CSTPS

Gen Target For


Month(MUs) : 1165

DAILY PLANT PERFORMANCE REPORT - 1 FOR


Particulars

OLC
Target

GEN
Aux. Cons.
Performance

Loss of Gen. day

LD Loss
Peak hour Gen. and
PLF

Ash Evac./Unburnt

CV
Aux. Non Avail. Hrs.

30-Oct-2011

(MW)
(MUs)
(MUs)
(MUs)
(%)

UNIT-I
146
621.583
100
114.6
75.79

UNIT-II
115
572.634
100
97.111
64.23

UNIT-III
165
693.178
130
125.53
83.02

Balance Monthly Target


Asking rate per day
Gross Gen Day
Aux. Cons.
PLF Day
Availablity Day
Loading factor Day
Sp.Oil Cons. Day
Aux. Cons. Day
CEA Target
Balance CEA Target
DM Water Day
Poor Coal Quality
CHP Problem
Plant Problem
Total Loss
LD Loss Monthly
LD Loss Yearly(FY)

(MUs)
(Mus / day)
(MUs)
(MUs)
(%)
(%)
(%)
(ml/kwh)
(%)
(MUs)
(MUs)
(Cu.M)
(MUs)
(MUs)
(MUs)
(MUs)
(MUs)
(MUs)

31.37
-14.600
3.945
0.3372
78.27
100
78.27
0
0.3474
1300
678.42
150
1.095
0
0
1.095
0
0

43.16
2.889
3.545
0.348
70.34
100
70.34
0
0.3501
1300
727.37
250
0.96
0
0.535
1.495
0
0

56.13
4.470
4.448
0.421
88.25
100
88.25
0
0.401
1475
781.82
590
0.573
0
0.019
0.592
0
0

47.34
1.591
4.682
0.3866
92.9
100
92.9
0
0.3921
1445
930.37
580
0.328
0
0.03
0.358
0
0

178
-5.650
16.62
1.4928
82.44
100
82.44
0
1.4906
5520
3117.98
1570
2.956
0
0.584
3.54
0
0

Morn. Peak-Gen Day


Morn. Peak-PLF Day
Eve. Peak-Gen Day
Eve. Peak-PLF Day
Total Peak-GEN day
Peak-PLF Day
Prog. Peak-Gen Month
Prog. Peak-PLF Month
Prog. Peak-Gen (FY)
Prog. Peak-PLF(FY)
Bottom Ash
Fly Ash
Unburnt Fly
Unburnt Slg
Coal CV
Ash Series
Coal Mills
CHP AUX

(MUs)
(%)
(MUs)
(%)
(MUs)
(%)
(MUs)
(%)
(MUs)
(%)
(Hrs.)
(Hrs.)
(%)
(%)
(kcal/kg)
(Hrs.)
(Hrs.)
(Hrs.)

0.67
79.76
0.651
77.5
1.321
78.63
22.912
75.77
208.847
61.85
1
2.55
1.54
6.36
3105

0.524
62.38
0.544
64.76
1.068
63.57
18.905
62.52
192.603
57.04
3.45
5.2
1.2
6.53
3066

0.751
89.4
0.757
90.12
1.508
89.76
24.738
81.81
234.463
69.43
3.3
7.15
0.58
3.19
3197

0.773
92.02
0.775
92.26
1.548
92.14
4.323
14.3
172.882
51.2
3.05
4.15
0.47
3.1
2896

2.718
80.89
2.727
81.16
5.445
81.03
70.878
58.6
808.795
59.88
------------3064

D,2

f,2.4

OLC
Gross Gen(FY)
Monthly Target
Gross Gen Month
Actual Montly PLF (%)

UNIT-IV STAGE I&II


174
600
514.627
2402.022
60
390
58.409
395.65
38.63
65.42

A,1.05

Consumption

Other HT Aux
Coal
LDO
FO.
H2 Cylinders
N2 Cylinders
NH3 Cylinders
Soften Water
Ash Water
Total SP. Water

