Date: November 01, 2011

Client: FHR
Location: Amtoli, Hobigong, Sylhet
Sub: Construction works Of Masjid
Quotation
Sl

1
2
3
4
5
6
7
8
9
1
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1

Particulars

Unit

Earth Excavation
Earth back filling
Soil Filling
BFS
R.C.C. Casting (1:1.5:3)
R.C.C. Casting (1:2:4)
C.C. Casting (1:3:6)
1st Class 10" Brick wall
works(1:6)
1st Class 5" Bricks wall
works(1:6)

cft
cft
cft
sft
cft
cft
cft

1st Class Bricks works(1:6)

cft

Plastering on wall (1:6)

sft

Painting/colour wash on wall

sft

40 grade MS bar
PVC Door

Quantity
3691
2186
20000
3362
164
1182
865
1590

Rate
5
3.5
14
30
340
265
150
126

Amount(tk)
18,455.00
7,651.00
280,000.00
100,860.00
55,760.00
313,230.00
129,750.00
200,340.00

4700

63

296,100.00

1516

152

230,432.00

7750

15

116,250.00

3375

15

50,625.00

2.1

65000

136,500.00

4500

160

500

350

350

2966

95

1000

85

4526

150

18,000.0
0
80,000.0
0
122,500.
00
281,770.
00
85,000.0
0
678,900.00

3468

68

235,824.00

600

3000

sft
sft

MT
Pcs

Wooden Door

sft

Wooden window

sft

Floor Tiles

sft

Wall Tiles

sft

Tin & Frame

sft

Gypsum false ceiling

sft

Ventilator

pcs
344,0947.0
0

Subtotal of civil works


Plumbing & Sanitary works
GI pipe

rft

88

60

GI pipe
3 upvc pipe
Bangla Pan
Urinal
Basin

rft
rft
pcs
pcs
pcs

86
120
3
2
3

40
65
2000
1200
4000

5,280.00
3,440.00
7,800.00
6,000.00
2,400.00
12,000.00

Paper holder
Tape
Plumbing & Sanitary fitting
materials
Plumbing & Sanitary labour
Subtotal of Plumbing &
Sanitary works
Electric works:
Fan
Energy light
Signal light
Chandelier
Switch
MK Steel box
Cable 1.5 RM
Cable 2.5 RM
Cable 6 RM
2 pin & 3 pin Shoket
upvc pipe
Others Accessories
Labour Charge
Subtotal of Electric works

pcs
pcs
L/S

5
13

300
400

10,000.00
15,000
68,620.00

pcs
pcs
pcs
pcs
pcs
pcs
coil
coil
coil
pcs
rft

27
21
2
1
55
25
8
4
1
10
500
L.S

3200
1500
500
15000
150
25
1900
2950
7000
200
3.5

Total cost
In words Tk Thirty Seven Lac Twenty Thousand ninety Two Only
Note: Vat & Tax not included

Md. Belayet Hossain


Executive (Accounts)

Payment terms:

1,500.00
5,200.00

1st Installment: after Phase 1 completion of total work


2nd Installment: after Phase 2 completion of total work
3rd Installment: after Phase 3 completion of total work
Final Installment: after Phase 4 with consultancy completion of total work

86,400.00
31,500.00
1000.00
15000.00
8,250.00
625.00
15,200.00
11,800.00
7,000.00
2,000.00
1,750.00
5000.00
25,000.00
210,525.00