You are on page 1of 8

Monthly Reporting: Ref: (1.

1)

(1.1) 330kV Lines Forced Outages (Forced Trippings) Form: LFO-1


Region: Shiroro Month: MARCH, 2023 Prepared by M & E Division

Total Relay Outage Last Load Energy


Out- Sub-regions / Trx Lines Voltage Trippings Cause of the duration Recorded Loss
ages in
S/N a S/S Date Work Centres Substations Nomenclature Level Indication Outage Time out Time in (hrs) (MW) (MWhr) Remarks
Ref (No.) (kV) (hrs) (MW) (MWhr)
(i)

330kV Lines Outages of 666193381.xlsx 1 of 8 05:39:14 on 05/19/2023


Monthly Reporting: Ref: (1.2)

(1.2) 132kV Lines Forced Outages (Forced Trippings) Form: LFO-2

Region: Shiroro Month: MARCH, 2023 Prepared by M & E Division

Total Outage Last Load Energy


Out- Sub-regions / Trx Lines Voltage Relay Trippings Cause of the Time duration Recorded Loss
ages in a
S/N S/S Date Work Centres Substations Nomenclature Level Indication Outage out Time in (hrs) (MW) (MWhr) Remarks

Ref (No.) (kV) (hrs) (MW) (MWhr)


(i)

132kV Lines Outages of 666193381.xlsx 2 0f 8 05:39:14 on 05/19/2023


Monthly Reporting: Ref: (1.3)

(1.3) 33kV Lines Forced Outages (Forced Trippings) Form: LFO-3

Region: Shiroro Month: MARCH, 2023 Prepared by M & E Division

Relay Outage Last Load Energy


Total Out- Sub-regions / Trx Lines Voltage Trippings Cause of the duration Recorded Loss
ages in a
S/N S/S Date Work Centres Substations Nomenclature Level Indication Outage Time out Time in (hrs) (MW) (MWhr)

Ref (No.) (kV) (hrs) (MW) (MWhr)


(i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii) (xiii) (xiv)

1 1/3/2023 KAINJI DOGONGARI FEEDER 5 33KV E/F NYK 20:04 22:33 2.48 0.02 0.05

2 1/3/2023 KAINJI DOGONGARI FEEDER 6 33KV E/F NYK 20:16 22:25 2.15 1.24 2.67

3 2/3/2023 KAINJI DOGONGARI FEEDER 5 33KV E/F NYK 0:01 12:51 12.88 0.02 0.26

4 3/3/2023 KAINJI DOGONGARI FEEDER 5 33KV E/F NYK 11:02 20:30 9.47 0.02 0.19

5 3/3/2023 KAINJI DOGONGARI FEEDER 6 33KV E/F NYK 13:36 14:25 0.82 3.69 3.03

6 4/3/2023 KAINJI DOGONGARI FEEDER 5 33KV O/C NYK 9:03 13:38 4.58 0.02 0.09

7 4/3/2023 KAINJI DOGONGARI FEEDER 5 33KV O/C NYK 16:25 20:54 4.48 0.02 0.09

8 8/3/2023 KAINJI DOGONGARI FEEDER 5 33KV O/C NYK 11:22 12:08 0.77 0.02 0.02

9 9/3/2023 KAINJI DOGONGARI FEEDER 5 33KV O/C NYK 7:56 8:10 0.23 0.02 0.01

10 11/3/2023 KAINJI DOGONGARI FEEDER 6 33KV O/C NYK 14:35 15:03 0.47 3.68 1.73

11 12/3/2023 KAINJI DOGONGARI FEEDER 6 33KV E/F NYK 0:28 7:18 6.83 2.74 18.71

12 12/3/2023 KAINJI DOGONGARI FEEDER 6 33KV E/F NYK 13:48 14:17 0.48 3.61 1.73

13 12/3/2023 KAINJI DOGONGARI FEEDER 6 33KV O/C NYK 16:49 17:04 0.25 4.02 1.01

14 14/3/2023 KAINJI DOGONGARI FEEDER 6 33KV O/C NYK 8:58 9:28 0.5 3.4 1.7

15 17/3/2023 KAINJI DOGONGARI FEEDER 5 33KV O/C NYK 10:30 17:00 6.5 0.02 0.13

16 19/3/2023 KAINJI DOGONGARI FEEDER 6 33KV O/C NYK 0:15 0:58 0.72 1.7 1.22

17 19/3/2023 KAINJI DOGONGARI FEEDER 6 33KV O/C NYK 1:10 4:02 2.87 0.77 2.21

18 19/3/2023 KAINJI DOGONGARI FEEDER 6 33KV E/F NYK 17:12 1.6

19 19/3/2023 KAINJI DOGONGARI FEEDER 5 33KV E/F NYK 17:11 13:40 of 20/03 20.48 0.01 0.2

20 20/3/2023 KAINJI DOGONGARI FEEDERR 6 33KV E/F NYK 0:19 13:40 13.35 0.77 10.28

21 22/3/2023 KAINJI DOGONGARI FEEDERR 5 33KV E/F NYK 14:25 17:12 2.78 0.02 0.06

22 22/3/2023 KAINJI DOGONGARI FEEDERR 6 33KV E/F NYK 14:43 17:09 2.43 3.62 8.80

33kV Lines Outages of 666193381.xlsx 3 of 8 05:39:14 on 05/19/2023


Region: Shiroro Month: MARCH, 2023 Prepared by M & E Division

Relay Outage Last Load Energy


Total Out- Sub-regions / Trx Lines Voltage Trippings Cause of the duration Recorded Loss
ages in a
S/N S/S Date Work Centres Substations Nomenclature Level Indication Outage Time out Time in (hrs) (MW) (MWhr)
23 23/3/2023 KAINJI DOGONGARI FEEDERR 5 33KV O/C NYK 16:33 20:13 3.67 0.02 0.07

24 24/3/2023 KAINJI DOGONGARI FEEDER 5 33KV E/F NYK 12:41 15:38 2.95 0.02 0.06

25 26/3/2023 KAINJI DOGONGARI FEEDERR 6 33KV E/F NYK 1:38 5:32 3.9 2.53 9.87

26 26/3/2023 KAINJI DOGONGARI FEEDERR 6 33KV E/F NYK 19:31 20:45 1.23 4.25 5.23

27 31/3/2023 KAINJI DOGONGARI FEEDER 6 33KV E/F NYK 15:08 17:23 2.25 4.15 9.34

28

29

30 Sub-head Total 109.52 78.76

31

32

33

34

35

36

37

39

40

41

33kV Lines Outages of 666193381.xlsx 4 of 8 05:39:14 on 05/19/2023


Region: Shiroro Month: MARCH, 2023 Prepared by M & E Division

Relay Outage Last Load Energy


Total Out- Sub-regions / Trx Lines Voltage Trippings Cause of the duration Recorded Loss
ages in a
S/N S/S Date Work Centres Substations Nomenclature Level Indication Outage Time out Time in (hrs) (MW) (MWhr)

33kV Lines Outages of 666193381.xlsx 5 of 8 05:39:14 on 05/19/2023


: (1.3)

m: LFO-3

red by M & E Division

Remarks

(xv)

33kV Lines Outages of 666193381.xlsx 6 of 8 05:39:14 on 05/19/2023


red by M & E Division

Remarks

33kV Lines Outages of 666193381.xlsx 7 of 8 05:39:14 on 05/19/2023


red by M & E Division

Remarks

33kV Lines Outages of 666193381.xlsx 8 of 8 05:39:14 on 05/19/2023