Refer to file naming convention doc for info DATA EXCHANGE #01 DATA EXCHANGE #02 DATA EXCHANGE

CHANGE #01 DATA EXCHANGE #02 DATA EXCHANGE #03


G0 / RIBA3.1 RIBA3.2 RIBA3.2
FILE NAME WS3.2 Design Fix WS3.2 Final Design
WS3.1 Design Fix
[50% Page Turn Date - 29th Nov 2023] [90% Page Turn 17th Jan 2024]

EXCHANGE PROJECT VOLUME / ORIGINATOR


DELIVERABLE (TITLE) DESCRIPTION CONTRY CODE LEVEL FILE TYPE DISCIPLINE NUMBER DATE REQUIRED TO ISSUE SUBMISSION REVISION DATE REQUIRED TO ISSUE SUBMISSION REVISION DATE REQUIRED TO ISSUE SUBMISSION REVISION
FORMATS CODE SYSTEM CODE
CALCULATIONS
Structural

Permitting calculations as required FR MRS05 DTZZ ZZ CRT CA S 10000 9/29/2023 11/29/2023 01/17/2024

Bracing Forces calculation FR MRS05 DTZZ ZZ CRT CA S 20000 01/17/2024


Civils

Site drainage calculation FR MRS05 STEZ XX CRT CA C 95000 9/29/2023 11/29/2023 01/17/2024
Combined services
Electrical services

Generator emissions calculation FR MRS05 ZZZZ R1 CRT CA E 62000 11/29/2023 01/17/2024

Generator bulk fuel tank calculation FR MRS05 ZZZZ XX CRT CA E 62000 9/29/2023 11/29/2023 01/17/2024
Mechanical services

Room schedule with cooling loads and air flows per room FR MRS05 ZZZZ ZZ CRT CA M 50000 11/29/2023 01/17/2024

Water storage tank sizing FR MRS05 DTZZ XX CRT CA J 53000 11/29/2023 01/17/2024
DRAWINGS (CUT FROM MODEL)
Structural

Outline of Draft Structural Design FR MRS04 DTZZ ZZ CRT DR S 20000 9/29/2023 11/29/2023 01/17/2024

General Arrangement Pile Layout FR MRS05 DTZZ XX CRT DR S 10000 11/29/2023 01/17/2024

Superstructure Steel Column Refs FR MRS05 DTZZ ZZ CRT DR S 20001 11/29/2023 01/17/2024

Superstructure Steelwork Beam Refs FR MRS05 DTZZ ZZ CRT DR S 20002 11/29/2023 01/17/2024
Structural Elevations 1 FR MRS05 DTZZ ZZ CRT DR S 20003 11/29/2023 01/17/2024
Structural Elevations 2 FR MRS05 DTZZ ZZ CRT DR S 20004 11/29/2023 01/17/2024

Structural Sections
General Arrangement Superstructure Concrete 1 FR MRS05 ZZZZ L0 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 2 FR MRS05 ZZZZ L1 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 3 FR MRS05 ZZZZ L2 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 4 FR MRS05 ZZZZ R1 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 5 FR MRS05 ZZZZ R2 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 6 FR MRS05 PBBZ L0 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 7 FR MRS05 PBBZ L1 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 8 FR MRS05 PBBZ L2 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 9 FR MRS05 PBBZ L3 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 10 FR MRS05 PBBZ L4 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Concrete 11 FR MRS05 PBBZ R1 CRT DR S 20000 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 1 FR MRS05 ZZZZ L0 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 2 FR MRS05 ZZZZ L1 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 3 FR MRS05 ZZZZ L2 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 4 FR MRS05 ZZZZ R1 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 5 FR MRS05 ZZZZ R2 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 6 FR MRS05 PBBZ L0 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 7 FR MRS05 PBBZ L1 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 8 FR MRS05 PBBZ L2 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 9 FR MRS05 PBBZ L3 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 10 FR MRS05 PBBZ L4 CRT DR S 20001 11/29/2023 01/17/2024
General Arrangement Superstructure Steelwork 11 FR MRS05 PBBZ R1 CRT DR S 20001 11/29/2023 01/17/2024

