OLC
Target
GEN
Aux. Cons.
Performance
LD Loss
Peak hour Gen. and
PLF
Ash Evac./Unburnt
CV
Aux. Non Avail. Hrs.
30-Oct-2011
(MW)
(MUs)
(MUs)
(MUs)
(%)
UNIT-I
146
621.583
100
114.6
75.79
UNIT-II
115
572.634
100
97.111
64.23
UNIT-III
165
693.178
130
125.53
83.02
(MUs)
(Mus / day)
(MUs)
(MUs)
(%)
(%)
(%)
(ml/kwh)
(%)
(MUs)
(MUs)
(Cu.M)
(MUs)
(MUs)
(MUs)
(MUs)
(MUs)
(MUs)
31.37
-14.600
3.945
0.3372
78.27
100
78.27
0
0.3474
1300
678.42
150
1.095
0
0
1.095
0
0
43.16
2.889
3.545
0.348
70.34
100
70.34
0
0.3501
1300
727.37
250
0.96
0
0.535
1.495
0
0
56.13
4.470
4.448
0.421
88.25
100
88.25
0
0.401
1475
781.82
590
0.573
0
0.019
0.592
0
0
47.34
1.591
4.682
0.3866
92.9
100
92.9
0
0.3921
1445
930.37
580
0.328
0
0.03
0.358
0
0
178
-5.650
16.62
1.4928
82.44
100
82.44
0
1.4906
5520
3117.98
1570
2.956
0
0.584
3.54
0
0
(MUs)
(%)
(MUs)
(%)
(MUs)
(%)
(MUs)
(%)
(MUs)
(%)
(Hrs.)
(Hrs.)
(%)
(%)
(kcal/kg)
(Hrs.)
(Hrs.)
(Hrs.)
0.67
79.76
0.651
77.5
1.321
78.63
22.912
75.77
208.847
61.85
1
2.55
1.54
6.36
3105
0.524
62.38
0.544
64.76
1.068
63.57
18.905
62.52
192.603
57.04
3.45
5.2
1.2
6.53
3066
0.751
89.4
0.757
90.12
1.508
89.76
24.738
81.81
234.463
69.43
3.3
7.15
0.58
3.19
3197
0.773
92.02
0.775
92.26
1.548
92.14
4.323
14.3
172.882
51.2
3.05
4.15
0.47
3.1
2896
2.718
80.89
2.727
81.16
5.445
81.03
70.878
58.6
808.795
59.88
------------3064
D,2
f,2.4
OLC
Gross Gen(FY)
Monthly Target
Gross Gen Month
Actual Montly PLF (%)
A,1.05
Consumption
Other HT Aux
Coal
LDO
FO.
H2 Cylinders
N2 Cylinders
NH3 Cylinders
Soften Water
Ash Water
Total SP. Water
(Hrs.)
(MT)
(MT)
(MT)
(NO)
(NO)
(NO)
(Cu.M)
(Cu.M)
(Lit/Kwh)
3961
0
0
6
0
6
7200
3224
0
0
6
2
6
7200
UTS
2730
91325
ROAD
1901
53437
rwp-7,24
4486
0
0
2
0
1
10800
cwp3,24
4586
0
0
4
0
0
10800
16257
0
0
18
2
13
36000
18650
3.481
COAL STATUS
Mode
Coal Receipt - Daily
Coal Receipt - Monthly
ROPE
9500
236700
RAIL
24615
508811
Total
38745
890273
Reclaimed
1860
Item
Closing
Stock
Reciept
STG-I/II
receipt
stock
STG-III
Erai Dam
Level
STG-I/II
STG-III
LDO (KL)
2576.19
FO (KL)
2689.28
LSHS (KL)
Total : 40950
: ETP1: 28350
Current
1763.05 207.375
Last Year : ETP2: 9600
5425.59 206.975
Drop in 24 ETP3: 2400
0 Hrs. 0.000
Dam
Ash Bund: 0
H2 CYLINDERS
24
31
-1
level
CO2 CYLINDERS
N2 CYLINDERS
NH3 CYLINDER
Remark :
Water
Recovery
0
0
0
0
One Day
Reservoir
STGErai Bridge:
I/II:183.800 0
126
99
15
-36
STGWaste Hold
III:185.300 Recovery:
12
600
13
30
31 FF-9217
UNIT-V
UNIT-VI
UNIT-VII STAGE III STATION
368
368
391
1127
1727
1678.819 1394.956 1106.534 4180.309 6582.331
260
255
260
775
1165
251.035 244.759
246.097
741.891 1137.541
69.73
67.99
68.36
68.69
67.52
122.57
8.965
10.27
0.8443
85.58
100
85.58
0
0.9565
3380
1701.18
910
1.73
0
0
1.73
0
0
119.67
10.241
10.152
0.8322
84.6
100
84.6
0
0.846
3390
1995.04
637
1.848
0
0
1.848
0
0
115.12
357.36
535.36
13.903
33.109
27.459
0
20.422
37.042
0.9008
2.5773
4.0701
0
56.73
65.96
0
66.67
78.63
#DIV/0! 85.090745 83.886557
0
0
0
0.2761
2.0786
3.5692
3390
10160
15680
2283.47
5979.69
9097.67
951
2498
4068
0
3.578
6.534
0
0
0
12
12
12.584
12
15.578