(Hrs.)
(MT)
(MT)
(MT)
(NO)
(NO)
(NO)
(Cu.M)
(Cu.M)
(Lit/Kwh)

3961
0
0
6
0
6
7200

3224
0
0
6
2
6
7200

UTS
2730
91325

ROAD
1901
53437

rwp-7,24
4486
0
0
2
0
1
10800

cwp3,24
4586
0
0
4
0
0
10800

16257
0
0
18
2
13
36000
18650
3.481

COAL STATUS
Mode
Coal Receipt - Daily
Coal Receipt - Monthly

ROPE
9500
236700

RAIL
24615
508811

Total
38745
890273

Reclaimed
1860

OIL & GAS


STATUS
Oil

Item

Closing
Stock

Reciept

STG-I/II

receipt
stock

STG-III

Erai Dam
Level

STG-I/II

STG-III

LDO (KL)

2576.19

FO (KL)

2689.28

LSHS (KL)

Total : 40950
: ETP1: 28350

Current
1763.05 207.375
Last Year : ETP2: 9600
5425.59 206.975
Drop in 24 ETP3: 2400
0 Hrs. 0.000

Dam

Ash Bund: 0
H2 CYLINDERS

24

31

-1

level
CO2 CYLINDERS

N2 CYLINDERS
NH3 CYLINDER
Remark :

Water
Recovery

0
0

0
0

One Day
Reservoir
STGErai Bridge:
I/II:183.800 0

126

99

15
-36

STGWaste Hold
III:185.300 Recovery:
12
600
13

30

31 FF-9217

UNIT-V
UNIT-VI
UNIT-VII STAGE III STATION
368
368
391
1127
1727
1678.819 1394.956 1106.534 4180.309 6582.331
260
255
260
775
1165
251.035 244.759
246.097
741.891 1137.541
69.73
67.99
68.36
68.69
67.52
122.57
8.965
10.27
0.8443
85.58
100
85.58
0
0.9565
3380
1701.18
910
1.73
0
0
1.73
0
0

119.67
10.241
10.152
0.8322
84.6
100
84.6
0
0.846
3390
1995.04
637
1.848
0
0
1.848
0
0

115.12
357.36
535.36
13.903
33.109
27.459
0
20.422
37.042
0.9008
2.5773
4.0701
0
56.73
65.96
0
66.67
78.63
#DIV/0! 85.090745 83.886557
0
0
0
0.2761
2.0786
3.5692
3390
10160
15680
2283.47
5979.69
9097.67
951
2498
4068
0
3.578
6.534
0
0
0
12
12
12.584
12
15.578
19.118
0
0
0
0
0
0

1.39
69.5
1.57
78.5
2.96
74
46.535
64.63
565.632
70.35
6
14
0.67
1.82
3040

1.645
82.25
1.4
70
3.045
76.13
46.02
63.92
468.281
58.24
6.3
14.3
0.59
1.77
3112

1.595
79.75
1.58
79
3.175
79.38
49.376
68.58
372.607
46.34
6
8
0.51
1.97
3082

4.63
77.17
4.55
75.83
9.18
76.5
141.931
65.71
1406.52
58.31
------------3078

7.348
78.5
7.277
77.75
14.625
78.13
212.809
63.16
2215.315
58.88
------------3073