Roof exit out of riser


Loading Plans 1 FR MRS05 ZZZZ L0 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 2 FR MRS05 ZZZZ L1 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 3 FR MRS05 ZZZZ L2 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 4 FR MRS05 ZZZZ R1 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 5 FR MRS05 ZZZZ R2 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 6 FR MRS05 PBBZ L0 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 7 FR MRS05 PBBZ L1 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 8 FR MRS05 PBBZ L2 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 9 FR MRS05 PBBZ L3 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 10 FR MRS05 PBBZ L4 CRT DR S 20002 11/29/2023 01/17/2024
Loading Plans 11 FR MRS05 PBBZ R1 CRT DR S 20002 11/29/2023 01/17/2024
Civils

Existing Services Layout 1 FR MRS05 STEZ XX CRT DR C 95000 9/29/2023 11/29/2023 01/17/2024
Existing Services Layout 2 FR MRS05 STEZ XX CRT DR C 95001 9/29/2023 11/29/2023 01/17/2024
Existing Services Layout 3 FR MRS05 STEZ XX CRT DR C 95002 9/29/2023 11/29/2023 01/17/2024
Combined Services Layout FR MRS05 STEZ XX CRT DR C 95003 9/29/2023 11/29/2023 01/17/2024

OM Site Plan
Water Network Layout FR MRS05 STEZ XX CRT DR C 95004 9/29/2023 11/29/2023 01/17/2024

Incoming Mains Water


Telecommunications Ducting Layout FR MRS05 STEZ XX CRT DR C 95005 9/29/2023 11/29/2023 01/17/2024

HV Electrical Layout FR MRS05 STEZ XX CRT DR C 95006 9/29/2023 11/29/2023 01/17/2024

LV Electrical and Security Ducting Layout FR MRS05 STEZ XX CRT DR C 95007 9/29/2023 11/29/2023 01/17/2024

Drainage Systems Layout FR MRS05 STEZ XX CRT DR C 95008 9/29/2023 11/29/2023 01/17/2024

Combined Services Cross Sections FR MRS05 STEZ XX CRT DR C 95009 9/29/2023 11/29/2023 01/17/2024

Fire water network layout FR MRS05 STEZ XX CRT DR C 95010 9/29/2023 11/29/2023 01/17/2024

Utilities Standard Details FR MRS05 STEZ XX CRT DR C 95011 9/29/2023 11/29/2023 01/17/2024

Proposed Drainage Standard Details


Manhole standard details
Pavement & Kerbs Layout FR MRS05 STEZ XX CRT DR C 95012 9/29/2023 11/29/2023 01/17/2024

Pavement & Kerbs Details FR MRS05 STEZ XX CRT DR C 95013 9/29/2023 11/29/2023 01/17/2024

Proposed Surface Water Longsection FR MRS05 STEZ XX CRT DR C 95014 11/29/2023 01/17/2024

Proposed Foul Water Longsection FR MRS05 STEZ XX CRT DR C 95015 11/29/2023 01/17/2024

Proposed Roof Water Longsection FR MRS05 STEZ XX CRT DR C 95016 11/29/2023 01/17/2024

Proposed Comms Ducting Longsection FR MRS05 STEZ XX CRT DR C 95017 11/29/2023 01/17/2024

Drainage Systems Layout Sheet FR MRS05 STEZ XX CRT DR C 95018 11/29/2023 01/17/2024
Combined Services

Cooling corridor coordination mech FR MRS05 ZZZZ ZZ CRT DR J 09000 11/29/2023 01/17/2024

Central corridor coordination FR MRS05 ZZZZ ZZ CRT DR J 09001 11/29/2023 01/17/2024

UPS/Battery room coordination FR MRS05 ZZZZ ZZ CRT DR J 09002 11/29/2023 01/17/2024

Generator & Flue Coordination mech FR MRS05 ZZZZ R1 CRT DR J 09000 11/29/2023 01/17/2024