19.118
0
0
0
0
0
0
1.39
69.5
1.57
78.5
2.96
74
46.535
64.63
565.632
70.35
6
14
0.67
1.82
3040
1.645
82.25
1.4
70
3.045
76.13
46.02
63.92
468.281
58.24
6.3
14.3
0.59
1.77
3112
1.595
79.75
1.58
79
3.175
79.38
49.376
68.58
372.607
46.34
6
8
0.51
1.97
3082
4.63
77.17
4.55
75.83
9.18
76.5
141.931
65.71
1406.52
58.31
------------3078
7.348
78.5
7.277
77.75
14.625
78.13
212.809
63.16
2215.315
58.88
------------3073
bfp-A,24
8386
0
0
3
0
2
19876
Coal Stock
546238
Coal
Bunkering/
Stacking
STG-I/II :
12100/0
STG-III :
22734/0
Cost of
Gen.(Rs/kw
h)
1.612
bfp-C,24
8215
0
0
3
0
0
15076
8928
0
0
1
0
0
15076
25529
0
0
7
0
2
50028
73150
4.536
41786
0
0
25
2
15
86028
91800
4.145
Sr No
Unit
Description
Resp
Type
Rep. on
10/22/2011
TM
Unit 1 CT FAN 11
TM
TM
minor
shut
down
AOH
TM
major
10/22/2011
EM
10/22/2011
EM
minor
shut
down
AOH
TM
10
Unit 1
TIC
11
12
13
14
CHP-A
10/22/2011
Target date
11/10/2011
10/22/2011
10/25/2011
11/7/2011
10/25/2011
11/10/2011
major
10/25/2011
10/27/2011
minor
10/25/2011
10/30/2011
10/25/2011
10/30/2011
TM
shut
down
AOH
10/25/2011
10/30/2011
CHP-A
major
10/27/2011
11/10/2011
TM-I
minor
shut
down
10/29/2011
11/2/2011
10/31/2011
11/7/2011
17
BM
major
10/27/2011
10/29/2011
18
BM
10/27/2011
10/29/2011
19
BM
10/27/2011
11/15/2011
20
BM
minor
shut
down
AOH
10/27/2011
10/29/2011
21
EM
major
10/29/2011
11/15/2011
22
TM/RP
minor
10/29/2011
23
TM
24
EM
shut
down
AOH
25
TM
26
27
28
Unit 2
29
Unit 2
30
Unit 2
31
Unit 2
15
16
32
33
TIC
TM-I
AOH
10/29/2011
10/29/2011
10/29/2011
11/12/2011
major
10/29/2011
11/4/2011
minor
shut
down
10/29/2011
11/1/2011
BM
AOH
10/29/2011
BM
major
BM
minor
BM
BM
shut
down
AOH
BM
major
BM
10/29/2011
10/29/2011
10/29/2011
10/29/2011
10/29/2011
36
37
BM
major
10/29/2011
38
TM
10/29/2011
39
BM
minor
shut
down
40
OS
AOH
10/21/2011
41
TM
major
10/21/2011
42
TM
10/21/2011
11/1/2011
43
TM
minor
shut
down
10/29/2011
11/3/2011
44
TIC
AOH
10/21/2011
45
Unit 3
TIC
major
10/22/2011
12/15/2011
TIC
10/22/2011
12/15/2011
34
35
Unit 2
BM
minor
10/29/2011
BM
shut
down
10/29/2011
BM
AOH
10/29/2011
10/29/2011
48
BM
minor
shut
down
AOH
49
TM
major
10/22/2011
50
TIC
10/20/2011
51
CHP-A
minor
shut
down
52
TM/TIC
AOH
10/26/2011
53
TIC
major
10/26/2011
10/27/2011
54
BM
10/27/2011
11/7/2011
55
TIC
10/27/2011
11/10/2011
56
TM 1B
minor
shut
down
AOH
10/27/2011
11/2/2011
57
Oil gun problems (1) AB1 oil gun having oil leakage but
due to BT1 corner inoperative gun cannot be removed
Unit 3
(2) EF2 manual oil v/v spindle is bend (3) AB1, AB4, CD3,
EF4 oil gun svng HMV inoperative
BM1B
major
10/27/2011
10/29/2011
BM
minor
shut
down
AOH
10/29/2011
major
10/29/2011
minor
10/29/2011
46
47
58
59
60
61
62
63
64
TIC
BM-1B
BM-1B
TM-1B
TIC-1B
AHP
shut
down
AOH
10/22/2011
10/22/2011
12/20/2011
10/26/2011
10/29/2011
10/29/2011
10/30/2011
10/29/2011
65
BM
major
10/30/2011
66
BM
10/30/2011
67
BM
minor
shut
down
68
Unit 3
BM
AOH
10/30/2011
TM-1B
major
10/30/2011
TIC-1B
10/30/2011
10/30/2011
70
71
TM-1B
72
EM-3B
minor
shut
down
AOH
73
TM-1B
major
10/31/2011
74
TIC
minor
10/27/2011
11/27/2011
75
