CONTRACT
AMOUNT (RM)
DESCRIPTIONS
PAINTING WORKS
FUTSAL HALL
INDOOR GAMES HALL
GRANDSTAND
Administration Block
Changing Block
M&E Block (Main Stadium)
M&E Block (Swimming Pool)
Covered Linkway
WORKDONE (%)
PREVIOUS
CURRENT
PAYABLE AMOUNT
(RM)
22,595.00
24,269.30
63,633.10
9,250.00
2,834.10
1,598.00
3,356.60
432.00
18,076.00
23,055.84
63,633.10
8,787.50
2,692.40
1,598.00
3,356.60
432.00
127,968.10
121,631.43
(6,081.57)
SUMMARY / 1
115,549.86
UNIMAS
ITEM
DESCRIPTION
CONTRACT
AMOUNT
799.00
3,374.50
85.00
1,666.00
4,996.00
2,456.00
140.00
252.00
7,732.00
WORKDONE
PREVIOUS
CURRENT
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
21,500.50
4.13/2
4.13/3
C
D
E
F
G
H
I
J
K
L
102.20
2.80
142.80
252.00
72.00
144.00
36.00
197.10
2.80
142.80
PAYABLE
AMOUNT (RM)
639.20
2,699.60
68.00
1,332.80
3,996.80
1,964.80
112.00
201.60
6,185.60
17,200.40
81.76
2.24
114.24
201.60
57.60
115.20
28.80
157.68
2.24
114.24
1,094.50
875.60
21,500.50
1,094.50
17,200.40
875.60
22,595.00
18,076.00
22,595.00
18,076.00
CARRIED TO SUMMARY
22,595.00
18,076.00
COLLECTION
PAGE NO. 4.13/1
PAGE NO. 4.13/2
Page 2
UNIMAS
CADANGAN PEMBINAAN DAN PENYIAPAN KOMPLEKS KEMUDAHAN SUKAN DAN REKREASI DI KAMPUS
UNIVERSITI MALAYSIA SARAWAK (UNIMAS), KOTA SAMARAHAN, SARAWAK
PAINTING WORKS
SUB-CONTRACT NO. : PBMSB/UNIMAS/PAINTING/KKH/01(25)
SUB-CONTRACTOR : KKH SUPPLIER
PAYMENT CERTIFICATE NO. 5
WORK DONE AS AT: 30 September 2011
BILL NO. 5 - INDOOR GAMES HALL
PAGE
ITEM
DESCRIPTION
CONTRACT
AMOUNT (RM)
433.50
4,377.50
1,241.00
1,980.50
6,032.00
476.00
4,428.00
32.00
116.00
20.00
WORKDONE
PREVIOUS
CURRENT
60.00%
60.00%
60.00%
60.00%
60.00%
60.00%
60.00%
60.00%
60.00%
60.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
19,136.50
5.13/2
A
B
H
I
J
5.13/3
A
B
C
D
E
Flush Doors
Louvres Doors
Door Frames 150mm - 300mm
Stopper NE 150mm
Architraves NE 150mm
228.00
3,832.00
224.10
2.80
161.00
5.13/4
411.83
4,158.63
1,178.95
1,881.48
5,730.40
452.20
4,206.60
30.40
110.20
19.00
18,179.68
60.00%
60.00%
60.00%
60.00%
60.00%
95.00%
95.00%
95.00%
95.00%
95.00%
60.00%
60.00%
60.00%
60.00%
60.00%
95.00%
95.00%
95.00%
95.00%
95.00%
4,447.90
45.00
252.00
224.10
2.80
161.00
PAYABLE
AMOUNT (RM)
216.60
3,640.40
212.90
2.66
152.95
4,225.51
42.75
239.40
212.90
2.66
152.95
684.90
650.66
19,136.50
4,447.90
684.90
18,179.68
4,225.51
650.66
24,269.30
23,055.84
24,269.30
23,055.84
CARRIED TO SUMMARY
