20 46
18/1/2023
118 SN2 5th floor PT slab C50/20 260
119 ZONE-1B8 STAIRECASE BM TO MIDLANDING 03 C50/20 13
120 SN2 Slipform (+29.37 to 30.87) C50/20 21
121 19/1/2023 RB3 TOP ROOF RC SLAB C50/20 25
19/1/2023
122 ZONE-1B8 PODIUM PT slab C50/20 180
123 RC1 Slipform (+4.65 to 8.150) C50/20 35
124 RB2 STAIRECASE 01 (7F-8F) C50/20 7
21/1/2023
125 RB4 6th floor PT slab C50/20 330
126 SN2 Columns (11NOS)(5F to 6F) C50/20 10
127 SE3 GROUND floor PT slab C50/20 440
128 SE2 Columns (5NOS)+shearwall(1nos)(GF toFF) C50/20 21
23/1/2023
129 RB2 STAIRECASE 02 (9F-ROOF) C50/20 7
130 SN2 Columns (11NOS)(5F to 6F) C50/20 14
131 ZONE-1B7 WATER TANK C56/20 80
132 24/1/2023 ZONE-1B7 COLUMNS FOOTING(2 NOS) C56/20 12
133 ZONE-1B7 PIPE ENCHESMENT C56/20 8
134 RC1 Columns (3NOS)+shearwall(1nos)(BM toGF) C50/20 17
135 25/1/2023 Dry Mix C40/10 10
136 SE3 Slipform (+8.4m to 11.9) C50/20 44
137 SE1 3rd floor PT Slab C50/20 246
138 28/1/2023 SE2 Shearwall GF to FF) C50/20 10
139 RB4 Staircase 1 & 2 (3F to 4F) C50/20 13
140 RC1 Columns & shearwall (BM to Gf) C50/20 15
141 RB4 Columns & shearwall (7F to 6F) C50/20 24
142 29/1/2023 Zone 1b7 Columns (BM to GF) C50/20 10
143 Zone 1B4 PCC C50/20 8
144 RB2 TOP ROOF RC SLAB C50/20 30
144 SE1 Columns 3F to 4F C50/20 12
145 SE3 Columns GF to FF C50/20 18
146 RB4 Columns & Shearwall (6F to 7F) C50/20 14
30/01/2023
147 SE1 Slipform (+22.50 to 26.00) C50/20 49
148 SN2 6th floor PT slab C50/20 262
149 SN2 Staircase 1 raft to midlanding 2 C50/20 8
150 SE1 Staircase 1 Basement to midlanding 2 C50/20 7
151 SE1 Staircase 2 Midlanding 2 to Ground Floor C50/20 6
31/01/2023
152 Zone 1B7 Columns (BM to GF) C50/20 15
153 RB4 Columns & Shearwall (6F to 7F) C50/20 19
LEGEND
C50/20
C40/10
C56/20
C25/20
C25/10
Concrete Summary February
Quantity
S.No Date Building Description Garde
(CUM)
1 SE1 COLUMNS (10NOS)+SHEARWALL(1NOS) (3F-4F) 25
2 SE3 COLUMNS (10NOS)+SHEARWALL(3NOS) (GF-FF) 30
C 50/20
3 1/2/2023 SN2 COLUMNS (8NOS) (6F-7F) 12
4 RB2 STAIRECASE 01 (8F-9F) 6
5 DRY MIX C 40/10 10
6 RC4 SLIPFORM/COREWALL LEVEL (-2.75m TO -0.200m) C 50/20 24
