CIVIL WORKS EARLY HANDOVER READY FOR MEICA ERECTION

- TARGET DATE Dashboard as per Acceleration Programme (rev. 0)

OIL TANK- 23-Mar-2022


II [939b] ~ MDC Scope

North

CHLORINATOR & SCADA, SERVER, UPS


NEUTRALIZATION BLDG [853]
MCC300 ADMIN. BLDG RMS;
18-Mar-2022 [911] LABORATORY RM
10-Mar-2022
GENSET-II 16-Mar-2022
[939a]
01-Feb-2022

UCD Stream 3 & 4


POWER STA TREATED WATER 05-Jan-2022
~ MCC400 [932] PS [290c] BACKWASH
09-Mar-2022 16-Mar-2022 WW TANK
[311]
27-Mar-2022 RAW WATER
UCD SYSTEM – WATER [122] BLENDING TANK
SLUDGE BUFFER
TANK [319] [115]
TREATED WATER STO. COAG. TANK [121]
DECANTATION LAGOON 28-Mar-2022 07-Feb-2022
TANK [290b]
[353]
20-May-2022
09-May-2022
UCD SYSTEM
-SLUDGE [312] UCD Stream 1 & 2
27-Mar-2022 29-Dec-2021
DISINFECT. CONTACT TANK [290a]
20-May-2022

MCC BLDG
~ MCC700 SLUDGE THKG
17-Apr-2022 TANK CHEM. BLDG POWER GENSET-I OIL TANK-I
SLUDGE STA & MV ~ [933a] 27-Feb-2022
[800] [933b]
STO. SILO SLUDGE ~ MDC Scope
[348] 22-Mar-2022 28-Feb-2022 MCC200 [930]
DEWATERING 08-Feb-2022
02-Mar-2022 RM [342] 01-Mar-2022 ~ MDC Scope
Copyright © HCCG 2010 10-Apr-2022

CALAWIS WATER TREATMENT PLANT