bfp-A,24
8386
0
0
3
0
2
19876

Coal Stock
546238

Coal
Bunkering/
Stacking

STG-I/II :
12100/0
STG-III :
22734/0

Cost of
Gen.(Rs/kw
h)
1.612

bfp-C,24
8215
0
0
3
0
0
15076

8928
0
0
1
0
0
15076

25529
0
0
7
0
2
50028
73150
4.536

41786
0
0
25
2
15
86028
91800
4.145

Sr No

Unit

Description

Resp

Type

Rep. on
10/22/2011

Unit 1 CEP 1C Low discharge pressure

TM

Unit 1 CT FAN 11

TM

Unit 1 IAC Dryer for U#2 not I/S

TM

minor
shut
down
AOH

Unit 1 PCR AC plant compressor no.4 N/A

TM

major

10/22/2011

Unit 1 PCR AC plant comp no.5 Elect supply problem

EM

10/22/2011

Unit 1 Coal Mill-1C Bunker Scrapping

Unit 1 UAT Cooling Fan no.12, 21, 24, 42

EM

minor
shut
down
AOH

Unit 1 CW-8 Valve in-operative

TM

10

Unit 1

TIC

11

Unit 1 BFD-14 at PCR 100% local 50%

12

Unit 1 CW pump 2 having heavy gland leakage

13

Unit 1 CHP Problems-Lumps/steel plate/stone etc

14

BFP-1B discharge valve and Motor cooling water valve


open close indication not open/close

CHP-A

10/22/2011

Target date

11/10/2011

10/22/2011

10/25/2011

11/7/2011

10/25/2011

11/10/2011

major

10/25/2011

10/27/2011

minor

10/25/2011

10/30/2011

10/25/2011

10/30/2011

TM

shut
down
AOH

10/25/2011

10/30/2011

CHP-A

major

10/27/2011

11/10/2011

Unit 1 Extra switch gear compressor-discharge/unloader


GS PUMP NO.1 NRV & DISCHARGE VALVE PASSING &
Unit 1
brg. COOLING FLOW LESS.
COAL
MILL-1D
FOREIGN
MATERIAL
Unit 1
FOUND.EG.STONE,MS PLATE,ANGLES.

TM-I

minor
shut
down

10/29/2011

11/2/2011

10/31/2011

11/7/2011

17

Unit 2 C/M 'A' - L/C no.5 & 8 oil leakage.

BM

major

10/27/2011

10/29/2011

18

Unit 2 BADp 'A' heavy leakage from gland observed

BM

10/27/2011

10/29/2011

19

Unit 2 BADp 'B' poor discharge

BM

10/27/2011

11/15/2011

20

Unit 2 ESP 12 'B' hopper - clear water line heavy leakage.

BM

minor
shut
down
AOH

10/27/2011

10/29/2011

21

Unit 2 CT FAN 5 MOTOR REMOVED

EM

major

10/29/2011

11/15/2011

22

Unit 2 CT FAN 8 GEAR BOX JAM

TM/RP

minor

10/29/2011

23

Unit 2 SWG COM NO.1 NOT DEVELOPING PR.(6.6 K V)

TM

24

Unit 2 FADP-C under permit

EM

shut
down
AOH

25

Unit 2 F/F Pump EP-1 NDE side pump abnormal sound

TM

26

Unit 2 COP-2B OIL IN WATER SEAL

27

Unit 2 ID FAN 2A HAVING HEAvY VIBRATION

28

Unit 2

ID FAN 2A LOPS NOT DEVELOP REQUIRED PRESURE. IT


TAKES @ 60 SEC TO DEVELOP REQUIRED PRESURE

29

Unit 2

30

Unit 2

31

Unit 2

15
16

32
33

TIC

TM-I

AOH

10/29/2011

10/29/2011

10/29/2011

11/12/2011

major

10/29/2011

11/4/2011

minor
shut
down

10/29/2011

11/1/2011

BM

AOH

10/29/2011

ID fan 2A bearing inlet pr. Is maintained on lower side


pr.reduces again with increase in ambiant temp.

BM

major

ID FAN 2B HAVING NEAVY VIBRATION AND NOT TAKING


FULL LOAD OF 110 AMS EVEN SUFFICIENT OIL INSCOOP

BM

minor

ID FAN 2B LOPS NOT DEVOLP REQUIRED PRESSURE


INSTANTLY IT TAKES MORE TIME
Unit 2 FD FAN 2A VANE OPERATION IS VERY SLUGGISH
FD FAN 2B VANE OPERATION IS VERY SLUGGISH TAKEN
Unit 2
@15 MINS or MORE TO GIVE EFFECT