7 2/2/2023 ZONE-1B-4 COLUMNS FOOTING BASEMENT 35
C 56/20
8 ZONE-1B-5A P.C.C FOR COLUMNS FOOTING 7
9 SN2/SN3 SN2 (COLUMNS 11 NO 6-7 ) C 50/20 16
10 SE-3 (BUILDING SHEAR WALL) GROUND TO 1st FLOOR C 50/20 12
11 SE-3 SLIPFORM/COREWALL LEVEL (11.90m TO +15.40m) C 50/20 47
4/2/2023
12 SN-2 SN-2 STAIRCASE-02 (GROUND FLOOR TO LANDING-1) C 50/20 5
13 DRY MIX C 40/10 16
14 ZONE-1B-7 WATER TANK WALL (PART-1) B.M TO G.FLOOR C 50/20 72
15 RB4 STAIRCASE (1 & 2) (4TH FLOOR TO 5TH FLOOR) 13
16 ZONE-1B-8 STAIRCASE (MID LANDING-3 TO GROUND FLOOR) C 50/20 8
17 5/2/2023 ZONE-1B-8 POUR STRIP (GROUND FLOOR) 15
76
77
78
LEGEND
C50/20
C40/10
C56/20
C25/20
C25/10
Quantity
Grade
(CUM) Concrete Summary
C50/20 49 Grade Quantity (CUM)
280 C50/20 2302
C50/20 6 C56/20 0
10 C40/10 10
16 C25/20 25
C50/20 8 C25/10 12
26 C44/20 70
35 Total 2419
C50/20
6
C44/20 30
C40/10 10
21
14 2302
18
C50/20
17
14 s
18
C50/20 6
C25/10 12
7
C50/20 12
9
24
C50/20 20
364
C50/20 245
C50/20 26
C50/20 43
238
8
C50/20 8
11
12
46
C50/20
8
C50/20 7
C25/20 11
19
C50/20
5
241
C50/20 49
31
7
C50/20
5
7
C50/20 3
3
C44/20 40
9
18
C50/20
13
16
28
17
C50/20 21
9
48
8
C25/20
6
4
C50/20
20
C50/20 11
C50/20 11
7
C50/20
8
C50/20 20
C50/20 40
Concrete Summary APRIL
Quantity
S.No Date Building Description Grade
(CUM)
1 1/4/2023 TOWER CRANE FOUNDATION (T.C.NO 5) C56/20 77
2 1/4/2023 SN2 STAIRECASE 01 (2F TO 3F) C50/20 7
3 1/4/2023 DRY MIX C50/20 10
4 2/4/2023 SE2 3rd FLOOR P.T SLAB C50/20 254
5 2/4/2023 ZONE-1B5 COLUMN FOOTING (BASEMENT)(3 NOS) C56/20 16
6 RC2 COLUMNS (10 NOS)+SHEARWALL (1 NOS) (B.M TO G.F) 35
7 3/4/2023 SE1 SHEARWALL (1 NOS) (SF TO GF) C50/20 8
9 RB4 COLUMNS (7NOS) (ROOF TO TOP ROOF) 7
10 3/4/2023 P.C.C C25/20 10
11 4/4/2023 SE3 SLIPFORM / COREWALL LEVEL (+22.40 TO +25.90M) C50/20 49
12 6/4/2023 ZONE-1B5 COLUMN FOOTING / SUB-STATION P.C.C C25/20 26
13 8/4/2023 SE2 4th FLOOR P.T SLAB C50/20 240
14 SE3 COLUMNS (11 NOS) (3F TO 4F) 20
15 8/4/2023 ZONE-1B5 COLUMNS (3 NOS) (BM TO GF) C50/20 8
16 RC2 COLUMNS (8 NOS)+SHEARWALL (1 NOS) (B.M TO G.F) 30
17 8/4/2023 SN2 STAIRECASE 02 (3F TO 4F) C50/20 7
18 9/4/2023 SN2 STAIRECASE 01 (3F TO 4F) C50/20 7
