SCOPE OF WORK INSTALLATION OF POLYMER PREPARATION SYSTEM

AREA/LOCATION
ACTIVITY NO.
ITEM ACTIVITIES
[A] PREPARATORY WORKS
Conduct safety toolbox meeting with the team prior to installation of Polymer Preparation System including checking of
1
proper and complete Personal Protective Equipment (PPE).
Explain the methodology of installation of Polymer Preparation System including the Job Hazard Analysis (JHA) by aligning
2
to the approved Hazard Identification and Risk Assessment Criteria (HIRAC).
3 Isolate the work area from unauthorized personnel by installing Safety Signage’s, Protection and Barricades.
4 Secure permit to work and once approved post a copy of it in specific workplace location.
5 Mobilization/Hauling of equipment and materials.
[B] WORK PROCEDURE
INSTALLATION
1 PREPARE THE MATERIALS AND TOOLS PRIOR FOR THE INSTALLATION OF PUMP
2 COORDINATE WITH GEN-CON PERSONEL.
PREPARE TEMPORARY PLATFORM/SCAFFOLDING/A-FRAME TO SUPPORT ON INSTALLATION OF POLYMER PREPARATION
3
SYSTEM
4 CHECK THE FOUNDATION TO ENSURE THE DIMENSION ARE ACCORDANCE AS PER ASSEMBLY LAY-OUT/DRAWING
5 USE CHAIN BLOCK/LIFITING EYE/ SLING BELT IN INSTALLING THE EQUIPMENT
6 CHECK THE SPEFICATION OF THE EQUIPMENT FOR THE PROPER ORIENTATION OF PIPING
7 FIX WITH CHEMICAL ANCHOR BOLT AND TIGHTEN THE NUT AND WASHER
8 ASSEMBLE THE NECESSARY PIPE, OVERFLOW, DRAIN AND SERVICE WATER INLET
[C] HOUSEKEEPING WORKS
1 Removal/Clearing of work area.
2 Removal of caution tapes and other safety signage installed as needed.
3 Return of all tools/equipment used to warehouse/designated approved equipment yard.
[D] MANPOWER
1 Project Manager
2 Mechanical Supervisor
3 Safety Officer
4 Foreman
5 Boom Truck Operator
6 Fitter
7 Scaffold Installation Worker
8 Rigger
9 Labor/Helper
[E] TOOLS & EQUIPMENT
1 Socket Wrench
2 Safety signage
4 Combination Wrench
6 Scaffolding
7 Platforms
8 Chain block
9 A-FRAME