Client: FHR
Location: Amtoli, Hobigong, Sylhet
Sub: Construction works Of Masjid
Quotation
Sl
1
2
3
4
5
6
7
8
9
1
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
Particulars
Unit
Earth Excavation
Earth back filling
Soil Filling
BFS
R.C.C. Casting (1:1.5:3)
R.C.C. Casting (1:2:4)
C.C. Casting (1:3:6)
1st Class 10" Brick wall
works(1:6)
1st Class 5" Bricks wall
works(1:6)
cft
cft
cft
sft
cft
cft
cft
cft
sft
sft
40 grade MS bar
PVC Door
Quantity
3691
2186
20000
3362
164
1182
865
1590
Rate
5
3.5
14
30
340
265
150
126
Amount(tk)
18,455.00
7,651.00
280,000.00
100,860.00
55,760.00
313,230.00
129,750.00
200,340.00
4700
63
296,100.00
1516
152
230,432.00
7750
15
116,250.00
3375
15
50,625.00
2.1
65000
136,500.00
4500
160
500
350
350
2966
95
1000
85
4526
150
18,000.0
0
80,000.0
0
122,500.
00
281,770.
00
85,000.0
0
678,900.00
3468
68
235,824.00
600
3000
sft
sft
MT
Pcs
Wooden Door
sft
Wooden window
sft
Floor Tiles
sft
Wall Tiles
sft
sft
sft
Ventilator
pcs
344,0947.0
0
rft
88
60
GI pipe
3 upvc pipe
Bangla Pan
Urinal
Basin
rft
rft
pcs
pcs
pcs
86
120
3
2
3
40
65
2000
1200
4000
5,280.00
3,440.00
7,800.00
6,000.00
2,400.00
12,000.00
Paper holder
Tape
Plumbing & Sanitary fitting
materials
Plumbing & Sanitary labour
Subtotal of Plumbing &
Sanitary works
Electric works:
Fan
Energy light
Signal light
Chandelier
Switch
MK Steel box
Cable 1.5 RM
Cable 2.5 RM
Cable 6 RM
2 pin & 3 pin Shoket
upvc pipe
Others Accessories
Labour Charge
Subtotal of Electric works
pcs
pcs
L/S
5
13
300
400
10,000.00
15,000
68,620.00
pcs
pcs
pcs
pcs
pcs
pcs
coil
coil
coil
pcs
rft
27
21
2
1
55
25
8
4
1
10
500
L.S
3200
1500
500
15000
150
25
1900
2950
7000
200
3.5
Total cost
In words Tk Thirty Seven Lac Twenty Thousand ninety Two Only
Note: Vat & Tax not included
Payment terms:
1,500.00
5,200.00
86,400.00
31,500.00
1000.00
15000.00
8,250.00
625.00
15,200.00
11,800.00
7,000.00
2,000.00
1,750.00
5000.00
25,000.00
210,525.00
372,0092.0
0