19 10/4/2023 SE4 WATER TANK WALL (BM TO GF) C50/20 65
20 10/4/2023 ZONE-1B7 POURSTRIP (PODIUM) C50/20 14
21 ZONE-1B7 MEP FOUNDATION 8
11/4/2023 C50/20
22 RB2 SLAB ON GRADE 26
23 11/4/2023 DRY MIX C25/20 8
24 11/4/2023 ZONE-1B7 SLAB ON GRADE C44/20 25
25 SE2 COLUMNS (16 NOS) (4F TO 5F) 21
12/4/2023 C50/20
26 SE3 COLUMNS (8 NOS)+SHEARWALL (1 NOS) (3F TO 4F) 19
27 12/4/2023 SE2 SLIPFORM / COREWALL LEVEL (+26.90 TO +29.520M) C50/20 49
28 13/4/2023 RC1 1st FLOOR P.T SLAB C50/20 330
29 13/4/2023 RC2 SHEARWALL (1 NOS) (BM TO GF) C50/20 14
30 15/4/2023 ZONE-1B5 COLUMN FOOTING / SUB-STATION C56/20 90
31 SE2 COLUMNS (5 NOS)+SHEARWALL (1 NOS) (4F TO 5F)
16/4/2023 C50/20 28
32 SE3 SHEARWALL (1 NOS) (3F TO 4F)
33 16/4/2023 DRY MIX C50/20 8
34 17/4/2023 RC4 GROUND FLOOR P.T SLAB C50/20 590
35 17/4/2023 ZONE-1B5 COLUMNS (5NOS) (B.M TO G.F) C50/20 11
36 19/4/2023 SN2 STAIRECASE 1&2 (4F TO 5F) C50/20 13
37 ZONE-1B5 COLUMNS (3NOS) (B.M TO G.F) 7
38 19/4/2023 RC2 SHEARWALL (1NOS) (B.M TO G.F) C50/20 13
39 SE2 SHEARWALL (1NOS) (4F TO 5F) 10
40 24/4/2023 RB4 STAIRECASE 2 (6F TO 7F) C50/20 7
41 24/4/2023 SE1 6th FLOOR P.T SLAB C50/20 248
42 24/4/2023 ZONE-1B5 UP STAND FOR L.V ROOM C50/20 14
43 25/4/2023 SE2 SLIPFORM / COREWALL LEVEL (+29.52 TO +31.02M) C50/20 16
44 25/4/2023 SE3 4th FLOOR P.T SLAB C50/20 248
45 25/4/2023 RC1 COLUMNS (10NOS) (1FTO 2F) C50/20 16
46 25/4/2023 DRY MIX C25/20 16
47 26/4/2023 RB4 STAIRECASE 1 (6F TO 7F) C50/20 7
48 26/4/2023 RC4 SLIPFORM / COREWALL LEVEL (+8.3 TO +11.8M) C50/20 36
49 RC1 COLUMNS (10 NOS)+SHEARWALL (1 NOS) (1F TO 2F) 30
50 RC4 COLUMNS (6 NOS)+SHEARWALL (1 NOS) (GF TO 1F) 20
51 29/4/2023 SE3 COLUMNS (6 NOS) (4F TO 5F) C50/20 16
52 RB4 COLUMNS (6 NOS) (ROOF TO TOP ROOF) 6
53 SE1 COLUMNS (8 NOS) (6F TO 7F) 10
54 29/4/2023 SE4 WATER TANK WALL (BM TO GF) C50/20 26
55 30/4/2024 SE3 Slipform (+25.99 to 29.42) C50/20 46
Concrete Summary MAY
Quantity
S.No Date Building Description Grade
(CUM)
1 SN 2 STAIRCASE 02 (5F TO 6F) C50/20 6
2 1/5/2023 SE3 COLUMNS (10 NOS) + SHEARWALL (1 NOS) (4F-5F) C50/20 24