BM

BM

shut
down
AOH

BM

major

BM

10/29/2011

10/29/2011
10/29/2011
10/29/2011
10/29/2011

36

FD FAN 2A AND 2B LOPS NOT DEVELOP REQUIRED


PRESSURE INSTANTLY
R/H DAMPERS ARE DAMAGED .NOT ABLE TO
Unit 2 MAINTAINED REQUIRED R/H STEAM TEMP .ON LOWER
SIDE DURING COLD AND WARM ROLLING
Unit 2 WIND BOX TO FURNACE DP IS ZERO

37

Unit 2 AIR REGISTERS ARE JAM

BM

major

10/29/2011

38

Unit 2 FDA 3 MAIN AND BYPASS VALVES PASSING

TM

10/29/2011

39

Unit 2 BAS SAFETY VALVE IS PASSING

BM

minor
shut
down

40

Unit 3 Coal mill area housekeeping very poor

OS

AOH

10/21/2011

41

Unit 3 CT fan no.11

TM

major

10/21/2011

42

Unit 3 DM/DM cooler no.1

TM

10/21/2011

11/1/2011

43

Unit 3 COP3B G/Box having smell

TM

minor
shut
down

10/29/2011

11/3/2011

44

Unit 3 COP-3A solenoid problem (COP N/A since long)

TIC

AOH

10/21/2011

45

Unit 3

TIC

major

10/22/2011

12/15/2011

TIC

10/22/2011

12/15/2011

34
35

Unit 2

BM

minor

10/29/2011

BM

shut
down

10/29/2011

BM

AOH

10/29/2011

10/29/2011

48

Shear pin failure indication required (Previously


Available)
Unit 3 No coal flow indication required onUCP
R/H & S/H Temp Control not on Auto (Sluggish valve
Unit 3
operation)
Unit 3 R/H (LHS) spray manual iso. Valve passing

BM

minor
shut
down
AOH

49

Unit 3 AWP 2,3,4,5 N/A; no s/by available

TM

major

10/22/2011

50

Unit 3 Online O2 analyser not available

TIC

10/20/2011

51

Unit 3 CHP problems - Stones/Iron Rod etc in coal

CHP-A

minor
shut
down

52

Unit 3 HPT Thrust Pad No. 7 (Temp Out of Scale)

TM/TIC

AOH

10/26/2011

53

Unit 3 BFP master not controlling on Auto

TIC

major

10/26/2011

10/27/2011

54

Unit 3 Compressor in AHP 1,2,3 not avaible

BM

10/27/2011

11/7/2011

55

Unit 3 Coal Feeder-C Shear pin failure

TIC

10/27/2011

11/10/2011

56

Unit 3 ELP Line RV passing

TM 1B

minor
shut
down
AOH

10/27/2011

11/2/2011

57

Oil gun problems (1) AB1 oil gun having oil leakage but
due to BT1 corner inoperative gun cannot be removed
Unit 3
(2) EF2 manual oil v/v spindle is bend (3) AB1, AB4, CD3,
EF4 oil gun svng HMV inoperative

BM1B

major

10/27/2011

10/29/2011

BM

minor
shut
down
AOH

10/29/2011

major

10/29/2011

minor

10/29/2011

46
47

58
59
60
61
62
63
64

Unit 3 pa fan 3b fan de side oil leakage


shh 1 drain line having leakage at u#2 side at wsb row
Unit 3
no 2(NEAR STAIR CASE AT CORNER 4)
Unit 3 s/b line above a/h 3b is having leakage
Lighting cable required to be dressed properly in b/b
Unit 3
cabin
D. G. Set radiator cooling water additional connectin to
Unit 3
be made from drinking/DM water.
BFP MASTER NOT COME ON MANNUAL EVEN AFTER
Unit 3
BFP-3C FLOW 440 & BFP-3A FLOW 400
Unit 3 Clear water pump no.1 NRV passing