Under Slab Services FR MRS05 DTZZ XX CRT DR J 09000 01/17/2024


Plant Maintenance and Replacement Strategy 1 FR MRS05 ZZZZ ZZ CRT DR J 09003 9/29/2023 11/29/2023 01/17/2024
Plant Maintenance and Replacement Strategy 2 mech FR MRS05 ZZZZ R1 CRT DR J 09001 11/29/2023 01/17/2024
Equipment Layouts Combined Services 1 FR MRS05 ZZZZ L0 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 2 FR MRS05 ZZZZ L1 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 3 FR MRS05 ZZZZ L2 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 4 FR MRS05 ZZZZ R1 CRT DR J 09002 11/29/2023 01/17/2024
Equipment Layouts Combined Services 5 FR MRS05 ZZZZ R2 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 6 FR MRS05 PBBZ L0 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 7 FR MRS05 PBBZ L1 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 8 FR MRS05 PBBZ L2 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 9 FR MRS05 PBBZ L3 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 10 FR MRS05 PBBZ L4 CRT DR J 09000 11/29/2023 01/17/2024
Equipment Layouts Combined Services 11 FR MRS05 PBBZ R1 CRT DR J 09000 11/29/2023 01/17/2024

OM CAD File
Critical Cut-Sections as appropriate 1 FR 11/29/2023 01/17/2024
1 section for cooling corridor, 2 sections forMRS05
Roof ZZZZ ZZ CRT DR J 09004
Critical Cut-Sections as appropriate 2 11/29/2023 01/17/2024
equipments to be done by mech;FRmake sure MRS05
to show ZZZZ ZZ CRT DR J 09005
Critical Cut-Sections as appropriate 3 11/29/2023 01/17/2024
cable tray in cooling corridor andFRgeneratorMRS05
on roof ZZZZ ZZ CRT DR J 09006
Critical Cut-Sections as appropriate 4 FR MRS05 ZZZZ ZZ CRT DR J 09007 11/29/2023 01/17/2024
Critical Cut-Sections as appropriate 5 FR MRS05 ZZZZ ZZ CRT DR J 09008 11/29/2023 01/17/2024
Critical Cut-Sections as appropriate 6 2 sections for main corridor, 2 sections
FR
for elec
MRS05
room, 1ZZZZ ZZ CRT DR J 09009 11/29/2023 01/17/2024
Critical Cut-Sections as appropriate 7 section for HV room at L0 FR MRS05 ZZZZ ZZ CRT DR J 09010 11/29/2023 01/17/2024
Critical Cut-Sections as appropriate 8 FR MRS05 ZZZZ ZZ CRT DR J 09011 11/29/2023 01/17/2024
Electrical Services

Building/Block HV Overview FR MRS05 DTZZ ZZ CRT DR E 62000 9/29/2023 11/29/2023 01/17/2024

Generator Ring FR MRS05 ZZZZ ZZ CRT DR E 62000 9/29/2023 11/29/2023 01/17/2024

Transformer Ring FR MRS05 ZZZZ ZZ CRT DR E 62001 9/29/2023 11/29/2023 01/17/2024

Schematic for each LV string FR MRS05 ZZZZ ZZ CRT DR E 62002 11/29/2023 01/17/2024

Power supply overview schematic


Mechanical DB FR MRS05 ZZZZ ZZ CRT DR E 62003 01/17/2024

PBB/Auxiliary supply/other FR MRS05 PBBZ ZZ CRT DR E 62000 01/17/2024

Bonding + Earthing Schematic FR MRS05 DTZZ ZZ CRT DR E 65000 9/29/2023 11/29/2023 01/17/2024

