T Street From 7th Street, NW to Florida Avenue, NW Wiltberger Street From S Street, NW to T Street, NW Three Alleys
Legend
Resurfacing (Future Work) Reconstruction Enhancement (Future Work)
Roadway reconstruction with concrete pavers Sidewalk reconstruction with concrete pavers Relocating/upgrading water main line Installation of high visibility crosswalks Upgrading the streetscape and landscape Upgrading traffic signal and streetlights Reconstruct/relocate wheelchair ramps to meet ADA guidelines Upgrading drainage systems Designated bike lane Installation of centralized parking meters
TypicalSections T
T Street Design
T STREET SECTION
LOOKING WEST
Proposed T Street
T Street Design
Willow Oak Tree
TSTREET/ELLINGTONPLAZA
Ellington Plaza
The scope of work consists of the following improvements to Ellington Plaza:
Reconstruction of Ellington Plaza with concrete pavers Installation of planters and granite benches Installation of sculpture with special lighting by DC Commission on Arts and Humanities
Ellington Plaza
LOOKING NORTH
Roadway reconstruction with asphalt pavement Sidewalk reconstruction with concrete/brick Installation of high visibility crosswalk Upgrading streetlights Reconstruct/relocate wheelchair ramps to meet ADA guidelines Installation of drainage system Installation of centralized parking meter
Streetscape Furnishings
Existing Lights Proposed Lights
Alleys
The scope of work consists of the following improvements on Alleys:
Reconstruction of Alley between S Street and T Street Reconstruction of Alley between T Street and Florida Avenue Reconstruction of Alley north of S Street between Wiltberger Street and Alley
Maintenance Of Traffic
The contractor shall maintain safe access for pedestrians crossing at the intersections The contractor shall maintain pedestrian and vehicular access to properties at all times. The contractor shall provide at least one travel lane along T and Wiltberger Streets at all time while traffic is being maintained.
Maintenance Of Traffic
There will be in three phases of the Project: T street NW from 7th street to Florida Avenue NWPhase I Wiltberger Street from S Street to T Street NWPhase II AlleysPhase III NOTE: These sequences can be changed by the contractor.
QUESTIONS?
Roadway resurfacing Sidewalk reconstruction with asphalt and PCC base Installation of high visibility crosswalks Reconstruct/relocate wheelchair ramps to meet ADA guidelines Upgrading traffic signals and streetlights Upgrading the streetscape and landscape Upgrading drainage structures
QUESTIONS?