TIC
shut
down
10/31/2011
10/31/2011
76
Unit 5 COC motor of C/F in-operative no.5A, 5C, 5D, 5F, 5G, 5H
EM
AOH
10/24/2011
10/28/2011
77
EM
major
10/24/2011
11/2/2011
78
TM
minor
shut
down
10/25/2011
11/10/2011
10/28/2011
11/6/2011
AOH
10/28/2011
81
EM
major
10/29/2011
10/29/2011
82
I&C
10/29/2011
10/29/2011
83
BM
minor
shut
down
84
I&C
AOH
10/31/2011
11/1/2011
85
Unit 5
BM
major
10/31/2011
11/1/2011
86
Unit 6
TM
10/22/2011
11/10/2011
87
Unit 6
minor
shut
down
88
Unit 6
T/M
AOH
10/24/2011
89
Unit 6
TM
major
10/24/2011
90
EM
minor
10/24/2011
91
TMII
shut
down
10/30/2011
92
EM
AOH
10/24/2011
11/5/2011
93
EM
major
10/24/2011
10/27/2011
69
79
80
I&C
TM
I&C
11/3/2011
10/31/2011
10/31/2011
10/31/2011
11/3/2011
10/29/2011
10/24/2011
94
ODP-II
95
ODP-II
96
97
98
99
Unit 6
100
101
Unit 6
102
Unit 6
103
104
Unit 6
minor
10/29/2011
EM
shut
down
AOH
TM-II
major
10/29/2011
TM-II
minor
10/26/2011
10/29/2011
11/24/2011
10/29/2011
11/3/2011
BM-11
shut
down
AOH
ODP-II
major
10/30/2011
BM-11
minor
10/30/2011
BM-11
shut
down
10/30/2011
BM-11
AOH
10/31/2011
TM
major
10/30/2011
minor
shut
down
10/30/2011
EM-II,
Test-II
AOH
10/30/2011
TM-II
10/30/2011
10/30/2011
105
106
EM-II
107
TMII
108
Unit 6
109
TM-II
major
10/30/2011
110
EM-II
minor
10/30/2011
111
TEST-II
shut
down
10/30/2011
10/31/2011
112
Unit 6
TM-II
AOH
10/30/2011
11/2/2011
TM-II
major
10/30/2011
11/2/2011
TM-II
minor
shut
down
10/30/2011
11/1/2011
TEST-II
AOH
10/30/2011
113
114
115
116
TEST-II
10/31/2011
11/1/2011
11/7/2011
11/5/2011
10/30/2011
117
TM-II
major
10/30/2011
118
ODP-II
10/31/2011
119
EM-II
120
TEST-II
minor
shut
down
AOH
121
TM
major
10/20/2011
11/5/2011
122
ODP
10/22/2011
11/22/2011
123
EM
10/22/2011
10/29/2011
124
TM
minor
shut
down
AOH
10/26/2011
10/28/2011
125
EM
major
10/20/2011
10/28/2011
11/15/2011
10/31/2011
10/31/2011
126
127
128
129
Unit 7 Coal mill 7GH girth gear seal air motor not available
130
EM
131
TM
132
Unit 7 EHG 2
TM
133
TM
BM
BM
EM
EM
minor
shut
down
AOH
10/20/2011
11/5/2011
10/20/2011
11/5/2011
10/26/2011
10/28/2011
major
10/27/2011
11/6/2011
minor
shut
down
AOH
10/27/2011
11/3/2011
10/27/2011
11/5/2011
Remark
s\D
WIP
shutdown job
S/D
11/2/2011
Restoration of grill
11/1/2011
attended
bearing Available on
04/11/2011
ATTENDED
Pump Available
WIP
bearing Available on
04/11/2011
Attended 27/10/11
S/Coil Replcd. to3ACOP
solenoid coil not
available
Valve charaecteristics is
not linear
strickly to be observation
6/8/9 pad shutdown job
29/10/2011,01/11/11
ATTENDED 27/10/11
11/1/2011
11/10/2011
PERMIT ISSUED
PERMIT ISSUED
internal inpsection by bm
11/1/2011
U/P
Permits applied but not
issued COC 6E&6H
checked on date
27/10/11 motor found
ok informed to B/M &
I&C
UNDER PERMIT
PWR 4 initiated ODP
permit applied
S/D
Restoration in s/d
Restoration in s/d
Motor r phase found
open motor replacement
work is in progress
Fuse replacement work
taken at OPD board on
31/10/11
s/d
Under Permit
7B/5 (G/B Case at HO)
11/5/2011
10/31/2011
11/10/2011
11/10/2011
Motor Burnt
Unit-1 to 7
Units
Total
Available
BM
Target Date
SB Nos.
