HOWARD THEATER AREA REHABILITATION

T Street From 7th Street, NW to Florida Avenue, NW Wiltberger Street From S Street, NW to T Street, NW Three Alleys

Infrastructure Project Management Administration District Department of Transportation November 2, 2011

ATIONAP Project Location Map

Legend
Resurfacing (Future Work) Reconstruction Enhancement (Future Work)

Improvements on T Street between 7th St. & Florida Avenue


The scope of work includes the following roadway improvements on T Street:

Roadway reconstruction with concrete pavers Sidewalk reconstruction with concrete pavers Relocating/upgrading water main line Installation of high visibility crosswalks Upgrading the streetscape and landscape Upgrading traffic signal and streetlights Reconstruct/relocate wheelchair ramps to meet ADA guidelines Upgrading drainage systems Designated bike lane Installation of centralized parking meters

TStreet Existing Condition - T St.

Typical Sections- T St.

TypicalSections T

Existing Typical Section - T STREET


Looking East

Proposed Typical Section - T STREET


Looking East

T Street Design
T STREET SECTION

LOOKING WEST

Proposed T Street

T Street Design
Willow Oak Tree

TSTREET/ELLINGTONPLAZA

Creeping Lily Turf

Ornamental Street Tree Fence

Grey Mix Blue Grey Mix Concrete Unit Pavers

District Trash Can Bike Rack #16 Lighting Pole

Ellington Plaza
The scope of work consists of the following improvements to Ellington Plaza:
Reconstruction of Ellington Plaza with concrete pavers Installation of planters and granite benches Installation of sculpture with special lighting by DC Commission on Arts and Humanities

Ellington Plaza

Ellington Plaza Design


ELLINGTON PLAZA SECTION

LOOKING NORTH

Sculpture at Ellington Plaza

DC Commission on the Arts and Humanities

Sculpture at Ellington Plaza

DC Commission on the Arts and Humanities

Improvements on Wiltberger Street between T St. & S St.


The scope of work consists of the following roadway improvements on Wiltberger Street:

Roadway reconstruction with asphalt pavement Sidewalk reconstruction with concrete/brick Installation of high visibility crosswalk Upgrading streetlights Reconstruct/relocate wheelchair ramps to meet ADA guidelines Installation of drainage system Installation of centralized parking meter

Proposed Wiltberger Street from S to T Street

Typical Section- Wiltberger Street

Existing & Proposed Typical Section Looking South

Streetscape Furnishings
Existing Lights Proposed Lights

Tree Well Treatments


Proposed Tree Fence

Centralized Parking Meter

Alleys
The scope of work consists of the following improvements on Alleys:

Reconstruction of Alley between S Street and T Street Reconstruction of Alley between T Street and Florida Avenue Reconstruction of Alley north of S Street between Wiltberger Street and Alley

Maintenance Of Traffic
The contractor shall maintain safe access for pedestrians crossing at the intersections The contractor shall maintain pedestrian and vehicular access to properties at all times. The contractor shall provide at least one travel lane along T and Wiltberger Streets at all time while traffic is being maintained.

Maintenance Of Traffic

There will be in three phases of the Project: T street NW from 7th street to Florida Avenue NWPhase I Wiltberger Street from S Street to T Street NWPhase II AlleysPhase III NOTE: These sequences can be changed by the contractor.

HOWARD THEATER AREA REHABILITATION


Project Communication Establishment of a Project Website DTAP Project Public Information Consultant Letters to Residents/Flyers Construction Field Office

HOWARD THEATER AREA REHABILITATION


Project Schedule Bid Opening Date Estimated Contract Award Estimated Begin Construction 10/27/2011 11/18/2011 12/01/2011

HOWARD THEATER AREA REHABILITATION


Project Contact Olusegun Olaore, DDOT-IPMA Office: 202-671-4562 Email: olusegun.olaore@dc.gov Construction Team Const. Mgr.: Contractor: Volkert & Associates Fort Myer Construction

QUESTIONS?

Future Streetscape Improvements

ProjectLimits: 7th StreetFromNStreetNW toFloridaAvenueNW

Improvements on 7th Street NW between N St. & Florida Avenue - Future


The scope of work consists of the following roadway improvements on 7th Street:

Roadway resurfacing Sidewalk reconstruction with asphalt and PCC base Installation of high visibility crosswalks Reconstruct/relocate wheelchair ramps to meet ADA guidelines Upgrading traffic signals and streetlights Upgrading the streetscape and landscape Upgrading drainage structures

Installation of centralized parking meters

Typical Section-7th Street NW