TIC

BM-1B
BM-1B

TM-1B
TIC-1B
AHP

shut
down
AOH

10/22/2011
10/22/2011

12/20/2011

10/26/2011

10/29/2011
10/29/2011

10/30/2011
10/29/2011

65

Unit 3 C/Mill leakages 3C Front Door side hole

BM

major

10/30/2011

66

Unit 3 C/Mill leakages 3D , Body hole moter side

BM

10/30/2011

67

Unit 3 C/Mill leakages 3E, Body & Copling leakages

BM

minor
shut
down

68

Unit 3

BM

AOH

10/30/2011

TM-1B

major

10/30/2011

TIC-1B

10/30/2011

10/30/2011

70

Coal leakages through CTP at Elevation AB3,CD3,EF3


(near ws/blower no, 48 &49
BFP-3C MAIN PUMP MECH SEAL LEAKAGE & BAL.
Unit 3
LEAKOF LINE FLANGE JOINT LEAKAGE.
Unit 3 CD-4 desk 3H Vib.showing out of scale reading'

71

Unit 3 ELP 3B DE SIDE GLAND LEAKAGE.

TM-1B

72

Unit 3 ELP 3B ABNORMAL SOUND IN MOTOR NDE BRG.

EM-3B

minor
shut
down
AOH

73

Unit 3 STATOR WATER FILTER NEEDS CLEANING

TM-1B

major

10/31/2011

74

Unit 4 O2 not showing in PCR

TIC

minor

10/27/2011

11/27/2011

75

Unit 4 HD -30 Inoperative

TIC

shut
down

10/31/2011

10/31/2011

76

Unit 5 COC motor of C/F in-operative no.5A, 5C, 5D, 5F, 5G, 5H

EM

AOH

10/24/2011

10/28/2011

77

Unit 5 5-XA Incomer Bkr Gas Pressure Low

EM

major

10/24/2011

11/2/2011

78

TM

minor
shut
down

10/25/2011

11/10/2011

10/28/2011

11/6/2011

AOH

10/28/2011

81

Unit 5 Bearing Chamber exhauster fan


Feed flow and steam flow showing same-needs to be
Unit 5
check on DAS monitor
TDBFP-5B ESG requirement increase for load more than
Unit 5
450 MW
Unit 5 Coal feeder-B tripped on over current

EM

major

10/29/2011

10/29/2011

82

Unit 5 Hydrastep RHS leakage-protection bypass

I&C

10/29/2011

10/29/2011

83

Unit 5 Coal mill-H scapper box inspection

BM

minor
shut
down

84

Unit 5 AS 208 pnuematic control v/v is not working on auto

I&C

AOH

10/31/2011

11/1/2011

85

Unit 5

BM

major

10/31/2011

11/1/2011

86

Unit 6

TM

10/22/2011

11/10/2011

87

Unit 6

minor
shut
down

88

Unit 6

T/M

AOH

10/24/2011

89

Unit 6

TM

major

10/24/2011

90

Unit 6 MDBFP-6D Motor winding Temp rises upto 114 C.

EM

minor

10/24/2011

91

Unit 6 MDBFP 6D having oil leakages at 4 locations.

TMII

shut
down

10/30/2011

92

Unit 6 MDBFP 6C motor to be replaced

EM

AOH

10/24/2011

11/5/2011

93

Unit 6 COC motor of C/F inoperative 6F, 6G, 6H

EM

major

10/24/2011

10/27/2011

69

79
80

AS 208 pnuematic control v/v mannually wheel not


getting engaged.
IAC drier four way vlv inoperative jam
AII BFP (A.B.C,D) seal water controller not working on
auto,resulting water ingresses in Oil
MDBFP -6C Dis vent valve kept open for reducing
Suct/Dis DT.due to R/H S/H NRV passing.
MDBFP-6D . TH . BRG.Temp rises upto 103 deg C.