Earthing and Lightning Protection


SCADA Network FR MRS05 ZZZZ ZZ CRT DR E 64000 01/17/2024
Containment Distribution 1 FR MRS05 ZZZZ L0 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 2 FR MRS05 ZZZZ L1 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 3 FR MRS05 ZZZZ L2 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 4 FR MRS05 ZZZZ R1 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 5 FR MRS05 ZZZZ R2 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 6 FR MRS05 PBBZ L0 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 7 FR MRS05 PBBZ L1 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 8 FR MRS05 PBBZ L2 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 9 FR MRS05 PBBZ L3 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 10 FR MRS05 PBBZ L4 CRT DR E 61000 11/29/2023 01/17/2024
Containment Distribution 11 FR MRS05 PBBZ R1 CRT DR E 61000 11/29/2023 01/17/2024
Busbar layout 1 FR MRS05 ZZZZ L0 CRT DR E 61001 11/29/2023 01/17/2024
Busbar layout 2 FR MRS05 ZZZZ L1 CRT DR E 61001 11/29/2023 01/17/2024
Busbar layout 3 FR MRS05 ZZZZ L2 CRT DR E 61001 11/29/2023 01/17/2024
Busbar layout 4 FR MRS05 ZZZZ R1 CRT DR E 61001 11/29/2023 01/17/2024
Busbar layout 5 FR MRS05 ZZZZ R2 CRT DR E 61001 11/29/2023 01/17/2024
Small Power and Lighting 1 FR MRS05 ZZZZ L0 CRT DR E 62000 01/17/2024
Small Power and Lighting 2 FR MRS05 ZZZZ L1 CRT DR E 62000 01/17/2024
Small Power and Lighting 3 FR MRS05 ZZZZ L2 CRT DR E 62000 01/17/2024
Small Power and Lighting 4 FR MRS05 ZZZZ R1 CRT DR E 62000 01/17/2024
Small Power and Lighting 5 FR MRS05 ZZZZ R2 CRT DR E 62000 01/17/2024
Small Power and Lighting 6 FR MRS05 PBBZ L0 CRT DR E 62000 01/17/2024
Small Power and Lighting 7 FR MRS05 PBBZ L1 CRT DR E 62000 01/17/2024
Small Power and Lighting 8 FR MRS05 PBBZ L2 CRT DR E 62000 01/17/2024
Small Power and Lighting 9 FR MRS05 PBBZ L3 CRT DR E 62000 01/17/2024
Small Power and Lighting 10 FR MRS05 PBBZ L4 CRT DR E 62000 01/17/2024
Small Power and Lighting 11 FR MRS05 PBBZ R1 CRT DR E 62000 01/17/2024

Lighting
Fiber ducting/Telecomunication 1 FR MRS05 ZZZZ L0 CRT DR E 64000 11/29/2023 01/17/2024
Fiber ducting/Telecomunication 2 FR MRS05 ZZZZ L1 CRT DR E 64000 11/29/2023 01/17/2024
Fiber ducting/Telecomunication 3 FR MRS05 ZZZZ L2 CRT DR E 64000 11/29/2023 01/17/2024
Fiber ducting/Telecomunication 4 FR MRS05 ZZZZ R1 CRT DR E 64000 11/29/2023 01/17/2024
Fiber ducting/Telecomunication 5 FR MRS05 ZZZZ R2 CRT DR E 64000 11/29/2023 01/17/2024
Equipment Layouts Electrical 1 FR MRS05 ZZZZ L0 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 2 FR MRS05 ZZZZ L1 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 3 FR MRS05 ZZZZ L2 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 4 FR MRS05 ZZZZ R1 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 5 FR MRS05 ZZZZ R2 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 6 FR MRS05 PBBZ L0 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 7 FR MRS05 PBBZ L1 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 8 FR MRS05 PBBZ L2 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 9 FR MRS05 PBBZ L3 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 10 FR MRS05 PBBZ L4 CRT DR E 62001 11/29/2023 01/17/2024
Equipment Layouts Electrical 11 FR MRS05 PBBZ R1 CRT DR E 62001 11/29/2023 01/17/2024

Generator layout FR MRS05 ZZZZ R1 CRT DR E 62002 11/29/2023 01/17/2024


Fire Detection and Alarm 1 FR MRS05 ZZZZ L0 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 2 FR MRS05 ZZZZ L1 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 3 FR MRS05 ZZZZ L2 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 4 FR MRS05 ZZZZ R1 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 5 FR MRS05 ZZZZ R2 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 6 FR MRS05 PBBZ L0 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 7 FR MRS05 PBBZ L1 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 8 FR MRS05 PBBZ L2 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 9 FR MRS05 PBBZ L3 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 10 FR MRS05 PBBZ L4 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024
Fire Detection and Alarm 11 FR MRS05 PBBZ R1 CRT DR E 69000 9/29/2023 11/29/2023 01/17/2024

