Steel work welded in built up section / framed work including cutting, hoisting, fixing in position and applying a priming

coat of approved steel primer using structural steel etc. as required. 10.25.2 In grating, frames, guard bar, ladder, railings, brackets, gates and similar works. In grating, frames, guard bar, railing, brackets, gates and similar works. (Material/ Steel sections to be supplied by the Deptt.)
Description Welding charges (electric) 60cm Labour Blacksmith 1st class Beldar Bandhani Applying priming coat 0.65 sqm (Rate as per item no. 13.50.3 Sundries Total Add for water charges @ 1% on all except Total Add for contractors profit and overheads Total Add 10.50% as sales tax and surcharge Costof0.218qunital Cost for 1 Kg Unit Cm Day Day Day Sqm L.S. Quantity 60.00 0.70 0.50 0.25 0.60 4.55 Rate 4.00 400.00 295.00 300.00 24.28 1.89 Amount 240.00 280.00 147.50 75.00 14.57 8.60 765.67 7.66 773.32

77.33 850.66 89.32


939.98

43.12

Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works:Description Detail of cost for 10 sqm MATERIALS Red oxide Zinc chromate yellow primer Carriage LABOUR Painter Coolie Brushes,sand paper including sundries TOTAL Unit Quantity Rate Amount

litre L.S. Day Day L.S.

0.54 0.52 0.24 0.24 10.79

110.00 1.89 380.00 295.00 1.89

59.40 0.98 91.20 70.80 20.39 242.78

24.28

Providing and inserting silicone sealant in grooves and joints with pressure gun uniformaly all complete ad per the direction of E.I.C. Details of cost for 1 No.
Description Material Silicone Total Add for water charges @ 1% on all except Total Add for contractors profit and overheads Total Add 10.50% as sales tax and surcharge Cost for 1 No. Unit Each Quantity 1.00 Rate 800.00 Amount 800.00 800.00 8.00 808.00

80.80 888.80 93.32


982.12

Sorting of BTS shleter material at Pampore store and Transporting the same from Pampore store to the site inlcluding its assembling in to shelter for housing BTS equipment all complete as per direction of E.I.C. Details of cost for 1 Job
Description Material BTS shelter Total Add for water charges @ 1% Total Add for contractors profit and overheads Total Add 10.50% as sales tax and surcharge Cost for 1 No. Unit Each Job Quantity 1.00 Rate 12000.00 Amount 12000.00 12000.00 120.00 12120.00

1212.00 13332.00 1399.86