3 SE1 COLUMNS (11NOS) (6F-7F) C50/20 16
4 SE2 5th FLOOR PT SLAB C50/20 240
5 2/5/2023 RC1 COLUMNS (8 NOS) + SHEARWALL (1 NOS) (1F-2F) C50/20 29
6 RC4 COLUMNS (9 NOS) + SHEARWALL (1 NOS) (GF-1F) C50/20 32
7 3/5/2023 ZONE-1B5 PODIUM PT SLAB C50/20 540
8 SE1 COLUMNS (8 NOS) + SHEARWALL (1 NOS) (6F-7F) C50/20 22
4/5/2023
9 RB4 SHEARWALL (1 NOS) (ROOF TO TOP ROOF) C50/20 7
10 RA2 WET CONNECTION (ROOF FLOOR ) C50/20 6
11 SN2 STAIRCASE 01 (5F-6F) C50/20 7
12 SN2 STAIRCASE 02 (6F-7F) C50/20 6
13 6/5/2023 SE1 SHEARWALL (1 NOS) (6F-7F) C50/20 7
14 RC4 COLUMNS (10 NOS) + SHEARWALL (1 NOS) (GF-1F) C50/20 29
15 SE3 SLIPFORM COREWALL (+29.42 TO +30.92) C50/20 18
16 RA1 SLAB ON GRADE (GF) C44/20 63
17 SE2 COLUMNS (10NOS) (5F-6F) C50/20 16
7/5/2023
18 RC4 SLIPFORM COREWALL (+11.80 TO +15.30) C50/20 34
19 SE1 SHEARWALL (1 NOS) (6F-7F) C50/20 10
20 SE2 SHEARWALL (1 NOS) (5F-6F) C50/20 10
8/5/2023
21 RC4 COLUMNS (4 NOS) + SHEARWALL (1 NOS) (GF-1F) C50/20 20
22 RB4 SHEARWALL (ROOF TO TOP ROOF) C50/20 6
23 ZONE-1B1-A SHAFT COVER SLAB (GF) C50/20 6
24 RC1 2nd FLOOR PT SLAB C50/20 308
9/5/2023
25 ZONE 1B2-B PCC FOR COLUMN FOOTINGS C25/20 4
26 DRY MIX C50/20 16
27 SE2 COLUMNS (10 NOS) + SHEARWALL (1 NOS) (5F-6F) C50/20 26
10/5/2023
28 RC3 PCC FOR RAFT FOUNDATION C25/20 121
29 STAIRCASE 01 (6F-7F) C50/20 6
SN2
30 STAIRCASE 02 (MIDLANDING TO GF) C50/20 4
31 11/5/2023 RA2 WET CONNECTION (ROOF FLOOR) C50/20 8
32 SE3 5th FLOOR PT SLAB C50/20 250
33 ZONE -1B2-B COLUMN FOOTING C56/20 80
34 RC1 SLIPFORM COREWALL (+15.150 TO +18.650) C50/20 35
13/5/23
35 ZONE 1-1B5-B PODIUM PT SLAB C50/20 47
36 SE3 STAIRCASE 02 (MID LANDING TO GF) C50/20 7
37 14/5/23 RC1 COLUMNS (10 NOS) (2F TO 3F) C50/20 16
38 SE1 7TH FLOOR PT SLAB C50/20 250
39 SN2 STAIRCASE 02 (7F TO ROOF) C50/20 7
15/5/23
40 ZONE 1B2-B COLUMN (5 NOS) (BM TO GF) C50/20 12
41 RC1 COLUMN (10 NOS) + SHEARWALL (2 NOS) (2F TO 3F) C50/20 27
42 SE3 COLUMN (10 NOS) (5F TO 6F) C50/20 13
43 16/5/23 SE4 GROUND FLOOR PT SLAB C50/20 444
44 ZONE -1B2-B COLUMNS (7NOS) (BM TO GF) C50/20 9
45 SN2 WET CONNECTION (ROOF TO FLOOR) C50/20 8
46 STP WALL PART A (BM TO GF) C56/20 90