I&C
TM

I&C

11/3/2011

10/31/2011

10/31/2011

10/31/2011

11/3/2011

10/29/2011

10/24/2011

94

Unit 6 fire fighting pump-P3 UNDER PERMIT

ODP-II

95

Unit 6 AWP-5C ABNORMAL SOUND IN PUMP(NA)

ODP-II

96

Unit 6 AWP-6C MOTOR BRG. TEMP. HIGH(NA)


DM MAKE UP LINE F/J LEAKAGE NEAR U#7 COPRESSOR
Unit 6
ROOM

97
98

Unit 6 Fire fighting booster pump-1 & 2 heavy gland leakage

99

Unit 6

100

FIRE FIGHTING DIESEL BOOSTER PUMP NOT AVAILABLE


DUE TO O/H WORK
Unit 6 DTFA DRAIN OIL TANK PUMP 1 & 2 NOT AVAILABLE

101

Unit 6

102

Unit 6

103

Unit 6 DTFA OIL & WATER SEPARATOR PUMP NOT AVAILABLE

104

Unit 6

minor

10/29/2011

EM

shut
down
AOH

TM-II

major

10/29/2011

TM-II

minor

10/26/2011

10/29/2011

11/24/2011

10/29/2011

11/3/2011

BM-11

shut
down
AOH

AHP AIRCOMPRESSOR & DRYER SYSTEM NOT


AVAILABLE

ODP-II

major

10/30/2011

ESP FIELDS SAFETY KEY LOCKING SYSTEM NOT


AVAILABLE

BM-11

minor

10/30/2011

BM-11

shut
down

10/30/2011

BM-11

AOH

10/31/2011

TM

major

10/30/2011

minor
shut
down

10/30/2011

EM-II,
Test-II

AOH

10/30/2011

TM-II

10/30/2011
10/30/2011

105

SONIC AIR HEATER SOOT BLOWER SYSTEM NOT


WORKING PROPERLY
Unit 6 Generator E/F portection for rotor bypassd

106

Unit 6 UAT-6C oil leakage attending work

EM-II

107

Unit 6 Gen Bus Duct Pressuretion Unit N/A

TMII

108

Unit 6

109

Unit 6 CW Pit D/W Pump N/A

TM-II

major

10/30/2011

110

Unit 6 AWM 10: Supply not available at 1 phase

EM-II

minor

10/30/2011

111

Unit 6 AWM 11: Not getting ON during trial.

TEST-II

shut
down

10/30/2011

10/31/2011

112

Unit 6

TM-II

AOH

10/30/2011

11/2/2011

TM-II

major

10/30/2011

11/2/2011

TM-II

minor
shut
down

10/30/2011

11/1/2011

TEST-II

AOH

10/30/2011

113
114
115
116

MDBFP-6C motor R Phase diffrential protection


operated

AWM 12: Having heavy vibration & water pump not


getting ON
Unit 6 AWM 13: Belt loose & weak needs to be replace
Unit 6 TDBFP 6B:TD2 v/v not operating
GTR Y phase oil pump no.1 flow switch problem auto
Unit 6
pump changeover is not possible.
GENERATOR:Rectifier diode wheel no.1 fuses not visible
Unit 6
from inspection window.

TEST-II

10/31/2011

11/1/2011

11/7/2011

11/5/2011

10/30/2011

117

Unit 6 GTR transfer Pump-6A pump dischare v/v inoperative

TM-II

major

10/30/2011

118

Unit 6 ASDP 3 VIBRATIONS FOUND IN PUMP

ODP-II

10/31/2011

119

Unit 6 OVER FLOW TRANSFER PUMP ONLY ONE AVAILABLE

EM-II

120

Unit 6 WWSB NO 66 REPETITIVE START FAILURE

TEST-II

minor
shut
down
AOH

121

Unit 7 TDBFP-7B mechanical seal leakage

TM

major

10/20/2011

11/5/2011

122

Unit 7 CT fan 7B/5

ODP

10/22/2011

11/22/2011

123

Unit 7 CT fan 7B/7

EM

10/22/2011

10/29/2011

124

Unit 7 HPH 6B extraction valve EX-2 jam

TM

minor
shut
down
AOH

10/26/2011

10/28/2011

125

Unit 7 ESP field B-5 Rectiformer problem

EM

major

10/20/2011

10/28/2011

11/15/2011

10/31/2011
10/31/2011

126

Unit 7 CM-7EF B&S -1 not developing pressure.