24,269.30
23,055.84
COLLECTION
PAGE NO. 5.13/1
PAGE NO. 5.13/2
PAGE NO. 5.13/3
Page 3
UNIMAS
CADANGAN PEMBINAAN DAN PENYIAPAN KOMPLEKS KEMUDAHAN SUKAN DAN REKREASI DI KAMPUS UNIVERSITI
MALAYSIA SARAWAK (UNIMAS), KOTA SAMARAHAN, SARAWAK
PAINTING WORKS
SUB-CONTRACT NO. : PBMSB/UNIMAS/PAINTING/KKH/01(25)
SUB-CONTRACTOR : KKH SUPPLIER
PAYMENT CERTIFICATE NO. 5
WORK DONE AS AT: 30 September 2011
BILL NO. 6 - GRANDSTAND (PART 1)
PAGE
ITEM
DESCRIPTION
CONTRACT
AMOUNT (RM)
246.50
11,883.00
1,929.50
5,015.00
450.50
408.00
136.40
137.60
WORKDONE
PREVIOUS
CURRENT
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
20,206.50
6.13/2
A
B
C
D
E
F
G
H
I
14,196.00
12,368.00
4,564.00
348.00
2,092.00
37.00
200.00
2,700.00
924.00
6.13/4
A
B
C
D
E
F
G
H
I
J
DF NE 150mm
Stopper NE 150mm
Architraves NE 150mm
Solid Core Doors
Flush Doors
Louvre Doors
Fire Rated Doors
DF 150mm - 300mm
Stopper NE 150mm
Architraves NE 150mm
523.60
8.40
725.20
2,043.00
369.00
504.00
81.00
1,009.80
8.40
725.20
246.50
11,883.00
1,929.50
5,015.00
450.50
408.00
136.40
137.60
20,206.50
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
80.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
37,429.00
6.13/3
PAYABLE
AMOUNT (RM)
14,196.00
12,368.00
4,564.00
348.00
2,092.00
37.00
200.00
2,700.00
924.00
37,429.00
100.00%
100.00%
100.00%
80.00%
80.00%
80.00%
80.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
523.60
8.40
725.20
2,043.00
369.00
504.00
81.00
1,009.80
8.40
725.20
5,997.60
5,997.60
20,206.50
37,429.00
5,997.60
20,206.50
37,429.00
5,997.60
63,633.10
63,633.10
63,633.10
63,633.10
CARRIED TO SUMMARY
63,633.10
63,633.10
COLLECTION
PAGE NO. 6.13/1
PAGE NO. 6.13/2
PAGE NO. 6.13/3
Grandstand 4 / 8
UNIMAS
7.13/3
7.SUM/1
F
G
H
I
J
K
L
COLLECTION
PAGE NO. 7.13/1
PAGE NO. 7.13/2
126.90
61.60
243.00
144.00
18.00
126.90
61.60
8,044.60
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
120.56
58.52
230.85
136.80
17.10
120.56
58.52
782.00
742.90
8,468.00
782.00
8,044.60
742.90
9,250.00
8,787.50
9,250.00
8,787.50
CARRIED TO SUMMARY
9,250.00
8,787.50
Admin / 5
UNIMAS
CADANGAN PEMBINAAN DAN PENYIAPAN KOMPLEKS KEMUDAHAN SUKAN DAN REKREASI DI KAMPUS
UNIVERSITI MALAYSIA SARAWAK (UNIMAS), KOTA SAMARAHAN, SARAWAK
PAINTING WORKS
SUB-CONTRACT NO. : PBMSB/UNIMAS/PAINTING/KKH/01(25)
SUB-CONTRACTOR : KKH SUPPLIER
PAYMENT CERTIFICATE NO. 5
WORK DONE AS AT: 30 September 2011
