DEEP CYCLE BATTERY SYSTEM ACCEPTANCE DOCUMENT

Site Name Site ID Name of Zain Representative Name of Vendor and representative

ITEM #

Battery Cabinet Check that the Cabinet is level Check that the cabinet base is secured (were applicable) Check that the cabinet door securing method is in place

Yes

No

Observation and Action

Status (Pass/Fail)

1 2 3

ITEM #

Batteries Record battery capacity(600AH) Check that all cables are properly secured using cable ties Check that the battery orientation is correct Check that the battery connections are properly done Check that the inter cell connectors are mounted(were applicable) Battery terminal torque is correct Is the battery properly terminated to rectifier? Are the batteries without damage or leakage

Yes

No

Observation and Action

Status (Pass/Fail)

1 2 3 4 5 6 7 8

ITEM #

Electrical Installation All burrs and wire off cuts are removed (especially inside the cabinet) Check that all terminations are tight and secure Check that all duct ,cable entry are neat Check that all cable joints are neat (were applicable)

Yes

No

Observation and Action

Status (Pass/Fail)

2 3 4

ITEM #

Battery charging Check that at list three rectifier modules are working Ensure that the batteries are charged for a minimum of 72hours before they can be loaded(Loading before charging can damage the batteries)

Yes

No

Observation and Action

Status (Pass/Fail)

1 2