127

Unit 7 CM-7GH B&S -2 not developing pressure.

128

Unit 7 COC motor of C/F 7B in-operative

129

Unit 7 Coal mill 7GH girth gear seal air motor not available

130

Unit 7 ACW-B winding temp 145 deg (s/b)

EM

131

Unit 7 GTR Transfer Pump-C pump not available

TM

132

Unit 7 EHG 2

TM

133

Unit 7 Bearing No. 1 Leakage

TM

BM
BM
EM
EM

minor
shut
down
AOH

10/20/2011

11/5/2011

10/20/2011

11/5/2011

10/26/2011

10/28/2011

major

10/27/2011

11/6/2011

minor
shut
down
AOH

10/27/2011

11/3/2011

10/27/2011

11/5/2011

Revised Target Date

Remark
s\D

Scrapping will start on


31/10/11
29/10/11
02/11/11

WIP
shutdown job
S/D

11/2/2011
Restoration of grill

11/1/2011

L.C not found leakage


attended

attended
bearing Available on
04/11/2011
ATTENDED
Pump Available

WIP
bearing Available on
04/11/2011
Attended 27/10/11
S/Coil Replcd. to3ACOP
solenoid coil not
available

Valve charaecteristics is
not linear

strickly to be observation
6/8/9 pad shutdown job
29/10/2011,01/11/11

ATTENDED 27/10/11

11/1/2011

11/10/2011

COC motor 5H found


unbalance send to
rewinding. Rest of all
motors to be checking.
S/D-logic studied

PERMIT ISSUED
PERMIT ISSUED
internal inpsection by bm

BFP C TRIAL TAKEN ON


27/10/11
S/D
S/D
Permit will be taken after
availability of MDBFP-C

11/1/2011

U/P
Permits applied but not
issued COC 6E&6H
checked on date
27/10/11 motor found
ok informed to B/M &
I&C

UNDER PERMIT
PWR 4 initiated ODP
permit applied

S/D
Restoration in s/d
Restoration in s/d
Motor r phase found
open motor replacement
work is in progress
Fuse replacement work
taken at OPD board on
31/10/11

s/d

Under Permit
7B/5 (G/B Case at HO)
11/5/2011
10/31/2011
11/10/2011

11/10/2011

Motor Burnt

Unit-1 to 7
Units

Total

Available

Not available Soot Blowers


I&C/TIC
SB Nos.

BM
Target Date

SB Nos.

WSB status
U-1

32

28

4
(3, 25, 21,31)

U-2

32

29

1(22)

U-3

56

37/49

T=7
10/31/2011
(24,19,46,
50=NC) (30=Not
gtg.stopped,
(
3, 41=LNR)

U-4

56

38

U-5

104

103

1( 23 )

U-6

104

103

3 (96,66,56)

10/31/2011

U-7

104

100

3 (66, 45, 56

attended

U-1

10

10

U-2

10

U-3

20

U-4

20

U-5

32

10/31/2011

3,
(04,14 ,23)
T=5(13=HR) (32
35=
Jam)(39=PVI)(3
3=OR)

1 (68)

LRSB status
42

U-6
U-7
AHSB status
U-1

U-2

10

U-3

U-4

U-5

U-6
U-7
ESP Field status

2(38,42)

Field Nos.

Target Date

Field Nos.

U-1

U-2

U-3

20

19

U-4

20

18

U-5

48

45

1A2,2B2,4D2

U-6

48

45

4A1, 4A2, 2D1

U-7

32

27

A1, A3, A4, B2

Date
30/10/11
Unit-1 to 7
Units

Total Available

2
C5

Not
available
Soot
Blowers
I&C/TIC
SB Nos.

Target Date

WSB status
U-1

32

28

U-2

32

29

1(22)

U-3

56

49

U-4
U-5
U-6
U-7

56
104
104
104

38
104
103
100

8
10/31/2011
(3,19,24,30,
33,41,46,
50)

LRSB status
U-1

10

10

1 (96)
3 (66, 45,
56

10/31/2011

10/31/2011
attended

BM
SB Nos.