47 DRY MIX C40/10 16
17/5/23
48 ZONE 1B3 B PCC FOR COLUMN FOOTINGS C25/20 8
49 ZONE -1B2-B COLUMNS (BM TO GF) C50/20 8
50 RB4 STAIRCASE 01 (7F TO ROOF ) C50/20 7
51 ZONE -1B-4 POUR STRIP (GROUND FLOOR) C50/20 17
18/5/23
SE3 COLUMNS (8 NOS)(5F TO 6F) C50/20 4.5
18/5/23
43 20-Aug-2023
SE3 COLUMNS(6 NOS)+SHEARWALL(1 NOS)(ROOF- TOP FLOOR)
43 20-Aug-2023 RC1 SHEARWALL(2 NOS)(6F-7F)
SE4 STAIRCASE 1&2 (RAFT TO MIDLAND 02)
SE2 STAIRCASE 2(3F-4F)
48 21-Aug-2023 SE4 SLIPFORM COREWALL (+29.52m TO +31.020m)(7F TO ROOF)
RC3 SLIPFORM COREWALL (+4.80m TO +8.30m)(7F TO ROOF)
ZONE 1PB COLUMNS (5 NOS)(BM -GF)
49 22-Aug-2023
SN2 RC SLAB (FF CANOPY)
ZONE 1B5 GAS PIPE LINE TRENCH
SLAB ON GRADE (BM)
53 24-Aug-2023 ZONE 1B2-B
SLAB ON GRADE (BM)
RC4 4th FLOOR PT SLAB
RB2 WET CONNECTION (ROOF FLOOR)
55 26-Aug-2023 ZONE 1B8 UPSTAND FOR SHAFT NO 16&17
SE3 COLUMNS (7 NO)+ SHEARWALL(1 NO)(ROOF-TOP ROOF)
SE1 STAIRCASE 02 (2F-3F)
28-Aug-2023 ZONE 1B8 SOG CONCRETE FOR TRENCH (SUBSTATION 6)(BM)
RC4 SLIPFORM COREWALL (+25.80m-+29.32m)
29-Aug-2023
ZONE 1B8&1B5 SOG LV ROOM 6&7 (BM)
LEGEND
C50/20
C40/10
C56/20
C25/20
C25/10
Quantity
Grade
(CUM) Concrete Summary
C44/20 28 Grade Quantity (CUM)
C50/20 289 C50/20 2069
C50/20 38 C56/20 90
C44/20 40 C40/10
C25/20 4 C25/20 16
C44/20 60 C25/10
C56/20 3 C44/20 5
C56/20 3 C40/10
C50/20 49 Total 2180
C44/20 37
C50/20 15
C50/20 25
C50/20 11
C50/20 229
C50/20 82
C25/20 7
C50/20
50
C50/20
C25/20 7
C56/20
76
C56/20
C50/20 16
C56/20 24
C50/20 38
C50/20 19
C50/20 32
C50/20 5
C50/20 5
C50/20 10
C25/20 8
C50/20 15
C50/20 75
C50/20 10
C56/20 30
C44/20 22
C50/20 16
C50/20 24
C50/20 22
C56/20 4
C50/20 49
C50/20 22
C50/20 30
C50/20 7
C50/20 17
C50/20 16
C50/20 14
C50/20 7
C50/20 19
C50/20 53
C50/20 8
C50/20 14
C50/20 3
C44/20 53
C50/20 8
C50/20 330
C50/20 10
C56/20 6
C50/20 14
C50/20 6
C44/20 10
C50/20 35
C44/20 11
Slab and Raft Casting ( April 22 till 23/3/2023)
S.No Month Raft Slab
1 6
1 Apr-22
0 5
2 May-22
1 7
3 Jun-22
1 4
4 Jul-22
0 7
5 Aug-22
2 9
6 Sep-22
1 6
7 Oct-22
2 8
8 Nov-22
1 8
9 Dec-22
1 10
10 Jan-23
1 7
11 Feb-23
0 5
12 Mar-23
Total 11 82