BILL NO. 8 - CENTRAL SUPPORT FACILITIES - CHANGING BLOCK
CONTRACT
PAGE
ITEM
DESCRIPTION
AMOUNT (RM)
PAINTING AND DECORATING
8.13/1
A
Ext Walls & Columns
1,810.50
B
Ledge
153.00
C
Int Walls & Columns
340.00
D
Surfaces Skim Coat
164.00
E
UAC Superflex Ceiling
124.00
WORKDONE
PREVIOUS
CURRENT
95.00%
95.00%
95.00%
95.00%
95.00%
2,591.50
8.13/2
8.13/3
8.SUM/1
A
B
C
D
E
F
G
H
I
DF 150mm - 300mm
Stopper NE 150mm
Architraves NE 150mm
Solid Core Doors
Flush Doors
Mullions
DF 150mm - 300mm
Stopper NE 150mm
Architraves NE 150mm
COLLECTION
PAGE NO. 8.13/1
PAGE NO. 8.13/2
21.60
2.80
29.40
81.00
45.00
9.00
21.60
2.80
29.40
PAYABLE
AMOUNT (RM)
1,719.98
145.35
323.00
155.80
117.80
2,461.93
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
20.52
2.66
27.93
76.95
42.75
8.55
20.52
2.66
27.93
242.60
230.47
2,591.50
242.60
2,461.93
230.47
2,834.10
2,692.40
2,834.10
2,692.40
CARRIED TO SUMMARY
2,834.10
2,692.40
Changing / 6
UNIMAS
CADANGAN PEMBINAAN DAN PENYIAPAN KOMPLEKS KEMUDAHAN SUKAN DAN REKREASI DI KAMPUS
UNIVERSITI MALAYSIA SARAWAK (UNIMAS), KOTA SAMARAHAN, SARAWAK
PAINTING WORKS
SUB-CONTRACT NO. : PBMSB/UNIMAS/PAINTING/KKH/01(25)
SUB-CONTRACTOR : KKH SUPPLIER
PAYMENT CERTIFICATE NO. 5
WORK DONE AS AT: 30 September 2011
BILL NO.10 - EXTERNAL AND ANCILLARY WORKS
PAGE
ITEM
DESCRIPTION
CONTRACT
AMOUNT (RM)
816.00
WORKDONE
PREVIOUS
CURRENT
70.00%
100.00%
816.00
10.12/12
10.12/13
A
B
C
Gutters
Int paint Walls and Columns
Isolated Roof Beams
COLLECTION
PAGE NO. 10.12/11
PAGE NO. 10.12/12
M&E BLOCK (MAIN STADIUM)
PAGE
ITEM
DESCRIPTION
54.00
540.00
188.00
10.13/17
PAGE
B
C
D
E
95.00%
95.00%
95.00%
100.00%
100.00%
100.00%
54.00
540.00
188.00
782.00
782.00
816.00
782.00
816.00
782.00
1,598.00
1,598.00
CONTRACT
AMOUNT (RM)
1,249.50
280.50
996.00
440.00
WORKDONE
PREVIOUS
CURRENT
100.00%
100.00%
100.00%
100.00%
64.80
243.00
18.00
64.80
PAYABLE
AMOUNT (RM)
1,249.50
280.50
996.00
440.00
2,966.00
100.00%
100.00%
100.00%
100.00%
64.80
243.00
18.00
64.80
390.60
390.60
COLLECTION
PAGE NO. 10.13/15
PAGE NO. 10.13/16
2,966.00
390.60
2,966.00
390.60
3,356.60
3,356.60
ITEM
DESCRIPTION
COVERED LINKWAY
10.11/13
E
Inner Surfaces Gutters
10.11/14
816.00
816.00
2,966.00
10.13/16
PAYABLE
AMOUNT (RM)
CONTRACT
AMOUNT (RM)
432.00
WORKDONE
PREVIOUS
CURRENT
100.00%
PAYABLE
AMOUNT (RM)
432
432.00
432.00
COLLECTION
PAGE NO. 10.11/13
432.00
432.00
COVERED LINKWAY
432.00
432.00
UNIMAS