You are on page 1of 7

Changzhou AODA Refrigeration Equipment Co. Ltd.

Contact:Chris Cell:+86-13861031399 Tel:0519-88188811 Fax:0519-85288833

QUOTATION
To(Buyer): jaja jamaludin
Unit name : Freezer Room Date:2021/09/11
Base body :8000width × 6000depth × 4200 high Design Temperature: - 20℃
Part “A”: Cold room body two-side color plate with Polyurethane foam
NO. Items Picture Products Name Specifications Unit OTY Unit Price Amount Remark

AURDAR 100mm thickness 0.326mm color steel


A1 m
2 208.00 $20.60 $4,284.80
cold panel density 42KG/m³ plated (fireproof)

2.0m*2.5m two-side
AD-05 Medium sliding door
A2 color steel plated pc 1.00 $586.00 $586.00
(100mm thickness)
(0.5mm thickness)
A4 Pressure balance window 190*190mm set 1.00 $25.00 $25.00

BY-703MVQ
A5 sealing material pc 52.00 $2.00 $104.00
(4㎡/1 pc, $2/1 pc)

Part “B”: Refrigeration system and pipeline-fittings

( Germany Bitzer) 20HP 4YD-20.2 380V


B1 set 1.00 $2,982.00 $2,982.00 380V
50hz 3phase 25KW

Diya DD-160 Diya brand


B2 Air cooler ㎡ set 1.00 $1,362.00 $1,362.00 is famous
380V/50hz in China
B3 Expansion valve TGEX--- set 1.00 $142.00 $142.00

B4 Solenoid valve EVR25 set 1.00 $146.00 $146.00

B5 Copper pipe 8M Ø10/Ø12/Ø19/Ø22 set 1.00 $310.00 $310.00

Heat insulation
B6 B1 set 1.00 $103.00 $103.00
pipelines(Utilidor) Ø45 10M

B7 Waterpipe and fittings(PVC) DN20 set 1.00 $137.00 $137.00


B8 Refrigerant(R404A), 10.9kg R404A set 1.00 $413.00 $413.00

cold room fittings of a


B9 machines, doors and domestic made set 208.00 $2.60 $540.80
supports etc.

Part C : Control and lighting system

Full automatic microcomputer


C1 DK15-2 set 1.00 $172.00 $172.00 Aurdar
temperature controller
C2 Wire and cable China set 1.00 $86.00 $86.00 China

Vapor proof
light(LED)/280*210(mm)
C3 LED(15㎡/1 set) pcs 3.00 $8.00 $24.00 LED
Power
supply:380V/35W/50HZ

In Total of Goods $11,417.60

Part D : Packing charge

Four angles are packed by


cardboard and the panel is
packed by film.
D1 After that our workers will tie $1.0/1㎡ 2 0.00 $0.00 $0.00
m
several panels together by
tape.
Then put them on pallet.
The door is packaged like this
D2 $100/a door pc 0.00 $0.00 $0.00
with the wooden box.

a wooden box is $100/


The refrigeration unit and for air cooler.The all-
D3 other fittings are packaged by in- one Compressor is set 0.00 $0.00 $0.00
standard export wooden box. packed by wooden
box, so no cost.

In Total of Goods and Packing Charge $11,417.60

Part E : C&F *** port (28CBM, LCL)

Sailing date:every **.


From Shanghai Port to ***
E1 It will take about *** 20ft 0.00 $0.00 $0.00
Port
days to arrive by
ship.

In Total $11,417.60
Note:1.The cold storage room(Power supply:380V/50HZ),the above pictures only for reference.
2.The price quoted based on FOB Shanghai price. 3.Payment item:50% deposit,the balance before delivery. 4.Lead time:15-30 days after deposit.
The main euipment with 1 year warranty. ( On the basis of our installation )
This Quotation‘s Validity is 2021/09/16.
Package:Cardboard box or wood case package