6.

5 KW DCDG Proto D
st

nd

3 proto

4th proto

30/06/2011

30/06/2011

30/06

16/07

21/06/2011

30/06/2011

30/06

05/07/2011

Gen-set contoller- Ganesh

21/06/2011

25/06/2011

12

Gen-set contoller- EMS

21/06/2011

13

Base frame

21/06/2011

1/7/2011

1/7/2011

8/7/2011

14

Canopy

21/06/2011

8/7/2011

9/7/2011

10/7/2011

15

Fuel tank

21/06/2011

8/7/2011

9/7/2011

10/7/2011

16

Load bank(3 nos)


Fuel cosumption
measurement kit
arrangement
48v battery system

21/06/2011

30/06/2011

1 proto

2 proto

Engine + silencer
+filter+sensor
+switches+fuel solenoid

21/06/2011

Fly-wheel + ring gear

21/06/2011

23/06/2011

Radiator assembly

21/06/2011

1 available(as on
21/06/2011)

DC fan for radiator

21/06/2011

Electric governor
(WD)(SEDMEC)

12 available as on
21/06/2011
21/06/2011

AVM (front/back)

21/06/2011

critical issue

Battery with cable

21/06/2011

30/06/2011

Wiring harness

21/06/2011

PMA

21/06/2011

10

PMA- Ac to Dc convertor

11

Sr.No

17
18

Requirement

30/06/2011
30/06/2011

rd

25/06/2011 25/06/2011

30/06/2011 16/07/2011

.5 KW DCDG Proto Development


5th proto

6th proto

7th proto

8th proto

Responsibility

Follow-up

Date

Pramod

Suhas

22/06/2011

Pramod

Suhas

22/06/2011

Ashwin

Suhas

23/06/2011
23/06/2011

Ashwin

17/07

17/07

18/07

18/07

Ashwin

5/7/2011

5/7/2011

5/7/2011

5/7/2011

Ashwin

25/06/2011

Ashwin/praveen

Suhas

Praveen

Suhas

Amit

Suhas/ASP

25/06/2011 25/06/2011 25/06/2011


_

8/7/2011

8/7/2011

8/7/2011

8/7/2011

11/7/2011

12/7/2011

13/7/2011

13/7/2011

11/7/2011

12/7/2011

13/7/2011

13/7/2011
Shyam

jofy

Suhas

1/7/2011

Remark

Requirement to LIPL by pramod


Requirement to LIPL by pramod

PO to release
PO to release-critical

SEDMEC sample 1 no required


critical issue

PO to release
PO to release
PO to release after getting spec.

PO to release-Ashwin
PO to release-Ashwin
PO to release-Ashwin