The Latur Water Supply Project would benefit 4.5 lakh people.
through a return on capital based the city who will receive clean drinking • Construct and rehabilitate the
methodology for pricing bulk water was water from source to tap for the next 20 transmission mains (Harsool scheme),
-a creative financing idea that greatly years. Aurangabad is a flourishing city trunk mains and feeder mains
helped in contract set up and bankability having population of over one million. • Rehabilitating the existing distribution
to acquire funds. The expectations of the people in the city and transmission water supply system of
are high from this project, and SPML will Aurangabad city
The kind of equipment used.•• aim to surpass it by providing world class • Rehabilitation, operation and
SPML is using latest SCADA infrastructure and water management maintenance of existing head works
(Supervisory Control and Data services. The work on this important and approach road and bridge, existing
Acquisition) system for monitoring water project is expected to begin in the third water treatment plant and recirculation
supply and AMR (Automatic Meter quarter of 2011. sump, existing pumping machinery and
Reading) system for metering. electrical installations
What will be the important features • Undertaking metering and increasing
Which is the dream project of your of this project? water supply coverage area to cover the
company? SPML will be responsible for the entire _city
SPML believes that the Aurangabad following key activities in this project: • Rehabilitation of existing water assets;
Water Supply Project, of which it • Construction of a new parallel water treatment plants, master balancing
is currently the preferred bidder, is water DI pipeline from Iaikwadi Dam reservoir, elevated service reservoirs etc
a marquee project that will further to Master Balancing Reservoir at • Development of computerised billing
enhance SPM:Ls contribution to Nakshatrawadi. and collection systems.
the nation's leading water supply • Construction, operation and • To supply potable water to the
infrastructure, putting the company in maintenance of new head works residents as per Central Public Health
the league of global water companies, and approach bridge, new pumping and Environmental Engineering
I such as Veolia, SUEZ and SAURo This machinery and electrical installation, Organisation (CPHEEO) norms -
new project will provide with the world new Master Balancing Reservoir/ • To operate and maintain the
class infrastructure to the residents of Elevated Service Reservoir facilities (including the transmission
and distribution system, meters and
computerised system) in accordance with
the terms of agreement
• Extend water supply coverage area
within the city limits, as and when
requested and required among others.
let