STATION MONTH

1.0 HIGHLIGHTS

1.0 STATION HIGHLIGHTS


1.1 RANKING OF STATIONS (PREVIOUS MONTH)
1.2 BEST ACHIEVED PARAMETERS

1.0 STATION HIGHLIGHTS

1.1 RANKING OF STATION

Note: The latest ranking as per performance evaluation matrix to be provided.

MONTH RANK SCORE

APRIL

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 1 of 6 OPERATION SERVICES


MAY

JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

DECEMBER

JANUARY

FEBRUARY

MARCH

Fin Year

1.2 BEST ACHIEVED PARAMETERS

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 1 of 6 OPERATION SERVICES


Best achieved
Parameters Unit (Till Date)

Value Month

Generation MU

Plant Load Factor %

Availability Factor(on bar) %

AVAILABILITY INCL. RESERVE %

Partial Loading %

APC (OF GEN.) - (%) %

DM Make–up % of MCR

Sp. Oil ml/Kwh

Heat Rate Kcal/Kwh

Coal receipt (Monthly) MT

ANY IMPROVEMENT IN BEST ACHIEVED PARAMETERS SHALL BE DISCUSSED

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 1 of 6 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 1 of 6 OPERATION SERVICES


YEAR

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 1 of 6 OPERATION SERVICES


2.0 MOU AND STATION PERFORMANCE

2.1 VARIATION IN MOU TARGET


2.2 DETAILS OF PARAMETERS WITH RESTORATION PROGRAM
2.3 STATION PERFORMANCE (MONTH)
2.4 STATION PERFORMANCE (CUMULATIVE)
2.5 DETAILS OF OUTAGE LOSS
2.6 DETAILS OF PARTIAL LOSS
2.7 ACTION PLAN INITIATED FOR REDUCTION OF OUTAGE/PARTIAL LOSS

2.1 VARIATION IN MOU TARGET


Parameters 2013-14 Q1 Q2 Q3 Q4 Pro rata

GEN. MU (MOU)*

GEN.MU (ACTUAL)

DC(MOU)%

DC(Actual)%

AVAILABILITY(MOU)%

AVAILABILITY(Actual)%

PLANNED OUTAGE-(MOU)%

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


PLANNED OUTAGE-(Actual)%

FORCED OUTAGE-%

PARTIAL LOADING (%)

HEAT RATE-kCal/kWh

SP. OIL-ml/kWh

AUX. POWER CONS.(%)

INVENTORY-(Rs. Cr)

2.2 DETAILS OF PARAMETERS WITH RESTORATION PROGRAM

Gross Gen. (MU) DC %


DESCRIPTION
Deviation Deviation
Target Actual (+/-) Target Actual (+/-)

APRIL

MAY

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

DECEMBER

JANUARY

FEBRUARY

MARCH

CUMULATIVE
FY Target &
Expected

2.3 STATION PERFORMANCE (MONTH)


Station Performance for MONTH 2013

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


Monthly
Stage I Stage II Stage III Total target Deviation
Generation
Availablity Factor
DC(MU)
SG (MU)
AG (MU)
AG/DC
PO(%)
FO(%)
Forced outage NO
BTL( No/%)
Equipment Partial Loading(%)
Reserve Shutdown(%)
Loading Factor (%)
PLF(%)
APC(%)
Heat Rate(kCal/kWh)
Net Heat Rate(kCal/kWh)
Sp.Oil Consumption ml/kWh
DM Water consump-Cycle(%)
DM Water consump-Cycle(MT)
Non Cycle DM Consumption(MT)

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


Raw Water Consumption(MT)

2.4 STATION PERFORMANCE (CUMULATIVE)


Station Yearly Performance 2013-14
MOU-
Stage I Stage II Stage III Total MOU Actual
Generation 0
Availablity Factor
DC(MU)
SG (MU)
AG (MU)
AG/DC
PO(%)
FO(%)
Forced outage NO
BTL (No/%)
Equipment Partial Loading(%)
Reserve Shutdown(%)
Loading Factor (%)
PLF(%)
APC(%)
Heat Rate(kCal/kWh)

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


Net Heat Rate(kCal/kWh)
Sp.Oil Consumption ml/kWh
DM Water consump-Cycle(%)
DM Water consump-Cycle(MT)
Non Cycle DM Consumption(MT)
Raw Water consumption (MT)

2.5 DETAILS OF OUTAGE LOSS


Monthly Yearly
OUTAGE LOSS
No % MU No % MU
BOILER
TURBINE
ELECTRICAL
OFFSITE
C& I
OPERATION
TRAN / GRID
COAL
NO DEMAND
OTHER

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


2.6 DETAILS OF PARTIAL LOSS
Monthly Yearly
PARTIAL LOSS Remarks
% MU % MU
BOILER
TURBINE
ELECTRICAL
OFFSITE
C& I
OPERATION
TRAN / GRID
COAL SHORTAGE
NO DEMAND
OTHER
*Details of partial loading and reasons to be discussed
2.7 ACTION PLAN INITIATED FOR REDUCTION OF OUTAGE/PARTIAL LOSS
RESPONS
AREA ACTION PLAN
IBILITY

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


Monthly

*Highest of internal/External targets

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


Program for
Balance
Period

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES
Pre.Year
(2012-13)

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES
Remarks

TARGET
DATE

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES


FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 2 of 6 OPERATION SERVICES
3.0 OUTAGE ANALYSIS

