Six-Sigma tools
September 10 2009
D M A I C C S C
Close Define
Standardise Measure
Resource
A P
Sponsor : Mr. C.S.SALI
C D
Control Analyse
Steering Committee : Mr. M.M.RAMCHANDANI
Check Improve
Team : Mr. D.D.SAMANT
: Mr. K.K.SHINDE
: Mr.D.P.Nehate
3
Expense head wise cost
Inferences
Pareto Chart of Total R&M Cost
60000000 1.Material Cost Contribute
100 56% of total R&M cost for
50000000
40000000 80 2008-09.
Percent
Cost
30000000 60
40
2. Contribution of Manpower &
20000000
contracting is 53.9%
10000000 20
0 0 3.For Further Analysis we will
Cost Head
concentrate of Material cost
Percent
30000000 60 for total cost is 34.3%
cost
20000000 40
2. Contribution of North & South
10000000 20
Central Division is for total cost
0 0 is 35.6%
Division n
io on on on on
is isi isi i si isi
iv iv iv iv iv
D D lD D lD 3.Futher Analysis Required
st rt
h a
ut
h a
Ea tr tr
No n So n
Ce Ce
h
out
S
Count 15914153 8913185 7603269 7144429 6831216
Percent 34.3 19.2 16.4 15.4 14.7
Cum % 34.3 53.5 69.9 85.3 100.0
5 D M A I C C S C
TOTAL MATERIAL COST-DIVISION WISE
Percent
60
Cost
Percent
COST
1000000 60
800000 Central Division for total Material
40
600000 cost / 1000 Lamps is 54.0%
400000 20
200000
0 0 2. Contribution of North & South
Division
Central Division is for total cost is
38.4%
Percent
60 15.04 15.00
COST
60 240V IP65
Count 15.73
15.04
11.09
9.057.305.174.634.594.244.143.663.433.012.892.612.141.681.23 CABLE N-ARM PVC 1.1KV 1C 10MM2
Percent 15 15 11 9 7 5 5 5 4 4 4 3 3 3 3 2 2 1 4.24 4.00
AL
Cum % 15 30 41 50 57 62 67 71 76 80 83 87 90 92 95 97 99100
LAMP HPSV SCREW CAP 240V 150W 4.14 4.00
South Central Division –Individual Material Cost
Percent
30
COST
60
LAMP HPSV SCREW CAP 250V
3.51 8.00
20 40
250W
0 0
Material Description SWGR POWER CONTACTOR
2.50 5.00
415V 70A 3POLE
11685 10551
Total Cost/1000 Cost/1000
Material Descriptions Issue Qty
Sr.No Cost(Lacs) Lamps Poles
LIGHT ACC POLE LOOP IN-OUT
2736 15.64 1.34 1.48
1 BOX FRP
Percent
60
COST
Percent
COST
60
2 2. Contribution of 150W /250
40 W lantern is 38%.
1
20
3. 1stsix item
0 0
Material Discription contribute 80% of
cost .Hence further
analysis may done for
That item
1. Following material is common ( contribute 80%) for East & South Central.
600
300000
500
Consumption Cost
400
Issue Qty
200000
300
200 100000
100
0 0
May-08 Jul-08 Sep-08 Nov-08 Jan-09 Mar-09 May-08 Jul-08 Sep-08 Nov-08 Jan-09 Mar-09
Issue Date Issue Date