Professional Documents
Culture Documents
Roll Marks out of 10 or 25 per Experiment Total out of 300 Out of 25 Student
Enrollment No. Exam Seat No. Name of Student Sign
No 1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5
1 1800780321 Aher Shubham Ratnakar
Roll Marks out of 10 or 25 per Experiment Total out of 300 Out of 25 Student
Enrollment No. Exam Seat No. Name of Student Sign
No 1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5
22 1800780380 Khairnar Sonal Tushar
Note -: 1) While allotting the marks to the performed experiment/Assignment each PrO is to be accessed based on following criteria: a. Use of appropriate tool to solve the problem (1Mark)
b. Operate Equipment Skillfully (3Marks) c. Follow safety measures (1Mark) d. Quality of output achieved (3 Marks) e. Answer to sample questions (1Marks) f. Submit report in time (1Mark)
* As per CIAAN 2017 ANNEXURE II EvaluationSheet for the Micro Project ( Converted out of 40)
Maharashtra State Board of Technical Education, Mumbai
K. K. Wagh Polytechnic, Nashik-03 (0078)
Department of Information Technology
Progressive Assessment For Practicals For Non Theory Subject ( For "I" Scheme)
Academic Year : 2018-2019 Term : EVEN Name of Faculty: Mr.D.Pkumbharde
Programme & Code : Information Technology (IF) Course & Code :-EEC&22215
Semester:II Scheme:- I
Roll Marks out of 10 or 25 per Experiment Total out of 300 Out of 25 Student
Enrollment No. Exam Seat No. Name of Student Sign
No 1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5
42 1800780370 Ranmale Pravin Prabhakar
Roll Enrollment Exam Seat Marks out of 10 or 25 per Experiment Total Out of 25 Student
No
Name of Student out of 300 Sign
No. No. 1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 9
60
Note -: 1) While allotting the marks to the performed experiment/Assignment each PrO is to be accessed based on following criteria: a. Use of
appropriate tool to solveSkillfully
b. Operate Equipment the problem (1Mark)
(3Marks) c. Follow safety measures (1Mark) d. Quality of output achieved (3 Marks) e. Answer to sample questions (1Marks) f.
Submit report in time (1Mark)
* As per CIAAN 2017 ANNEXURE II EvaluationSheet for the Micro Project ( Converted out of 40)