4
(3, 25,
21,31)
2
(04,14)
4
(13,32,35,
39)

1 (68)

U-2
U-3
U-4
U-5
U-6
U-7
AHSB status
U-1
U-2
U-3
U-4
U-5
U-6
U-7
ESP Field
status

10
20
20
32

10
4
4
4

42

8
4

2(38,42)

Field Nos.
U-1
U-2
U-3
U-4

6
6
20
20

6
6
19
18

U-5

48

45

U-6

48

45

U-7

32

27

Target Date

Field Nos.

2
C5
1A2,2B2,4
D2
4A1, 4A2,
2D1
A1, A3, A4,
B2

++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++
++++++++

Resaon
EM
Target Date

SB Nos.

Target Date

11/1/2011
IR 17
Attended.
31-Oct

11/1/2011

24.10.11

Since long: 31,36,37,56= Rotary


motor NA) (34,45,46=Both
Rotary and Trans. motor NA)

Target Date

Field Nos.

Target Date

B2 S/D WORK

B5

Resaon

Target Date

EM
SB Nos.

Target
Date

11/1/2011

IR 17 directly getting
'ON', IR 22 No reverse
command.

11/1/2011

24.10.11

Target Date

Field Nos.

Target
Date
B2 S/D WORK

B5

Loss of Generation For 29/10/2011


Reason

UNIT-I

UNIT-II

UNIT-III

UNIT-IV

C/m Problems

0.064

Chp Problem

1.757

Economiser Leakage

0.385

Id Fan Problem
Poor Coal Quality

1.053

1.200

0.658

Unit Synchronisation
And Stabilisation

0.143
0.717

Unit Withdrawing In
Progress

1.053

Total

1.585

0.722

2.617

Loss of Generation For 30/10/2011


Reason

UNIT-I

UNIT-II

UNIT-III

UNIT-IV

Boiler Tube Leakage


C/m Problems

0.019

Coal Mill Problems


Id Fan Problem

0.535

0.030

Poor Coal Quality

Total

1.095

0.960

0.573

0.328

1.095

1.495

0.592

0.358

UNIT-V

UNIT-VI

UNIT-VII

Total

0.000
0.325

0.575

0.428

1.392
1.757
0.385

2.075

2.400

UNIT-V

2.761

3.336

UNIT-VI

1.335

9.225

0.209

0.209

1.972 12.968

UNIT-VII

12.000

Total

12.000
0.000
0.049
0.535

1.730

1.848

6.534
0.000

1.730

1.848 12.000 19.118

CHP Defects/Problems - DPM


CHP-A
SN
A

Description

Major Equipment Problems


a. Stacker Reclaimer
1
2
b. Wagon Tipplers
1
2
c. Crushers
1
2
d. Track Hopper Paddle Feeders
1
2
Conveyors Problems
1
2
Condition Monitoring Observations
1
2
House keeping / Lighting Issues
1
2
DE/DS System Problems
1
2
Chute Leakages
1
2
Dewatering Pumps
1
2
PM jobs Planned Actual
1
2
Critical Spares/Contracts
1
2
Protection Non-availability
1
2
Magnetic Seperators Problems

Responsibility

1
2
L

Other Problems
1
2

10/25/2011
Reporting Date

Target Date

Remark

CHP Defects/Problems - DPM


CHP-B
SN
A

Description

Major Equipment Problems


a. Stacker Reclaimer
1
2
b. Wagon Tipplers
1
2
c. Crushers
1
2
d. Track Hopper Paddle Feeders
1
2
Conveyors Problems
1
2
Condition Monitoring Observations
1
2
House keeping / Lighting Issues
1
2
DE/DS System Problems
1
2
Chute Leakages
1
2
Dewatering Pumps
1
2
PM jobs Planned Actual
1
2
Critical Spares/Contracts
1
2
Protection Non-availability
1
2
Magnetic Seperators Problems

Responsibility

1
2
L

Other Problems
1
2

10/25/2011
Reporting Date

Target Date

Remark