Welcome to the court of Emperor Jalaluddin Muhammad Akbar

Satyam | Integrated Engineering Solutions

Satyam 2009

Noble men! There is a very important matter before the court today.

The raw material price is shooting up. The material cost of a sword has gone up by Rs.10 . And . We are adding 50,000 soldiers to our army this year.

I want to handle this situation without increasing the taxes. Please give your valuable suggestions as to how we should face this situation.

Satyam | Integrated Engineering Solutions

Satyam 2009

Your Majesty, I have six ideas which can reduce the cost of a sword by atleast Rs.20 without compromising the functional requirements.

Why everyones quiet? Birbal! I am surprised that you too have become silent!!

!!

??

Brilliant!. Tell us those ideas.

!?

Satyam | Integrated Engineering Solutions

Satyam 2009

Part Count Reduction

Presently, the hilt has 7 parts. The proposed design will have 4 .

Existing Design

New Idea

7 parts
Satyam | Integrated Engineering Solutions

4 parts
Satyam 2009

Part Commonisatio n For the new hilt, instead of designing exclusive rivets, we can use the rivets of daggers.

x
Satyam | Integrated Engineering Solutions
Satyam 2009

Benchmarking When the Shah of Persia was our Guest last month , I observed that the hilt in his sword does not have a curved portion. We can design similar hilts for our experienced soldiers.

Existing Design

New Idea

Curved portion
Satyam | Integrated Engineering Solutions
Satyam 2009

The sheath which houses the blade is made of copper now. We can switch over to Alloy steel which is cheaper.

Alternate Material

Copper

Steel

Sheath Blade

Satyam | Integrated Engineering Solutions

Satyam 2009

Since alloy steel is stronger than copper, we can reduce the thickness by 0.5 mm which will save material

Weight Reduction

2 mm

1.5 mm

Sheath Blade

Satyam | Integrated Engineering Solutions

Satyam 2009

The curved blade design is yielding only 2 pieces per die. If a straight blade is designed, we can extract 3 pieces per die.

Yield Improvement

2 Blades

3 Blades

Satyam | Integrated Engineering Solutions

Satyam 2009

Saheb, there is no doubt that the present sword designed by you for my Grandfathers army is superior. However, let us test this new design in our barracks.If they pass the tests, we will deploy them in the battle field.

There is an advantage also. I do not have to increase the tax. Your majesty. The present design is being used since the time of Babur without any failure. We should not risk any design change. If the ideas pass the test, we can save atleast Rs. Ten Lakhs this year, thus serving the purpose of cost reduction.
Satyam 2009

Satyam | Integrated Engineering Solutions

10

10

Birbal! I wonder how you developed these ideas! Is there a systematic way by which others can also be trained to generate such ideas.

Yes, your Majesty. With the help of Functional Analysis System Technique(FAST) any body can generate such ideas. FAST is a powerful tool used in Value Engineering (VE) which is an extremely effective system to improve products and services for cost and productivity improvement.

If six ideas for the sword itself can save Rs. Ten lakhs , imagine how much money we can save on other weapons like spears, arrows and cannons etc.

Satyam | Integrated Engineering Solutions

Satyam 2009

11

11

Yes, your Majesty.

Birbal! There are four divisions in my army Infantry, Cavalry,Artillery and Elephant brigade. I want you to teach the engineers in each of these divisions the application of Value Engineering (VE), especially the Functional Analysis System Technique(FAST). Each division should release Armoury Change Requests (ACRs) for the worth of Rs.25 lakh.

Satyam | Integrated Engineering Solutions

Satyam 2009

12

12