Fire Detection and Alarm Zoning Plans


Mechanical Services

Fire Suppression Layout 1 FR MRS05 ZZZZ L0 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Fire Suppression Layout 2 FR MRS05 ZZZZ L1 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Fire Suppression Layout 3 FR MRS05 ZZZZ L2 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Fire Suppression Layout 4 FR MRS05 ZZZZ R1 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Fire Suppression Layout 5 FR MRS05 ZZZZ R2 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 1 FR MRS05 ZZZZ L0 CRT DR M 58001 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 2 FR MRS05 ZZZZ L1 CRT DR M 58001 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 3 FR MRS05 ZZZZ L2 CRT DR M 58001 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 4 FR MRS05 ZZZZ R1 CRT DR M 58001 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 5 FR MRS05 ZZZZ R2 CRT DR M 58001 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 6 FR MRS05 PBBZ L0 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 7 FR MRS05 PBBZ L1 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 8 FR MRS05 PBBZ L2 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 9 FR MRS05 PBBZ L3 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 10 FR MRS05 PBBZ L4 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024
Smoke Management Layout 11 FR MRS05 PBBZ R1 CRT DR M 58000 9/29/2023 11/29/2023 01/17/2024

Fire suppression zoning plan


Fire suppression equipment Layout
Cooling system Chilled water & Refrigerent layout 1 FR MRS05 ZZZZ L0 CRT DR M 55000 9/29/2023 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 2 FR MRS05 ZZZZ L1 CRT DR M 55000 9/29/2023 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 3 FR MRS05 ZZZZ L2 CRT DR M 55000 9/29/2023 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 4 FR MRS05 ZZZZ R1 CRT DR M 55000 9/29/2023 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 5 FR MRS05 ZZZZ R2 CRT DR M 55000 9/29/2023 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 6 FR MRS05 PBBZ L0 CRT DR M 55000 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 7 FR MRS05 PBBZ L1 CRT DR M 55000 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 8 FR MRS05 PBBZ L2 CRT DR M 55000 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 9 FR MRS05 PBBZ L3 CRT DR M 55000 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 10 FR MRS05 PBBZ L4 CRT DR M 55000 11/29/2023 01/17/2024
Cooling system Chilled water & Refrigerent layout 11 FR MRS05 PBBZ R1 CRT DR M 55000 11/29/2023 01/17/2024

Plantroom & Ancillary Cooling


Office Areas Cooling FR MRS05 PBBZ ZZ CRT DR M 55000 9/29/2023 11/29/2023 01/17/2024

Other Areas (POP / IDF / Corridor etc) Cooling FR MRS05 ZZZZ ZZ CRT DR M 55000 9/29/2023 11/29/2023 01/17/2024

Heating (if applicable)


CHW ancillary plant FR MRS05 ZZZZ R2 CRT DR M 55001 9/29/2023 11/29/2023 01/17/2024
Cooling system Chiled water & Refrigerent Schematics 1 FR MRS05 ZZZZ ZZ CRT DR M 50000 9/29/2023 11/29/2023 01/17/2024
Cooling system Chiled water & Refrigerent Schematics 2 FR MRS05 PBBZ ZZ CRT DR M 50000 9/29/2023 11/29/2023 01/17/2024
Cooling system Air Distribution layout 1 FR MRS05 ZZZZ L0 CRT DR M 57000 9/29/2023 11/29/2023 01/17/2024
Cooling system Air Distribution layout 2 FR MRS05 ZZZZ L1 CRT DR M 57000 9/29/2023 11/29/2023 01/17/2024
Cooling system Air Distribution layout 3 FR MRS05 ZZZZ L2 CRT DR M 57000 9/29/2023 11/29/2023 01/17/2024
Cooling system Air Distribution layout 4 FR MRS05 ZZZZ R1 CRT DR M 57000 9/29/2023 11/29/2023 01/17/2024
Cooling system Air Distribution layout 5 FR MRS05 ZZZZ R2 CRT DR M 57000 9/29/2023 11/29/2023 01/17/2024
Cooling system Air Distribution layout 6 FR MRS05 PBBZ L0 CRT DR M 57000 11/29/2023 01/17/2024
Cooling system Air Distribution layout 7 FR MRS05 PBBZ L1 CRT DR M 57000 11/29/2023 01/17/2024
Cooling system Air Distribution layout 8 FR MRS05 PBBZ L2 CRT DR M 57000 11/29/2023 01/17/2024
Cooling system Air Distribution layout 9 FR MRS05 PBBZ L3 CRT DR M 57000 11/29/2023 01/17/2024
Cooling system Air Distribution layout 10 FR MRS05 PBBZ L4 CRT DR M 57000 11/29/2023 01/17/2024
Cooling system Air Distribution layout 11 FR MRS05 PBBZ R1 CRT DR M 57000 11/29/2023 01/17/2024