WSB status
U-1
32
28
4
(3, 25, 21,31)
U-2
32
29
1(22)
U-3
56
37/49
T=7
10/31/2011
(24,19,46,
50=NC) (30=Not
gtg.stopped,
(
3, 41=LNR)
U-4
56
38
U-5
104
103
1( 23 )
U-6
104
103
3 (96,66,56)
10/31/2011
U-7
104
100
3 (66, 45, 56
attended
U-1
10
10
U-2
10
U-3
20
U-4
20
U-5
32
10/31/2011
3,
(04,14 ,23)
T=5(13=HR) (32
35=
Jam)(39=PVI)(3
3=OR)
1 (68)
LRSB status
42
U-6
U-7
AHSB status
U-1
U-2
10
U-3
U-4
U-5
U-6
U-7
ESP Field status
2(38,42)
Field Nos.
Target Date
Field Nos.
U-1
U-2
U-3
20
19
U-4
20
18
U-5
48
45
1A2,2B2,4D2
U-6
48
45
U-7
32
27
Date
30/10/11
Unit-1 to 7
Units
Total Available
2
C5
Not
available
Soot
Blowers
I&C/TIC
SB Nos.
Target Date
WSB status
U-1
32
28
U-2
32
29
1(22)
U-3
56
49
U-4
U-5
U-6
U-7
56
104
104
104
38
104
103
100
8
10/31/2011
(3,19,24,30,
33,41,46,
50)
LRSB status
U-1
10
10
1 (96)
3 (66, 45,
56
10/31/2011
10/31/2011
attended
BM
SB Nos.
4
(3, 25,
21,31)
2
(04,14)
4
(13,32,35,
39)
1 (68)
U-2
U-3
U-4
U-5
U-6
U-7
AHSB status
U-1
U-2
U-3
U-4
U-5
U-6
U-7
ESP Field
status
10
20
20
32
10
4
4
4
42
8
4
2(38,42)
Field Nos.
U-1
U-2
U-3
U-4
6
6
20
20
6
6
19
18
U-5
48
45
U-6
48
45
U-7
32
27
Target Date
Field Nos.
2
C5
1A2,2B2,4
D2
4A1, 4A2,
2D1
A1, A3, A4,
B2
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
Resaon
EM
Target Date
SB Nos.
Target Date
11/1/2011
IR 17
Attended.
31-Oct
11/1/2011
24.10.11
Target Date
Field Nos.
Target Date
B2 S/D WORK
B5
Resaon
Target Date
EM
SB Nos.
Target
Date
11/1/2011
IR 17 directly getting
'ON', IR 22 No reverse
command.
11/1/2011
24.10.11
Target Date
Field Nos.
Target
Date
B2 S/D WORK
B5
UNIT-I
UNIT-II
UNIT-III
UNIT-IV
C/m Problems
0.064
Chp Problem
1.757
Economiser Leakage
0.385
Id Fan Problem
Poor Coal Quality
1.053
1.200
0.658
Unit Synchronisation
And Stabilisation
0.143
0.717
Unit Withdrawing In
Progress
1.053
Total
1.585
0.722
2.617
UNIT-I
UNIT-II
UNIT-III
UNIT-IV
0.019
0.535
0.030
Total
1.095
0.960
0.573
0.328
1.095
1.495
0.592
0.358
UNIT-V
UNIT-VI
UNIT-VII
Total
0.000
0.325
0.575
0.428
1.392
1.757
0.385
2.075
2.400
UNIT-V
2.761
3.336
UNIT-VI
1.335
9.225
0.209
0.209
1.972 12.968
UNIT-VII
12.000
Total
12.000
0.000
0.049
0.535
1.730
1.848
6.534
0.000
1.730
Description
Responsibility
1
2
L
Other Problems
1
2
10/25/2011
Reporting Date
Target Date
Remark
Description
Responsibility
1
2
L
Other Problems
1
2
10/25/2011
Reporting Date
Target Date
Remark