BAR BENDING SCHEDULE

BELHASA SIX CONSTRUCT Ltd JOB :


PO Box 13055 DUBAI - UAE Phone : +971 4 34 72 777 Fax. : +971 4 34 73 512

Contract JAP006/C102 The Palm Jumeirah Gateway Bridge

Schedule Nr: E - 20500 - 2100

TITLE : PILE TYPE 3

Ref. Drawing Nr: D - 20500 - 2100

A Rev. Date

First issue Description

Exeq

CBR

Prepared by: Checked by:

page 1/4

BAR BENDING SCHEDULE


PROJECT: EMIRATES CEMENT LLC - EMCC LINE 1 - 7500 TPD

Reference BBS No: Reference DRG. No: Reference FLS BBL No: Date of Prepared:
Note: Steel type: T = grade 460 fy = 460 N/mm or R = grade 250R fy = 250 N/mm No. Type MEMBER CABLE TUNNEL T03 REINFORCEMENT Bar Mark 01 02 03 04 05 T T T T T Dia (mm) 12 12 12 12 10 of Mbr 1 1 1 1 1 bar in each 28 56 14 14 108 = bar total No. (m) 2.850 4.425 2.350 2.650 2.500 21 21 21 21 00

JVSO 051 BS R 0021ADD1(T03)


JVSO 051 SD R 0021 (T03) 051-421C 9/18/2006

Length

Shape code A 150 650 150 300 2490 B 2600 3180 2100 2100

BENDING (mm) C 150 650 150 300 D

28 56 14 14 108

page 2/4

E/I/R

page 3/4

BAR BENDING SCHEDULE - SUMMARY


PROJECT: EMIRATES CEMENT LLC-EMCC LINE 1 - 7500 TPD

Drawn

Issued by

Checked by

Approved by

Reference BBS No: Reference Drawing No: Reference FLS BBL No: Date of Prepared:

JVSO 051 BS R 0021ADD1(T03)


JVSO 051 SD R 0021 (T03) 051-421C

9/18/2006

A. STEEL TYPE "T" (HOT ROLLED DEFORMED BAR GRADE 460, fy = 460 N/mm)

DIAMETER (mm) 8 10 12 16 20 25 32 40

TOTAL LENGTH (m) 0.00 270.00 397.60 0.00 0.00 0.00 0.00 0.00

WEIGHT (kg/m')

TOTAL WEIGHT (kg)

0.617 0.888

166.6 353.1

TOTAL WEIGHT :

519.7

kg