Data Hall and offices Ventilation


Office Areas Ventilation
Ventilation schematic FR MRS05 DTZZ ZZ CRT DR M 57000 9/29/2023 11/29/2023 01/17/2024

Humidification Water (RO) Schematic


Plant room & Ancillary Ventilation
Other Areas (POP / IDF / Corridor etc) Ventilation
Firefighting layout 1 FR MRS05 ZZZZ L0 CRT DR M 58002 11/29/2023 01/17/2024
Firefighting layout 2 FR MRS05 ZZZZ L1 CRT DR M 58002 11/29/2023 01/17/2024
Firefighting layout 3 FR MRS05 ZZZZ L2 CRT DR M 58002 11/29/2023 01/17/2024
Firefighting layout 4 FR MRS05 ZZZZ R1 CRT DR M 58002 11/29/2023 01/17/2024
Firefighting layout 5 FR MRS05 ZZZZ R2 CRT DR M 58002 11/29/2023 01/17/2024
Firefighting layout 6 FR MRS05 PBBZ L0 CRT DR M 58001 11/29/2023 01/17/2024
Firefighting layout 7 FR MRS05 PBBZ L1 CRT DR M 58001 11/29/2023 01/17/2024
Firefighting layout 8 FR MRS05 PBBZ L2 CRT DR M 58001 11/29/2023 01/17/2024
Firefighting layout 9 FR MRS05 PBBZ L3 CRT DR M 58001 11/29/2023 01/17/2024
Firefighting layout 10 FR MRS05 PBBZ L4 CRT DR M 58001 11/29/2023 01/17/2024
Firefighting layout 11 FR MRS05 PBBZ R1 CRT DR M 58001 11/29/2023 01/17/2024

Firefighting schematic FR MRS05 DTZZ ZZ CRT DR M 58000 11/29/2023 01/17/2024

Water Mist Suppression Schematic


Fuel Distribution, Site Wide FR MRS05 ZZZZ ZZ CRT DR M 59000 9/29/2023 11/29/2023 01/17/2024
Fuel distribution layout 1 FR MRS05 ZZZZ L0 CRT DR M 59000 11/29/2023 01/17/2024
Fuel distribution layout 2 FR MRS05 ZZZZ R1 CRT DR M 59000 11/29/2023 01/17/2024
Public Health

Water Services Layout 1 FR MRS05 ZZZZ L0 CRT DR P 53000 11/29/2023 01/17/2024


Water Services Layout 2 FR MRS05 ZZZZ L1 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 3 FR MRS05 ZZZZ L2 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 4 FR MRS05 ZZZZ R1 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 5 FR MRS05 ZZZZ R2 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 6 FR MRS05 PBBZ L0 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 7 FR MRS05 PBBZ L1 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 8 FR MRS05 PBBZ L2 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 9 FR MRS05 PBBZ L3 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 10 FR MRS05 PBBZ L4 CRT DR P 53000 11/29/2023 01/17/2024
Water Services Layout 11 FR MRS05 PBBZ R1 CRT DR P 53000 11/29/2023 01/17/2024

Domestic Water Services FR MRS05 DTZZ ZZ CRT DR P 53000 11/29/2023 01/17/2024

Plumbing/Drainage FR MRS05 DTZZ ZZ CRT DR P 52000 11/29/2023 01/17/2024

Under Slab Drainage


REPORTS
Structural

Overall Structural Details FR MRS05 DTZZ ZZ CRT RP S 20000 01/17/2024

Details Pile Caps


Details Superstructure Concrete
Details Superstructure Steelwork
Details Pile Caps RC Intent
Details Ground Beams RC Intent
Ground Floor RC Intent Details
Combined Services

Overall schedule report FR MRS05 DTZZ ZZ CRT RP J 09000 01/17/2024

Schedules Piling
Schedules Steel Member Forces
External equipment and pump schedules
Proposed Drainage Schedules
Manhole schedule
Critical equipment schedule
Fire Suppression Equipment Schedule
Electrical Equipment Schedule
Luminaire Schedule
Distribution Board Schedule
Busbar Schedule
Low Voltage Cable Schedules
High Voltage Cable Schedules
Equipment Schedule
Mechanical Equipment Schedule
Pump Schedule
Concept Report - Basis of Design FR MRS05 DTZZ ZZ CRT RP J 09001 01/17/2024

