Professional Documents
Culture Documents
In The SAP R
In The SAP R
You can transfer the following master data: Plants Material masters Customer masters Vendor masters Production process models (BOM and routing/recipe) Note: PP/PI:You must define a production version in the material master record and enter the routing number in the field Group in Detailed Scheduling and Rate-Based Planning. This means that a production process model can be generated in SAP APO by combining the BOM and the routing. PM/SM: The production version has no effect on the production process model from Service Management (PM/SM). A valid routing for this model can be found in the service product table (T399A). It is not possible to assign a BOM. Materials are later assigned in the PPM according to a different logic. Work Centers