No of Outages / Trips MONTH 2013 No of Outages (Yearly)


Units Outages Trips Total Outages Trips Total
1 0.00 30-Dec-99 0:00
2 0.00 30-Dec-99 0:00
3 0.00 30-Dec-99 0:00
4 0.00 30-Dec-99 0:00
5 0.00 30-Dec-99 0:00
6 0.00 30-Dec-99 0:00
` 7 0.00 30-Dec-99 0:00

Outages for MONTH 2013 From To Duration


UNIT01 TURBINE & AUXILARIES
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 3 of 6 OPERATION SERVICES


0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00
0 0 0.00 30-Dec-99 0:00

*Reason for outage and corrective measures to be discussed

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 3 of 6 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 3 of 6 OPERATION SERVICES


Loss(MU)

30-Dec-99
30-Dec-99
30-Dec-99
30-Dec-99
30-Dec-99
30-Dec-99
30-Dec-99
30-Dec-99
30-Dec-99

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 3 of 6 OPERATION SERVICES


30-Dec-99
30-Dec-99
30-Dec-99
30-Dec-99

RATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 3 of 6 OPERATION SERVICES


4.0 ABT ANALYSIS

4.1. ABT GAP ANALYSIS

4.1. ABT GAP ANALYSIS(STAGE-1)

DC DETAILS AG <100 % DC break up (%)

A. DC Inst. DC SG AG Freq > Unit Transmission constraint &


Equpt Others*
MONTH (MU) (%of A) (% of A) (%of A) BEF Trip Regulation

APRIL

MAY

JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

DECEMBER

JANUARY

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG) Sheet 4 of 6 OPERATION SERVICES


FEBRUARY

MARCH

CUMULATIVE

4.1. ABT GAP ANALYSIS(STAGE-2)

DC DETAILS AG <100 % DC break up (%)

A. DC Inst. DC SG AG Freq > Unit Transmission constraint &


Equpt Others*
MONTH (MU) (%of A) (% of A) (%of A) BEF Trip Regulation

APRIL

MAY

JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG) Sheet 4 of 6 OPERATION SERVICES


DECEMBER

JANUARY

FEBRUARY

MARCH

CUMULATIVE

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 4 of 6 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG) Sheet 4 of 6 OPERATION SERVICES


4.0 ABT ANALYSIS

4.2 SCATTER DIAGRAM (AG/DC PLOT AGAINST FREQUENCY)- FOR THE MONTH
4.3 OPPORTUNITY MATRIX (FOR STATIONS UNDER ABT):

4.2 SCATTER DIAGRAM (AG/SG PLOT AGAINST FREQUENCY)-FOR THE MONTH


IDEAL PLOT

1.1
Max 105% of DC
1.05

1
AG/DC
0.95
AG/SG
0.9

0.85

0.8 BEF
Min.80% of DC
0.75
49.5 49.6 49.7 49.9 49.98 50 50.02 50.2 50.3 50.4 50.5

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 5 of 6 OPERATION SERVICES


Note: If ABT is followed stage wise ,please add additional formats/graphs

4.3 OPPORTUNITY MATRIX (FOR STATIONS UNDER ABT):


3. Freq>
1.Freq between
2.Freq< (BEF-0.02 Hz) (BEF+0.02) Hz 4. Freq.>50.2 Hz
(BEF+/-0.02 Hz)
&<50.2 Hz

MONTH
1.1. 1.2. 1.3. 2.1. 2.2. 2.3. 3.1. 3.2. 4.1. 4.2
Duration Duration Duration Duration Duration Duration Duration Duration Duration Duration
when when when when when when when when when when
AG<SG, % AG=SG, % AG>SG, % AG<SG, % AG=SG, % AG>SG, % AG<SG, % AG>SG, % AG<SG, % AG>SG, %

APRIL

MAY

JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

DECEMBER

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 5 of 6 OPERATION SERVICES


JANUARY

FEBRUARY

MARCH

CUM.

Note: Indicates good performance

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 5 of 6 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 5 of 6 OPERATION SERVICES


5.0 AVAILABILITY LOSS ANALYSIS

5.1 TREND OF AVAILABILITY LOSS (STATION) FOR LAST 9 YEARS (%)

5.1 TREND OF AVAILBILITY LOSS (STATION) FOR LAST 9 YEARS (%)

16

14

12

PLANNED
10
GRID (Reserve)

8 GRID (Regulation)

TOTAL FORCED
OUTAGE
6 (WITHOUT COAL)

TOTAL FORCED
4 OUTAGE
(WITH COAL)

0
2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 20012-13
Till Date (Same
Period)

20012-13
2013-14 Till (Same
Description 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 Date Period)

PLANNED 3 2.8 3.5 7 5.2 2 4.2 3.9 3 2.8

GRID (Reserve) 2.8 3.1 2.8 2.9 3.4 3.6 2.9 3.7 2.8 3.1

GRID (Regulation)
TOTAL FORCED 1.8 1.9 2.5 3.2 2 2.9 0.5 4 1.8 1.9
OUTAGE
(WITHOUT COAL)
TOTAL FORCED 7.6 7.8 8.8 13.1 10.6 8.5 7.6 11.6 7.6 7.8
OUTAGE
(WITH COAL) 9.2 8.1 9.3 14.3 11 8.9 7.8 12 9.2 8.1

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 6 of 6 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 1-5 (EEMG-1) Sheet 6 of 6 OPERATION SERVICES