OFCI Interface Matrix FR MRS05 DTZZ XX CRT RP J 09000 01/17/2024

Outline Scope of Works FR MRS05 STEZ ZZ CRT RP J 09000 01/17/2024

Acoustic Study FR MRS05 ZZZZ R1 CRT RP J 87000 11/29/2023 01/17/2024

Fire Systems - Cause and Effect Matrix FR MRS05 DTZZ ZZ CRT RP J 08000 01/17/2024

Fluid delivery time calculation report FR MRS05 DTZZ ZZ CRT RP J 59000 01/17/2024

Capacity planner FR MRS05 DTZZ ZZ CRT RP J 62000 9/29/2023 11/29/2023 01/17/2024

Cooling load calculation


PUE Calculation
Electrical Services

HV Protection Strategy FR MRS05 ZZZZ ZZ CRT RP E 62000 01/17/2024

Load Flow Study


HV Controls
Earthing Design & Analysis FR MRS05 DTZZ ZZ CRT RP E 65000 01/17/2024
Mechanical Services

Statutory energy calculations as required FR MRS05 PBBZ ZZ CRT RP M 50000 9/29/2023 11/29/2023 01/17/2024

External CFD Calculation FR MRS05 ZZZZ R1 CRT RP M 50000 9/29/2023 11/29/2023 01/17/2024

Internal CFD Calculation (if required) FR MRS05 ZZZZ ZZ CRT RP M 50000 9/29/2023 11/29/2023 01/17/2024

Cooling system - modes of operation FR MRS05 ZZZZ ZZ CRT RP M 55000 11/29/2023 01/17/2024

Mechanical Systems Outline Description of Operations


SPECIFICATIONS
Structural

General Structural Specification FR MRS05 DTZZ ZZ CRT SP S 20000 01/17/2024

Concrete Specification
Steel Specification
Piling Specification
Ground Floor Reinforcement Intent
MEP

Availability Study FR MRS05 ZZZZ ZZ CRT SP J 09000 01/17/2024

Under Slab Services - Particular Specification FR MRS05 DTZZ XX CRT SP J 09000 01/17/2024
Electrical

HV and Generator Control Strategy FR MRS05 ZZZZ ZZ CRT SP E 62000 01/17/2024

Switching Matrix FR MRS05 ZZZZ ZZ CRT SP E 62001 01/17/2024


Mechanical

Fire Suppression Specification FR MRS05 DTZZ ZZ CRT SP M 59000 01/17/2024

Particular Specification / Equipment Data Sheets FR MRS05 ZZZZ ZZ CRT SP M 50000 01/17/2024
MODELS

Structural Model - Revit FR MRS05 DTZZ ZZ CRT M3 S 20000 11/29/2023 01/17/2024

Structural Model - NWC FR MRS05 DTZZ ZZ CRT M3 S 20001 11/29/2023 01/17/2024

Structural Model - IFC FR MRS05 DTZZ ZZ CRT M3 S 20002 11/29/2023 01/17/2024

Civils Model - Revit FR MRS05 STEZ XX CRT M3 C 95000 11/29/2023 01/17/2024


MEP 3D Revit Model [Note 1,2] 1 FR MRS05 DTZZ ZZ CRT M3 E 09000 11/29/2023 01/17/2024
MEP 3D Revit Model [Note 1,2] 2 FR MRS05 DTZZ ZZ CRT M3 M 09000 11/29/2023 01/17/2024
MEP 3D Revit Model - NWC FILE [Note 1,2] 1 FR MRS05 DTZZ ZZ CRT M3 E 09001 11/29/2023 01/17/2024
MEP 3D Revit Model - NWC FILE [Note 1,2] 2 FR MRS05 DTZZ ZZ CRT M3 M 09001 11/29/2023 01/17/2024
MEP 3D Revit Model - IFCFILE [Note 1,2] 1 FR MRS05 DTZZ ZZ CRT M3 E 09002 11/29/2023 01/17/2024
MEP 3D Revit Model - IFCFILE [Note 1,2] 2 FR MRS05 DTZZ ZZ CRT M3 M 09002 11/29/2023 01/17/2024