You are on page 1of 2

LIEIAIDI

I N T E R

SPML Infra Ltd is a leading infrastructure developer


with operational experience across 27 states in India.
The company has three decades of multi-disciplinary
experience in installing world class infrastructure for water
treatment and transmission, environmental engineering
and municipal solid waste management, power projects
and civil infrastructure construction. SPML has executed
more than 400 projects across India and has established
throu
proven leadership in the high technology construction meth<
of India's vital urban infrastructure on an Engineering, "acrea
helper
Procurement and Construction (EPC), Public Private.
to acq
Partnership (PPP) and Build-Own-Operate-Transfer"(BOOT)
basis. AAMIR JARIWALA, Head-Corporate Strategy & Thek
SPMI
Investor Relations, SPML Infra Ltd, shares more details. municipal body outsourcing its duties
(Supe
to a reliable private sector undertaking
Acqui
Current order book position redressal system with billing and to perform on a PPP basis. It is the
suppf
Rs 3,710 crore in water, power and collection. largest proj ect of its size in India. These
Readi:
civil infrastructure development. The project is a first of its kind with the contracts are difficult to negotiate and
Municipal Corporation having 10 per has clear performance target for the
Whicl
Which was the project that cent equity stake in the Spy formed with services to be delivered to the public.
comp
catapulted the company into the big SPML Infra. The main focus is to develop The preparatory work has started and
SPMl
league? a modern water supply system for a the construction work will begin in next
Water
The Bhiwandi Water Supply Project is a world class service. six months at the end of the pre work
is cun
landmark project for SPML. It caters to period.
a marl
the water requirement of over a million What is special about this project?
enhan
people of Bhiwandi, an important It is one of the first projects that deals What made a difference?
the na
satellite city of Mumbai, and provides with source to tap solution and the Private Sector Participation (PSP)
infras
them with the infrastructure to receive
the lee
clean drinking water from source to tap.
such a
The project envisages the following:
newp
~ Development of source in the
class i
river Tansa and its tributaries and
construction of KT weirs and two minor
dams to cater to the needs of the city for
the next 30 years.
~ Development of a new water treatment
plant including pumping stations, raw
water rising mains and the reservoirs.
~ Development and O&M of complete
water distribution system to cater to the
need of 24X7 water supply to the entire
city. .-- \ . - , :"_ _.".
~ Development of full-fledged customer'

28 I CBT APRil 2011 www.constructionbusinesstoday.net


WWW.con
LEIAIDI
INTERVIEW

The Latur Water Supply Project would benefit 4.5 lakh people.

through a return on capital based the city who will receive clean drinking • Construct and rehabilitate the
methodology for pricing bulk water was water from source to tap for the next 20 transmission mains (Harsool scheme),
-a creative financing idea that greatly years. Aurangabad is a flourishing city trunk mains and feeder mains
helped in contract set up and bankability having population of over one million. • Rehabilitating the existing distribution
to acquire funds. The expectations of the people in the city and transmission water supply system of
are high from this project, and SPML will Aurangabad city
The kind of equipment used.•• aim to surpass it by providing world class • Rehabilitation, operation and
SPML is using latest SCADA infrastructure and water management maintenance of existing head works
(Supervisory Control and Data services. The work on this important and approach road and bridge, existing
Acquisition) system for monitoring water project is expected to begin in the third water treatment plant and recirculation
supply and AMR (Automatic Meter quarter of 2011. sump, existing pumping machinery and
Reading) system for metering. electrical installations
What will be the important features • Undertaking metering and increasing
Which is the dream project of your of this project? water supply coverage area to cover the
company? SPML will be responsible for the entire _city
SPML believes that the Aurangabad following key activities in this project: • Rehabilitation of existing water assets;
Water Supply Project, of which it • Construction of a new parallel water treatment plants, master balancing
is currently the preferred bidder, is water DI pipeline from Iaikwadi Dam reservoir, elevated service reservoirs etc
a marquee project that will further to Master Balancing Reservoir at • Development of computerised billing
enhance SPM:Ls contribution to Nakshatrawadi. and collection systems.
the nation's leading water supply • Construction, operation and • To supply potable water to the
infrastructure, putting the company in maintenance of new head works residents as per Central Public Health
the league of global water companies, and approach bridge, new pumping and Environmental Engineering
I such as Veolia, SUEZ and SAURo This machinery and electrical installation, Organisation (CPHEEO) norms -
new project will provide with the world new Master Balancing Reservoir/ • To operate and maintain the
class infrastructure to the residents of Elevated Service Reservoir facilities (including the transmission
and distribution system, meters and
computerised system) in accordance with
the terms of agreement
• Extend water supply coverage area
within the city limits, as and when
requested and required among others.

What is its status?


We are expecting LOI/LOA by next
month, after which the proj ect work will
commence. CST